IMPACTFEES.ORG

Walton County, Florida Impact Fees

Impact fees in Walton County depend on where you build. This page details the rates for unincorporated Walton County: at least $8,369.77 per single-family unit as of . One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Walton County impact fees by project type

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Walton County: Single-Family Impact Fees

A new single-family home in unincorporated Walton County pays at least $8,369.77 per unit in impact fees (rates sourced July 28, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection Fee (South Walton Utility Co.) ($4,955.83), Water Connection Fee (South Walton Utility Co.) ($2,913.94) and Fire Impact Fee (South Walton Fire District) ($500.00).

Mobility Fee — Transportation (Walton County) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Walton County impact fee schedule
Water$2,913.94
  • Water Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Co. water connection fee (unincorporated South Walton), effective 10/1/2025: $2,913.94 per unit (1.00 ERU; includes impact fee and 3/4-inch meter). Serves the 30A/coastal area; north Walton uses private wells or Regional Utilities.
    $2,913.94
Sewer$4,955.83
  • Sewer Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Co. sewer connection fee (unincorporated South Walton), effective 10/1/2025: $4,955.83 per unit (1.00 ERU; includes impact fee and inspection). Additional lateral charges may apply. North Walton is largely on septic.
    $4,955.83
City$0.00
County$500.00
  • Fire Impact Fee (South Walton Fire District)
    South Walton Fire District
    South Walton Fire District impact fee (unincorporated South Walton): $500 for a single-family home of 2,000 sq ft or less under roof; homes over 2,000 sq ft pay $0.25/sq ft. North Walton areas are served by the Argyle and Liberty fire districts, whose impact fees are not published.
    $500.00
  • School Impact Fee (Walton County — None Found)
    Walton County School District
    Walton County levies no school impact fee. Its only development impact fee is the transportation Mobility Fee; there are no county parks, library, EMS, or law-enforcement impact fees.
    $0.00
  • Mobility Fee — Transportation (Walton County)
    South Walton
    Walton County
    Walton County's transportation Mobility Fee is not currently collected: Florida Senate Bill 180 (2025) voided the fee ordinance and the county is refunding fees paid under it, so a developer pays $0 mobility fee at this time. If reinstated, the adopted South Walton area rate — the highest of the county's four assessment areas — is $1,362 per 1,000 sq ft of living area ($2,724 for a 2,000 sq ft home). Applies in unincorporated Walton only.
    Requires confirmation
Total (unincorporated Walton County): $8,369.77
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Walton County: Multifamily Impact Fees

A new multifamily unit in unincorporated Walton County pays at least $9,369.77 per unit in impact fees (rates sourced July 28, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection Fee (South Walton Utility Co., MF) ($4,955.83), Water Connection Fee (South Walton Utility Co., MF) ($2,913.94) and Fire Impact Fee (South Walton Fire District, MF) ($1,500.00).

Mobility Fee — Transportation (Walton County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Walton County impact fee schedule
Water$2,913.94
  • Water Connection Fee (South Walton Utility Co., MF)
    South Walton Utility Company, Inc.
    South Walton Utility Company water connection fee: $2,913.94 per multifamily unit (1.00 ERU each), effective October 1, 2025. Serves the unincorporated South Walton (30A/coastal) area; master-meter sizing can adjust the total.
    $2,913.94
Sewer$4,955.83
  • Sewer Connection Fee (South Walton Utility Co., MF)
    South Walton Utility Company, Inc.
    South Walton Utility Company sewer connection fee: $4,955.83 per multifamily unit (1.00 ERU each), effective October 1, 2025. Serves the unincorporated South Walton (30A/coastal) area.
    $4,955.83
City$0.00
County$1,500.00
  • Fire Impact Fee (South Walton Fire District, MF)
    South Walton Fire District
    South Walton Fire District impact fee for multifamily/commercial: $1,500 by check ($1,560 by card) for a structure of 2,000 sq ft or less under roof; larger structures pay $0.75/sq ft by check ($0.78/sq ft by card). Effective June 10, 2019. Applies in the South Walton Fire District (coastal/30A). Argyle and Liberty Fire Districts serve other unincorporated areas.
    $1,500.00
  • School Impact Fee (Walton County — None Found, MF)
    Walton County School District
    Walton County does not levy a school impact fee.
    $0.00
  • Mobility Fee — Transportation (Walton County, MF)
    South Walton
    Walton County
    Walton County's transportation Mobility Fee is not currently collected: Florida Senate Bill 180 (2025) voided the fee ordinance and the county is refunding fees paid under it, so a multifamily developer pays $0 mobility fee at this time. If reinstated, the adopted South Walton area rate — the highest of the county's four areas — is $868 per bedroom ($1,736 for a 2-bedroom unit). Applies in unincorporated Walton only.
    Requires confirmation
Total (unincorporated Walton County): $9,369.77
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Walton County: Commercial Impact Fees

