Sullivan's Island Impact Fees by Project Type
Sullivan's Island: Single-Family Impact Fees
A new single-family home in Sullivan's Island pays $5,900.00 per unit in impact fees (rates sourced October 29, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Tap Construction Fee (Town of Sullivan's Island) — 6" tap, no service line ($3,800.00), Water Meter Connection Fee (Town of Sullivan's Island) — 5/8"-3/4" meter ($1,400.00) and Wastewater Tap Fee (Town of Sullivan's Island) — existing lot ($700.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Sullivan's Island Impact Fee Schedule
- Water Meter Connection Fee (Town of Sullivan's Island) — 5/8"-3/4" meter$1,400.00Town of Sullivan's IslandTown of Sullivan's Island water meter connection fee of $1,400 for a 5/8 inch-3/4 inch meter, where no service line exists, plus street cut and restoration costs (FY2027).
- Wastewater Tap Construction Fee (Town of Sullivan's Island) — 6" tap, no service line$3,800.00Town of Sullivan's IslandCharged in addition to the wastewater tap fee: $3,800 for a 6 inch connection where no service line to the property exists, plus street cut and restoration; $700 where a service line already exists. An 8 inch connection is billed at actual cost.
- Wastewater Tap Fee (Town of Sullivan's Island) — existing lot$700.00Town of Sullivan's Island Water & Sewer DepartmentThe Town of Sullivan's Island provides sewer. The $700 wastewater tap fee (6 inch) applies to an existing lot; a newly created lot pays a buy-in cost set case by case instead. A separate tap construction fee also applies ($3,800 if no service line exists, $700 if one does).
- City Impact Fee (Town of Sullivan's Island)$0.00Town of Sullivan's IslandThe Town of Sullivan's Island levies no development impact fee; its one-time development charges are the water and sewer connection fees set by annual resolution.
- County Impact Fee (Charleston County)$0.00Charleston CountyCharleston County levies no development impact fee, and no school impact fee applies.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sullivan's Island: Multifamily Impact Fees
A new multifamily unit in Sullivan's Island pays $5,900.00 per unit in impact fees (rates sourced October 29, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Tap Construction Fee (Town of Sullivan's Island, MF) — 6" tap, no service line ($3,800.00), Water Meter Connection Fee (Town of Sullivan's Island, MF) — 5/8"-3/4" meter ($1,400.00) and Wastewater Tap Fee (Town of Sullivan's Island, MF) ($700.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Sullivan's Island Impact Fee Schedule
- Water Meter Connection Fee (Town of Sullivan's Island, MF) — 5/8"-3/4" meter$1,400.00Town of Sullivan's IslandTown of Sullivan's Island water meter connection fee of $1,400 for a 5/8 inch-3/4 inch meter, where no service line exists, plus street cut and restoration costs (FY2027).
- Wastewater Tap Construction Fee (Town of Sullivan's Island, MF) — 6" tap, no service line$3,800.00Town of Sullivan's IslandCharged once per sewer connection, in addition to the wastewater tap fee: $3,800 for a 6 inch connection where no service line exists ($700 where one does), plus street cut and restoration; 8 inch connections are billed at actual cost.
- Wastewater Tap Fee (Town of Sullivan's Island, MF)$700.00Town of Sullivan's Island Water & Sewer DepartmentCharged per sewer tap, not per unit: a multifamily building on one 6 inch tap pays $700 once on an existing lot; a newly created lot pays a case-by-case buy-in cost, and 8 inch taps are priced individually. Tap construction ($3,800 with no existing service line) is a separate charge.
- City Impact Fee (Town of Sullivan's Island, MF)$0.00Town of Sullivan's IslandThe Town of Sullivan's Island levies no development impact fee; its one-time development charges are the water and sewer connection fees set by annual resolution.
- County Impact Fee (Charleston County, MF)$0.00Charleston CountyCharleston County levies no development impact fee, and no school impact fee applies.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sullivan's Island: Commercial Impact Fees
Commercial development in Sullivan's Island pays no per-square-foot impact fees, but owes $6,400.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to about $6,400.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Tap Construction Fee (Town of Sullivan's Island) — no existing service line ($3,800.00 one-time), Water Meter Connection Fee (Town of Sullivan's Island) — 1" meter ($1,900.00 one-time) and Wastewater Tap Fee (Town of Sullivan's Island) — 6" existing lot ($700.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Sullivan's Island Impact Fee Schedule
- Water Meter Connection Fee (Town of Sullivan's Island) — 1" meter$1,900.00 one-timeCost-based water meter connection fee set by meter size; no separate water impact or capacity fee. Street cut and restoration ($1,200), mill and fill, curb cut or bore charges may also apply. Current schedule effective 7/1/2026. Town purchases water wholesale from Charleston Water System.
