Fountain Inn Impact Fees by Project Type
Fountain Inn: Single-Family Impact Fees
A new single-family home in Fountain Inn pays $14,667.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Trunk & Treatment New Account Fee (ReWa — City of Fountain Inn) — 5/8-inch or 3/4-inch meter ($5,500.00), Water Capacity Fee (Greenville Water — City of Fountain Inn) — 5/8-inch meter ($2,780.00) and Water Connection (Tap) Fee (Greenville Water — City of Fountain Inn) — 5/8-inch meter, service installed by Greenville Water ($1,500.00).
Development Impact Fee (City of Fountain Inn) — Single Family is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Fountain Inn Impact Fee Schedule
- Water Capacity Fee (Greenville Water — City of Fountain Inn) — 5/8-inch meter$2,780.00Greenville WaterGreenville Water capacity fee by meter size, effective January 1, 2026: $2,780 for a 5/8-inch meter (was $2,100), $9,267 for 1-inch, $14,827 for 1-1/2-inch and $18,533 for 2-inch. Larger meters are priced from the anticipated flow.
- Water Connection (Tap) Fee (Greenville Water — City of Fountain Inn) — 5/8-inch meter, service installed by Greenville Water$1,500.005/8-inch meter, installed by Greenville WaterGreenville WaterGreenville Water meter service installation fee for a 5/8-inch meter, effective January 1, 2026: $1,500, including the $350 meter set. Where Greenville Water installs the service it replaces the $900 connection (tap) fee and the meter set; where a developer installs the service, those are charged instead ($1,250).
- Water Contribution Fee (Greenville Water — City of Fountain Inn) — 3/4-inch tap$1,000.003/4-inch tap / 5/8-inch meterGreenville WaterGreenville Water contribution in aid of construction, charged by tap size on every new water service to fund main extensions (in effect since September 1, 2015): $1,000 for a 3/4-inch or 1-inch tap, $1,500 for 2-inch, up to $4,000 for 12-inch. Charged in addition to the capacity and connection fees.
- Sewer Trunk & Treatment New Account Fee (ReWa — City of Fountain Inn) — 5/8-inch or 3/4-inch meter$5,500.00Renewable Water Resources (ReWa)One-time ReWa wastewater trunk and treatment new account fee, effective October 1, 2026: $5,500 for a home on a 5/8-inch or 3/4-inch water meter (was $4,110), $11,000 on a 1-inch meter, $33,000 on a 1-1/2-inch meter. Scheduled to rise to $6,947 (5/8 or 3/4 inch) on October 1, 2027, subject to ReWa budget approval. Charged in addition to the City of Fountain Inn sewer tap fee.
- Sewer Tap Fee (City of Fountain Inn)$750.00ResidentialCity of Fountain InnCity of Fountain Inn sewer tap fee for a residential connection: $750 under the FY 2026-27 fee schedule. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Fountain Inn) — Single Family$3,137.00Requires confirmationCity of Fountain InnCity of Fountain Inn development impact fee for a single-family home: $3,137 (fire $1,283, parks $1,333, police $521), adopted by Ordinance 2025-01. Parks fees took effect July 1, 2025 and fire and police fees January 1, 2026. The adopted fee study adjusts the fees annually by the ENR Construction Cost Index; no adjusted schedule has been published, so the current amount may be higher.
- County Impact Fee (Greenville County — City of Fountain Inn)$0.00Greenville County
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fountain Inn: Multifamily Impact Fees
A new multifamily unit in Fountain Inn pays $12,138.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Trunk & Treatment New Account Fee (ReWa — City of Fountain Inn, MF) — 2-BR ($4,125.00), Water Capacity Fee (Greenville Water — City of Fountain Inn, MF) — 2-BR under 1,200 sq ft ($2,085.00) and Water Connection (Tap) Fee (Greenville Water — City of Fountain Inn, MF) — 5/8-inch meter, service installed by Greenville Water ($1,500.00).