Commercial development in unincorporated Walton County pays $3.34 per square foot in impact fees, plus $7,869.77 in one-time water and sewer connection fees (rates sourced July 28, 2026).

For a 50,000 sq ft building, that comes to about $174,869.77. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (South Walton Utility Co.) ($4,955.83 one-time) and Water Connection Fee (South Walton Utility Co.) ($2,913.94 one-time).

Fire Impact Fee (South Walton Fire District, Commercial) and Mobility Fee — Transportation (Walton County, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.

View the full Walton County impact fee schedule
Water$2,913.94 one-time
  • Water Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Company water connection fee, effective October 1, 2025. The nonresidential fee is based on a land-use ERU factor; the amount shown is the 1.0-ERU minimum. A meter charge by size applies in addition. SWU serves the unincorporated South Walton (30A/coastal) area; much of northern Walton is on septic or served by other utilities.
    $2,913.94 one-time
Sewer$4,955.83 one-time
  • Sewer Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Company sewer connection fee, effective October 1, 2025. The nonresidential fee is based on a land-use ERU factor; the amount shown is the 1.0-ERU minimum (including inspection). A lateral connection charge applies in addition. SWU serves the unincorporated South Walton area.
    $4,955.83 one-time
County$3.34/sq ft
  • Mobility Fee — Transportation (Walton County, Commercial)
    South Walton
    Walton County
    Walton County Mobility Fee (Ord. 2023-29), the county's only development impact fee, applies to development in unincorporated Walton County only (municipalities are excluded unless they opt in). The rate shown is the South Walton assessment area — highest of 4 rate districts. A 3–5% administrative surcharge applies in addition.
    $2.59/sq ftRequires confirmation
  • Fire Impact Fee (South Walton Fire District, Commercial)
    South Walton Fire District
    South Walton Fire District impact fee: $0.75/sq ft (0.78 by card) on floor area under roof exceeding 2,000 sq ft; minimum $1,500 (check) / $1,560 (card) for buildings 2,000 sq ft or less. A single rate applies to all nonresidential categories. SWFD serves the South Walton area only; northern unincorporated Walton is served by the Argyle and Liberty fire districts, whose impact fees are not published.
    $0.75/sq ftRequires confirmation
Total (unincorporated Walton County): $3.34/sq ft + $7,869.77 one-time (≈ $174,869.77 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Walton County: Industrial Impact Fees

Industrial development in unincorporated Walton County pays $1.22 per square foot in impact fees, plus $7,869.77 in one-time water and sewer connection fees (rates sourced July 28, 2026).

For a 50,000 sq ft building, that comes to about $68,619.77. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (South Walton Utility Co.) ($4,955.83 one-time) and Water Connection Fee (South Walton Utility Co.) ($2,913.94 one-time).

Mobility Fee — Transportation (Walton County, Industrial) and Fire Impact Fee (South Walton Fire District, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.

