Hollywood Impact Fees by Project Type
Hollywood: Single-Family Impact Fees
A new single-family home in Hollywood pays $15,740.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Charleston Water System) — 3/4" meter ($4,620.00) and Water Tap Fee (Charleston Water System) — 3/4" full tap ($1,200.00).
Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1.0 ERU × $6,670/ERU and Sewer Connection Fee (Town of Hollywood) — 1.0 ERU × $3,250/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hollywood Impact Fee Schedule
- Water Impact Fee (Charleston Water System) — 3/4" meter$4,620.00Charleston Water SystemCharleston Water System is Hollywood's water provider. Water impact fee for a 3/4 inch meter: $4,620, rising to $5,115 on January 1, 2027.
- Water Tap Fee (Charleston Water System) — 3/4" full tap$1,200.00Charleston Water SystemCharleston Water System tap fee of $1,200 for a full 3/4 inch tap, where it makes the whole service connection; on a lot whose service line the developer built, only the $500 meter set applies (option shown).
- Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1.0 ERU × $6,670/ERU$6,670.00Requires confirmationCharleston Water System (collected via Town of Hollywood)The Town of Hollywood runs its own sewer collection system and Charleston Water System treats the flow. The town code requires connecting residences to pay the CWS sewer impact fee, $6,670 per ERU from January 1, 2026 ($8,160 from January 1, 2027).
- Sewer Connection Fee (Town of Hollywood) — 1.0 ERU × $3,250/ERU$3,250.00Requires confirmationTown of HollywoodTown of Hollywood sewer connection fee of $3,250 per equivalent residential unit since September 1, 2023, paid with the Charleston Water System sewer impact fee.
- City Impact Fee (Town of Hollywood)$0.00Town of Hollywood
- County Impact Fee (Charleston County)$0.00Charleston CountyCharleston County levies no development impact fee. County Council discussed adopting one in March 2025; no impact fee ordinance has followed.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hollywood: Multifamily Impact Fees
A new multifamily unit in Hollywood pays at least $14,072.50 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Charleston Water System, MF) — 3/4" meter ($4,620.00) and Water Tap Fee (Charleston Water System, MF) — 3/4" full tap ($1,200.00).
Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood, MF) — 0.75 ERU × $6,670/ERU and Sewer Connection Fee (Town of Hollywood, MF) — 1.0 ERU × $3,250/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Change-in-Use Fee (Charleston Water System, MF, on Hollywood connections) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hollywood Impact Fee Schedule
- Water Impact Fee (Charleston Water System, MF) — 3/4" meter$4,620.00Charleston Water SystemCharleston Water System is Hollywood's water provider. Water impact fee for a 3/4 inch meter: $4,620, rising to $5,115 on January 1, 2027. A building on one connection pays once.
- Water Tap Fee (Charleston Water System, MF) — 3/4" full tap$1,200.00Charleston Water SystemCharleston Water System tap fee of $1,200 for a full 3/4 inch tap, where it makes the whole service connection; on a lot whose service line the developer built, only the $500 meter set applies (option shown). A building on one connection pays once.
- Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood, MF) — 0.75 ERU × $6,670/ERU$5,002.50Requires confirmationCharleston Water System (collected via Town of Hollywood)The Town of Hollywood runs its own sewer collection system and Charleston Water System treats the flow; the town code requires the CWS sewer impact fee, $6,670 per ERU from January 1, 2026 ($8,160 from January 1, 2027). A two-bedroom apartment counts as 0.75 ERU under state flow guidelines.
- Sewer Connection Fee (Town of Hollywood, MF) — 1.0 ERU × $3,250/ERU$3,250.00Requires confirmationTown of HollywoodTown of Hollywood sewer connection fee of $3,250 per equivalent residential unit; the town code counts each dwelling as one unit.
- Sewer Change-in-Use Fee (Charleston Water System, MF, on Hollywood connections)Requires confirmationCharleston Water SystemCharleston Water System charges a one-time sewer change-in-use fee ($6,170 from 1/1/2026, $7,660 from 1/1/2027) to new sewer customers whose wastewater exceeds one equivalent residential unit, which a new apartment building does. CWS describes the fee as a business charge, so it may not apply to apartments; where it does, it is charged once per building, not per unit, and is not included in this estimate.
- City Impact Fee (Town of Hollywood, MF)$0.00Town of Hollywood
- County Impact Fee (Charleston County, MF)$0.00Charleston CountyCharleston County levies no development impact fee. County Council discussed adopting one in March 2025; no impact fee ordinance has followed.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hollywood: Commercial Impact Fees
Commercial development in Hollywood pays no per-square-foot impact fees, but owes $15,240.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $15,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Charleston Water System) — 1" tap ($7,370.00 one-time) and Water Tap Fee (Charleston Water System) — 1" meter ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1 ERU/UCL is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Hollywood) is set by the utility and not published online. City Impact Fee (Town of Hollywood, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Hollywood Impact Fee Schedule
- Water Impact Fee (Charleston Water System) — 1" tap$7,370.00 one-timeCharleston Water System water impact fee for a 1-inch tap: $7,370, effective 1/1/2026; increases to $8,190 on 1/1/2027. Impact fees are based on tap size.