Development Impact Fee (City of Fountain Inn, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Fountain Inn Impact Fee Schedule
- Water Capacity Fee (Greenville Water — City of Fountain Inn, MF) — 2-BR under 1,200 sq ft$2,085.00Greenville WaterGreenville Water capacity fee per apartment or condominium unit, effective January 1, 2026: $2,085 for a two-bedroom unit under 1,200 sq ft. One-bedroom units are $1,390 under 1,000 sq ft and $2,085 from 1,000 to 1,200 sq ft; larger two-bedroom units and other unit types are $2,780.
- Water Connection (Tap) Fee (Greenville Water — City of Fountain Inn, MF) — 5/8-inch meter, service installed by Greenville Water$1,500.005/8-inch meter, installed by Greenville WaterGreenville WaterGreenville Water charges connection fees per service, not per apartment: a 5/8-inch meter service installed by Greenville Water is $1,500 including the meter set (effective January 1, 2026), or $1,250 where the developer installs the service. A building served by one connection pays once.
- Water Contribution Fee (Greenville Water — City of Fountain Inn, MF) — 3/4-inch tap$1,000.00Greenville WaterGreenville Water contribution in aid of construction, charged per new water service by tap size (in effect since September 1, 2015): $1,000 for a 3/4-inch or 1-inch tap, $1,500 for a 2-inch tap. A building served by one connection pays once.
- Sewer Trunk & Treatment New Account Fee (ReWa — City of Fountain Inn, MF) — 2-BR$4,125.002-BR (225 gpd)Renewable Water Resources (ReWa)One-time ReWa wastewater trunk and treatment new account fee per apartment or condominium unit, effective October 1, 2026: $4,125 for a two-bedroom unit (225 gallons per day), $2,750 for one bedroom, $5,500 for three bedrooms. A further increase is scheduled for October 1, 2027, subject to ReWa budget approval.
- Sewer Tap Fee (City of Fountain Inn, MF)$750.00City of Fountain InnCity of Fountain Inn sewer tap fee: $750 per residential tap under the FY 2026-27 fee schedule ($1,500 commercial). It is charged per tap, not per unit, so a building served by one tap pays once.
- Development Impact Fee (City of Fountain Inn, MF)$2,678.00Requires confirmationMultifamily, per unitCity of Fountain InnCity of Fountain Inn development impact fee per multifamily unit: $2,678 (fire $1,096, parks $1,138, police $444), adopted by Ordinance 2025-01. Parks fees took effect July 1, 2025 and fire and police fees January 1, 2026. The adopted fee study adjusts the fees annually by the ENR Construction Cost Index; no adjusted schedule has been published, so the current amount may be higher.
- County Impact Fee (Greenville County — City of Fountain Inn, MF)$0.00Greenville County
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fountain Inn: Commercial Impact Fees
Commercial development in Fountain Inn pays $2.89 per square foot in impact fees, plus $29,702.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $174,152.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Tap Fee (City of Fountain Inn, Commercial) ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Development Impact Fee (City of Fountain Inn, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Fountain Inn Impact Fee Schedule
- Water Capacity Fee (Greenville Water) — 1" meter$9,267.00 one-timeGreenville WaterGreenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced by Greenville Water on estimated maximum daily flow. Rate shown is 1-inch meter.
- Water Contribution Fee (Greenville Water) — 1" meter$1,000.00 one-timeGreenville WaterGreenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
- Water Connection Fee (Greenville Water) — 1" meter$910.00 one-timeGreenville WaterGreenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
- Water Meter Fee (Greenville Water) — 1" meter$525.00 one-timeGreenville WaterGreenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
- Sewer New Account Fee (ReWa) — 1" meter$16,500.00 one-timeRenewable Water Resources (ReWa)ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
- Sewer Tap Fee (City of Fountain Inn, Commercial)$1,500.00 one-timeCity of Fountain InnCity of Fountain Inn sewer tap fee for a commercial connection: $1,500 under the FY 2026-27 fee schedule. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Fountain Inn, Commercial)$2.89/sq ftRequires confirmationCity of Fountain InnCity of Fountain Inn development impact fee for commercial and retail uses: $2,889 per 1,000 square feet (fire $2,055, police $834), adopted by Ordinance 2025-01 and in effect since January 1, 2026. The parks fee does not apply to nonresidential development. The adopted fee study adjusts the fees annually by the ENR Construction Cost Index; no adjusted schedule has been published, so the current amount may be higher.