View the full Walton County impact fee schedule
Water$2,913.94 one-time
  • Water Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Company water connection fee, effective October 1, 2025. The nonresidential fee is based on a land-use ERU factor; the amount shown is the 1.0-ERU minimum. A meter charge by size applies in addition. SWU serves the unincorporated South Walton (30A/coastal) area; much of northern Walton is on septic or served by other utilities.
    $2,913.94 one-time
Sewer$4,955.83 one-time
  • Sewer Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Company sewer connection fee, effective October 1, 2025. The nonresidential fee is based on a land-use ERU factor; the amount shown is the 1.0-ERU minimum (including inspection). A lateral connection charge applies in addition. SWU serves the unincorporated South Walton area.
    $4,955.83 one-time
County$1.22/sq ft
  • Fire Impact Fee (South Walton Fire District, Industrial)
    South Walton Fire District
    South Walton Fire District impact fee: $0.75/sq ft (0.78 by card) on floor area under roof exceeding 2,000 sq ft; minimum $1,500 (check) / $1,560 (card) for buildings 2,000 sq ft or less. A single rate applies to all nonresidential categories. SWFD serves the South Walton area only; northern unincorporated Walton is served by the Argyle and Liberty fire districts, whose impact fees are not published.
    $0.75/sq ftRequires confirmation
  • Mobility Fee — Transportation (Walton County, Industrial)
    South Walton
    Walton County
    Walton County Mobility Fee (Ord. 2023-29) applies in unincorporated Walton County only (municipalities excluded unless they opt in). The rate shown is the South Walton assessment area — highest of 4 rate districts. A 3–5% administrative surcharge applies in addition.
    $0.47/sq ftRequires confirmation
Total (unincorporated Walton County): $1.22/sq ft + $7,869.77 one-time (≈ $68,619.77 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Walton County: Office Impact Fees

Office development in unincorporated Walton County pays $1.63 per square foot in impact fees, plus $7,869.77 in one-time water and sewer connection fees (rates sourced July 28, 2026).

For a 25,000 sq ft building, that comes to about $48,669.77. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (South Walton Utility Co.) ($4,955.83 one-time) and Water Connection Fee (South Walton Utility Co.) ($2,913.94 one-time).

Fire Impact Fee (South Walton Fire District, Office) and Mobility Fee — Transportation (Walton County, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.

View the full Walton County impact fee schedule
Water$2,913.94 one-time
  • Water Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Company water connection fee, effective October 1, 2025. The nonresidential fee is based on a land-use ERU factor; the amount shown is the 1.0-ERU minimum. A meter charge by size applies in addition. SWU serves the unincorporated South Walton (30A/coastal) area; much of northern Walton is on septic or served by other utilities.
    $2,913.94 one-time
Sewer$4,955.83 one-time
  • Sewer Connection Fee (South Walton Utility Co.)
    South Walton Utility Company, Inc.
    South Walton Utility Company sewer connection fee, effective October 1, 2025. The nonresidential fee is based on a land-use ERU factor; the amount shown is the 1.0-ERU minimum (including inspection). A lateral connection charge applies in addition. SWU serves the unincorporated South Walton area.
    $4,955.83 one-time
County$1.63/sq ft
  • Mobility Fee — Transportation (Walton County, Office)
    South Walton
    Walton County
    Walton County Mobility Fee (Ord. 2023-29) applies in unincorporated Walton County only (municipalities excluded unless they opt in). The rate shown is the South Walton assessment area — highest of 4 rate districts. A 3–5% administrative surcharge applies in addition.
    $0.88/sq ftRequires confirmation
  • Fire Impact Fee (South Walton Fire District, Office)
    South Walton Fire District
    South Walton Fire District impact fee: $0.75/sq ft (0.78 by card) on floor area under roof exceeding 2,000 sq ft; minimum $1,500 (check) / $1,560 (card) for buildings 2,000 sq ft or less. A single rate applies to all nonresidential categories. SWFD serves the South Walton area only; northern unincorporated Walton is served by the Argyle and Liberty fire districts, whose impact fees are not published.
    $0.75/sq ftRequires confirmation
Total (unincorporated Walton County): $1.63/sq ft + $7,869.77 one-time (≈ $48,669.77 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Walton County impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Walton County impact fee FAQs

What are single-family impact fees in Walton County, Florida?

A new single-family home in unincorporated Walton County pays at least $8,369.77 per unit in impact fees (rates sourced July 28, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Walton County?

Multifamily development in unincorporated Walton County pays at least $9,369.77 per unit in impact fees (rates sourced July 28, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Walton County?

Commercial development in unincorporated Walton County pays $3.34 per square foot in impact fees, plus $7,869.77 in one-time water and sewer connection fees, about $174,869.77 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Do cities in Walton County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 3 of 3 cities in Walton County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000