Paxton applies its own fee schedule: municipal fees plus the Walton County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $400.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Paxton impact fees by project type

Paxton: Single-Family Impact Fees

A new single-family home in Paxton pays at least $400.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Utility Impact Fee (Town of Paxton) — combined water/sewer, not split ($400.00).

Mobility Fee — Transportation (Walton County within Paxton) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Paxton impact fee schedule
Water$400.00
Sewer$0.00
  • Sewer Connection/Impact Fee (Town of Paxton)
    Town of Paxton
    The Town of Paxton's $400 utility impact fee is a single combined charge shown on the town's utility impact fee row; it is not separately assessed for sewer, so no additional sewer impact fee applies to a new connection.
    $0.00
City$0.00
County$0.00
  • School Impact Fee (Walton County within Paxton — None Found)
    Walton County School District
    Walton County levies no school impact fee. The county's only development impact fee is the transportation Mobility Fee.
    $0.00
  • Mobility Fee — Transportation (Walton County within Paxton)
    Walton County
    The Walton County Mobility Fee is not currently collected anywhere (voided by Florida SB 180, 2025). It also applies inside a municipality only if the town opts in; Paxton's opt-in status is not confirmed. If both reinstated and opted in, the rate would be the North Walton area rate ($356 per 1,000 sq ft).
    Requires confirmation
Total (Paxton): $400.00
Sources last checked Official fee schedules:Town of Paxton Walton County School District Walton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paxton: Multifamily Impact Fees

A new multifamily unit in Paxton pays at least $400.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Utility Impact Fee (Town of Paxton, MF) — combined water/sewer, not split ($400.00).

Mobility Fee — Transportation (Walton County within Paxton, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Paxton impact fee schedule
Water$400.00
Sewer$0.00
  • Sewer Connection/Impact Fee (Town of Paxton, MF)
    Town of Paxton
    The Town of Paxton's $400 utility impact fee is a single combined charge shown on the town's utility impact fee row; it is not separately assessed for sewer, so no additional sewer impact fee applies per unit.
    $0.00
City$0.00
County$0.00
Total (Paxton): $400.00
Sources last checked Official fee schedules:Town of Paxton Walton County School District Walton County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paxton: Commercial Impact Fees

Commercial development in Paxton pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.

Water Connection/Impact Fee (Town of Paxton) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection/Impact Fee (Town of Paxton) is set by the utility and not published online. Mobility Fee — Transportation (Walton County within Paxton, Commercial) is set by the county and has no published standard rate. City Impact Fees (Town of Paxton — None Found, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Paxton impact fee schedule
Water$600.00 one-time
Sewer$0.00
City$0.00
County$0.00
Total (Paxton): $600.00 one-time (≈ $600.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Paxton Walton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paxton: Industrial Impact Fees

Industrial development in Paxton pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.

Water Connection/Impact Fee (Town of Paxton) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection/Impact Fee (Town of Paxton) is set by the utility and not published online. Mobility Fee — Transportation (Walton County within Paxton, Industrial) is set by the county and has no published standard rate. City Impact Fees (Town of Paxton — None Found, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Paxton impact fee schedule
Water$600.00 one-time
Sewer$0.00
City$0.00
County$0.00
Total (Paxton): $600.00 one-time (≈ $600.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Paxton Walton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paxton: Office Impact Fees

Office development in Paxton pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to at least $600.00. The calculator below adjusts to your exact square footage.

Water Connection/Impact Fee (Town of Paxton) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection/Impact Fee (Town of Paxton) is set by the utility and not published online. Mobility Fee — Transportation (Walton County within Paxton, Office) is set by the county and has no published standard rate. City Impact Fees (Town of Paxton — None Found, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Paxton impact fee schedule
Water$600.00 one-time
Sewer$0.00
City$0.00
County$0.00
Total (Paxton): $600.00 one-time (≈ $600.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Paxton Walton County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Walton County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paxton impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Paxton impact fee FAQs

What are the total impact fees for a single-family home in Paxton, Florida?

A new single-family home in Paxton pays at least $400.00 per unit in combined impact fees (rates sourced July 18, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Paxton?

Commercial development in Paxton pays no per-square-foot impact fees, but owes $600.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Paxton charge its own impact fees?

Yes. Paxton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Paxton, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Walton County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000