- Wastewater Tap Construction Fee (Town of Sullivan's Island) — no existing service line$3,800.00 one-timeWhere no sewer service line exists, a one-time $3,800 tap construction fee applies in addition to the $700 wastewater tap fee (street cut and restoration extra). Current schedule effective 7/1/2026.
- Wastewater Tap Fee (Town of Sullivan's Island) — 6" existing lot$700.00 one-timeNo separate sewer impact or capacity fee. One-time wastewater tap fee (6 inch, existing lot) of $700. Newly created lots pay a buy-in cost set case by case. Current schedule effective 7/1/2026.
- City Impact Fee (Town of Sullivan's Island, Commercial)$0.00The Town of Sullivan's Island does not levy a municipal development impact fee.
- County Impact Fee (Charleston County, Commercial)$0.00Charleston County does not levy a development impact fee.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sullivan's Island: Industrial Impact Fees
Industrial development in Sullivan's Island pays no per-square-foot impact fees, but owes $6,400.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to about $6,400.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Tap Construction Fee (Town of Sullivan's Island) — no existing service line ($3,800.00 one-time), Water Meter Connection Fee (Town of Sullivan's Island) — 1" meter ($1,900.00 one-time) and Wastewater Tap Fee (Town of Sullivan's Island) — 6" existing lot ($700.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Sullivan's Island Impact Fee Schedule
- Water Meter Connection Fee (Town of Sullivan's Island) — 1" meter$1,900.00 one-timeCost-based water meter connection fee set by meter size; no separate water impact or capacity fee. Street cut and restoration ($1,200), mill and fill, curb cut or bore charges may also apply. Current schedule effective 7/1/2026. Town purchases water wholesale from Charleston Water System.
- Wastewater Tap Construction Fee (Town of Sullivan's Island) — no existing service line$3,800.00 one-timeWhere no sewer service line exists, a one-time $3,800 tap construction fee applies in addition to the $700 wastewater tap fee (street cut and restoration extra). Current schedule effective 7/1/2026.
- Wastewater Tap Fee (Town of Sullivan's Island) — 6" existing lot$700.00 one-timeNo separate sewer impact or capacity fee. One-time wastewater tap fee (6 inch, existing lot) of $700. Newly created lots pay a buy-in cost set case by case. Current schedule effective 7/1/2026.
- City Impact Fee (Town of Sullivan's Island, Industrial)$0.00The Town of Sullivan's Island does not levy a municipal development impact fee.
- County Impact Fee (Charleston County, Industrial)$0.00Charleston County does not levy a development impact fee.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sullivan's Island: Office Impact Fees
Office development in Sullivan's Island pays no per-square-foot impact fees, but owes $6,400.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 25,000 sq ft building, that comes to about $6,400.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Tap Construction Fee (Town of Sullivan's Island) — no existing service line ($3,800.00 one-time), Water Meter Connection Fee (Town of Sullivan's Island) — 1" meter ($1,900.00 one-time) and Wastewater Tap Fee (Town of Sullivan's Island) — 6" existing lot ($700.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Sullivan's Island Impact Fee Schedule
- Water Meter Connection Fee (Town of Sullivan's Island) — 1" meter$1,900.00 one-timeCost-based water meter connection fee set by meter size; no separate water impact or capacity fee. Street cut and restoration ($1,200), mill and fill, curb cut or bore charges may also apply. Current schedule effective 7/1/2026. Town purchases water wholesale from Charleston Water System.
- Wastewater Tap Construction Fee (Town of Sullivan's Island) — no existing service line$3,800.00 one-timeWhere no sewer service line exists, a one-time $3,800 tap construction fee applies in addition to the $700 wastewater tap fee (street cut and restoration extra). Current schedule effective 7/1/2026.
- Wastewater Tap Fee (Town of Sullivan's Island) — 6" existing lot$700.00 one-timeNo separate sewer impact or capacity fee. One-time wastewater tap fee (6 inch, existing lot) of $700. Newly created lots pay a buy-in cost set case by case. Current schedule effective 7/1/2026.
- City Impact Fee (Town of Sullivan's Island, Office)$0.00The Town of Sullivan's Island does not levy a municipal development impact fee.
- County Impact Fee (Charleston County, Office)$0.00Charleston County does not levy a development impact fee.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sullivan's Island Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Sullivan's Island Impact Fee FAQs
What are the total impact fees for a single-family home in Sullivan's Island, South Carolina?
A new single-family home in Sullivan's Island pays $5,900.00 per unit in combined impact fees (rates sourced October 29, 2026).
How much are commercial impact fees in Sullivan's Island?
Commercial development in Sullivan's Island pays no per-square-foot impact fees, but owes $6,400.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Sullivan's Island charge its own impact fees?
Yes. Sullivan's Island levies its own municipal impact or utility fees. Charleston County does not currently add county-level impact fees inside Sullivan's Island. The schedule on this page shows every fee that applies to development in Sullivan's Island.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Charleston County impact fees page.