Folly Beach, South Carolina Impact Fees

Folly Beach applies its own fee schedule. Charleston County does not currently add county-level impact fees inside city limits. A new single-family home pays $9,228.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Folly Beach Impact Fees by Project Type

Folly Beach: Single-Family Impact Fees

A new single-family home in Folly Beach pays $9,228.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Folly Beach) — 1.0 ERU × $1,250/ERU ($1,250.00), Water Impact Fee (City of Folly Beach) — 1.0 ERU × $750/ERU ($750.00) and Sewer Connection Fee (City of Folly Beach) ($625.00).

Sewer Treatment Plant Component Impact Fee (Charleston Water System, collected by JIPSD on Folly Beach connections) — 1.0 ERU × $2,348/ERU and Sewer Transportation Impact Fee (James Island PSD, on Folly Beach connections) — 1.0 ERU × $3,630/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Folly Beach Impact Fee Schedule
Water$1,375.00
  • Water Impact Fee (City of Folly Beach) — 1.0 ERU × $750/ERU
    City of Folly Beach
    The City of Folly Beach owns the water distribution system and buys water wholesale from Charleston Water System. The water impact fee is charged per equivalent residential unit (ERU), and a single-family home is 1.0 ERU. Any Charleston Water System or James Island PSD fees are owed in addition.
    $750.00
  • Water Tap Fee (City of Folly Beach) — 3/4" meter
    City of Folly Beach
    Charged per tap by the City of Folly Beach: $625 for a 3/4 inch meter and $750 for a 1 inch meter; larger taps are billed at actual cost plus 10%. Each lot requires its own tap.
    $625.00
Sewer$7,853.00
City$0.00
  • City Impact Fee (City of Folly Beach)
    City of Folly Beach
    The City of Folly Beach levies no development impact fee; its water and sewer impact fees are utility capacity charges, listed separately.
    $0.00
County$0.00
Total (Folly Beach): $9,228.00
Sources last checked Official fee schedules:City of Folly Beach James Island Public Service District Charleston Water System Charleston County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Folly Beach: Multifamily Impact Fees

A new multifamily unit in Folly Beach pays at least $7,733.50 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Folly Beach, MF) — 1.0 ERU/unit × $1,250/ERU ($1,250.00), Water Impact Fee (City of Folly Beach, MF) — 1.0 ERU/unit × $750/ERU ($750.00) and Sewer Connection Fee (City of Folly Beach, MF) ($625.00).

Sewer Transportation Impact Fee (James Island PSD, on Folly Beach connections, MF) — 0.75 ERU × $3,630/ERU and Sewer Treatment Plant Component Impact Fee (Charleston Water System, collected by JIPSD on Folly Beach connections, MF) — 0.75 ERU × $2,348/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Change-in-Use Fee (Charleston Water System, MF, on Folly Beach connections) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Folly Beach Impact Fee Schedule
Water$1,375.00
  • Water Impact Fee (City of Folly Beach, MF) — 1.0 ERU/unit × $750/ERU
    City of Folly Beach
    The City of Folly Beach charges its water impact fee per ERU, and each apartment, condominium or townhouse unit counts as 1.0 ERU, so a multifamily unit pays the single-family rate. Any Charleston Water System or James Island PSD fees are owed in addition.
    $750.00
  • Water Tap Fee (City of Folly Beach, MF) — 3/4" meter
    City of Folly Beach
    The City of Folly Beach charges its water tap fee per water connection, not per unit, so a building on one connection pays it once: $625 for a 3/4 inch meter and $750 for a 1 inch meter, with larger taps billed at actual cost plus 10%.
    $625.00
Sewer$6,358.50
City$0.00
County$0.00
Total (Folly Beach): $7,733.50
Sources last checked Official fee schedules:City of Folly Beach James Island Public Service District Charleston Water System Charleston County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Charleston County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Folly Beach: Commercial Impact Fees

Commercial development in Folly Beach pays no per-square-foot impact fees, but owes $16,548.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $16,548.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Folly Beach) — 4" connection ($625.00 one-time) and Sewer Connection Flow Charge (City of Folly Beach) — per equivalent unit of flow ($625.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (City of Folly Beach) — 1" meter, Sewer Treatment Plant Component Impact Fee (Charleston Water System, collected by JIPSD on Folly Beach connections) — per ERU, Water Impact Fee (City of Folly Beach) — 1" meter, 2.5 ERU × $750/ERU, Sewer Impact Fee (City of Folly Beach) — 1.0 ERU basis, and Sewer Transportation Impact Fee (James Island PSD, on Folly Beach connections) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Folly Beach Impact Fee Schedule
Water$2,625.00 one-time
Sewer$13,923.00 one-time
City$0.00
County$0.00
Total (Folly Beach): $16,548.00 one-time (≈ $16,548.00 at 50,000 sq ft)
Sources last checked Official fee schedules:James Island Public Service District City of Folly Beach
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Charleston County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Folly Beach: Industrial Impact Fees

Industrial development in Folly Beach pays no per-square-foot impact fees, but owes $16,548.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $16,548.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Folly Beach) — 4" connection ($625.00 one-time) and Sewer Connection Flow Charge (City of Folly Beach) — per equivalent unit of flow ($625.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (City of Folly Beach) — 1" meter, Sewer Treatment Plant Component Impact Fee (Charleston Water System, collected by JIPSD on Folly Beach connections) — per ERU, Water Impact Fee (City of Folly Beach) — 1" meter, 2.5 ERU × $750/ERU, Sewer Impact Fee (City of Folly Beach) — 1.0 ERU basis, and Sewer Transportation Impact Fee (James Island PSD, on Folly Beach connections) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Folly Beach Impact Fee Schedule
Water$2,625.00 one-time
Sewer$13,923.00 one-time
City$0.00
County$0.00
Total (Folly Beach): $16,548.00 one-time (≈ $16,548.00 at 50,000 sq ft)
Sources last checked Official fee schedules:James Island Public Service District City of Folly Beach
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Charleston County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Folly Beach: Office Impact Fees

Office development in Folly Beach pays no per-square-foot impact fees, but owes $16,548.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $16,548.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Folly Beach) — 4" connection ($625.00 one-time) and Sewer Connection Flow Charge (City of Folly Beach) — per equivalent unit of flow ($625.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap Fee (City of Folly Beach) — 1" meter, Sewer Treatment Plant Component Impact Fee (Charleston Water System, collected by JIPSD on Folly Beach connections) — per ERU, Water Impact Fee (City of Folly Beach) — 1" meter, 2.5 ERU × $750/ERU, Sewer Impact Fee (City of Folly Beach) — 1.0 ERU basis, and Sewer Transportation Impact Fee (James Island PSD, on Folly Beach connections) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Folly Beach Impact Fee Schedule
Water$2,625.00 one-time
Sewer$13,923.00 one-time
City$0.00
County$0.00
Total (Folly Beach): $16,548.00 one-time (≈ $16,548.00 at 25,000 sq ft)
Sources last checked Official fee schedules:James Island Public Service District City of Folly Beach
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Charleston County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Folly Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Folly Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Folly Beach, South Carolina?

A new single-family home in Folly Beach pays $9,228.00 per unit in combined impact fees (rates sourced November 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Folly Beach?

Commercial development in Folly Beach pays no per-square-foot impact fees, but owes $16,548.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Folly Beach charge its own impact fees?

Yes. Folly Beach levies its own municipal impact or utility fees. Charleston County does not currently add county-level impact fees inside Folly Beach. The schedule on this page shows every fee that applies to development in Folly Beach.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Charleston County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000