- Water Tap Fee (Charleston Water System) — 1" meter$1,200.00 one-timeCharleston Water System water tap fee for a 1-inch meter: $1,200. Based on meter size; not phased.
- Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1 ERU/UCL$6,670.00 one-timeRequires confirmationCharleston Water System wastewater impact fee, passed through by the Town of Hollywood (which operates the collection system and CWS treats the flow): $6,670 per equivalent residential unit, effective 1/1/2026 (increases to $8,160 on 1/1/2027). Nonresidential is charged by contributory loading; single-unit basis shown.
- Sewer Connection Fee (Town of Hollywood)Requires confirmationThe Town of Hollywood charges its own sewer connection fee in addition to the Charleston Water System treatment impact fee; for nonresidential sites the amount is calculated from building square footage and use.
- City Impact Fee (Town of Hollywood, Commercial)Requires confirmationThe Town of Hollywood does not levy a municipal development impact fee (its sewer impact fee is a utility charge shown separately).
- County Development Impact Fee (Charleston County, Commercial)$0.00Charleston County does not levy a development impact fee.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hollywood: Industrial Impact Fees
Industrial development in Hollywood pays no per-square-foot impact fees, but owes $15,240.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $15,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Charleston Water System) — 1" tap ($7,370.00 one-time) and Water Tap Fee (Charleston Water System) — 1" meter ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1 ERU/UCL is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Hollywood) is set by the utility and not published online. City Impact Fee (Town of Hollywood, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Hollywood Impact Fee Schedule
- Water Impact Fee (Charleston Water System) — 1" tap$7,370.00 one-timeCharleston Water System water impact fee for a 1-inch tap: $7,370, effective 1/1/2026; increases to $8,190 on 1/1/2027. Impact fees are based on tap size.
- Water Tap Fee (Charleston Water System) — 1" meter$1,200.00 one-timeCharleston Water System water tap fee for a 1-inch meter: $1,200. Based on meter size; not phased.
- Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1 ERU/UCL$6,670.00 one-timeRequires confirmationCharleston Water System wastewater impact fee, passed through by the Town of Hollywood (which operates the collection system and CWS treats the flow): $6,670 per equivalent residential unit, effective 1/1/2026 (increases to $8,160 on 1/1/2027). Nonresidential is charged by contributory loading; single-unit basis shown.
- Sewer Connection Fee (Town of Hollywood)Requires confirmationThe Town of Hollywood charges its own sewer connection fee in addition to the Charleston Water System treatment impact fee; for nonresidential sites the amount is calculated from building square footage and use.
- City Impact Fee (Town of Hollywood, Industrial)Requires confirmationThe Town of Hollywood does not levy a municipal development impact fee (its sewer impact fee is a utility charge shown separately).
- County Development Impact Fee (Charleston County, Industrial)$0.00Charleston County does not levy a development impact fee.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hollywood: Office Impact Fees
Office development in Hollywood pays no per-square-foot impact fees, but owes $15,240.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to at least $15,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Charleston Water System) — 1" tap ($7,370.00 one-time) and Water Tap Fee (Charleston Water System) — 1" meter ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1 ERU/UCL is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Hollywood) is set by the utility and not published online. City Impact Fee (Town of Hollywood, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Hollywood Impact Fee Schedule
- Water Impact Fee (Charleston Water System) — 1" tap$7,370.00 one-timeCharleston Water System water impact fee for a 1-inch tap: $7,370, effective 1/1/2026; increases to $8,190 on 1/1/2027. Impact fees are based on tap size.
- Water Tap Fee (Charleston Water System) — 1" meter$1,200.00 one-timeCharleston Water System water tap fee for a 1-inch meter: $1,200. Based on meter size; not phased.
- Sewer Impact Fee (Charleston Water System, passed through by Town of Hollywood) — 1 ERU/UCL$6,670.00 one-timeRequires confirmationCharleston Water System wastewater impact fee, passed through by the Town of Hollywood (which operates the collection system and CWS treats the flow): $6,670 per equivalent residential unit, effective 1/1/2026 (increases to $8,160 on 1/1/2027). Nonresidential is charged by contributory loading; single-unit basis shown.
- Sewer Connection Fee (Town of Hollywood)Requires confirmationThe Town of Hollywood charges its own sewer connection fee in addition to the Charleston Water System treatment impact fee; for nonresidential sites the amount is calculated from building square footage and use.
- City Impact Fee (Town of Hollywood, Office)Requires confirmationThe Town of Hollywood does not levy a municipal development impact fee (its sewer impact fee is a utility charge shown separately).
- County Development Impact Fee (Charleston County, Office)$0.00Charleston County does not levy a development impact fee.
Where in Charleston County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hollywood Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Hollywood Impact Fee FAQs
What are the total impact fees for a single-family home in Hollywood, South Carolina?
A new single-family home in Hollywood pays $15,740.00 per unit in combined impact fees (rates sourced November 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Hollywood?
Commercial development in Hollywood pays no per-square-foot impact fees, but owes $15,240.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Hollywood charge its own impact fees?
Yes. Hollywood levies its own municipal impact or utility fees. Charleston County does not currently add county-level impact fees inside Hollywood. The schedule on this page shows every fee that applies to development in Hollywood.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Charleston County impact fees page.