- County Development Impact Fee (Greenville County, Commercial)$0.00Greenville CountyGreenville County does not levy nonresidential development impact fees.
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fountain Inn: Industrial Impact Fees
Industrial development in Fountain Inn pays $0.58 per square foot in impact fees, plus $29,702.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $58,502.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Tap Fee (City of Fountain Inn, Commercial) ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Development Impact Fee (City of Fountain Inn, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Fountain Inn Impact Fee Schedule
- Water Capacity Fee (Greenville Water) — 1" meter$9,267.00 one-timeGreenville WaterGreenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced by Greenville Water on estimated maximum daily flow. Rate shown is 1-inch meter.
- Water Contribution Fee (Greenville Water) — 1" meter$1,000.00 one-timeGreenville WaterGreenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
- Water Connection Fee (Greenville Water) — 1" meter$910.00 one-timeGreenville WaterGreenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
- Water Meter Fee (Greenville Water) — 1" meter$525.00 one-timeGreenville WaterGreenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
- Sewer New Account Fee (ReWa) — 1" meter$16,500.00 one-timeRenewable Water Resources (ReWa)ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
- Sewer Tap Fee (City of Fountain Inn, Commercial)$1,500.00 one-timeCity of Fountain InnCity of Fountain Inn sewer tap fee for a commercial connection: $1,500 under the FY 2026-27 fee schedule. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Fountain Inn, Industrial)$0.58/sq ftRequires confirmationCity of Fountain InnCity of Fountain Inn development impact fee for industrial uses: $576 per 1,000 square feet (fire $410, police $166), adopted by Ordinance 2025-01 and in effect since January 1, 2026. The parks fee does not apply to nonresidential development. The adopted fee study adjusts the fees annually by the ENR Construction Cost Index; no adjusted schedule has been published, so the current amount may be higher.
- County Development Impact Fee (Greenville County, Industrial)$0.00Greenville CountyGreenville County does not levy nonresidential development impact fees.
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fountain Inn: Office Impact Fees
Office development in Fountain Inn pays $1.28 per square foot in impact fees, plus $29,702.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to about $61,752.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Tap Fee (City of Fountain Inn, Commercial) ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Development Impact Fee (City of Fountain Inn, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Fountain Inn Impact Fee Schedule
- Water Capacity Fee (Greenville Water) — 1" meter$9,267.00 one-timeGreenville WaterGreenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced by Greenville Water on estimated maximum daily flow. Rate shown is 1-inch meter.
- Water Contribution Fee (Greenville Water) — 1" meter$1,000.00 one-timeGreenville WaterGreenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
- Water Connection Fee (Greenville Water) — 1" meter$910.00 one-timeGreenville WaterGreenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
- Water Meter Fee (Greenville Water) — 1" meter$525.00 one-timeGreenville WaterGreenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
- Sewer New Account Fee (ReWa) — 1" meter$16,500.00 one-timeRenewable Water Resources (ReWa)ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
- Sewer Tap Fee (City of Fountain Inn, Commercial)$1,500.00 one-timeCity of Fountain InnCity of Fountain Inn sewer tap fee for a commercial connection: $1,500 under the FY 2026-27 fee schedule. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Fountain Inn, Office)$1.28/sq ftRequires confirmationCity of Fountain InnCity of Fountain Inn development impact fee for office uses: $1,282 per 1,000 square feet (fire $912, police $370), adopted by Ordinance 2025-01 and in effect since January 1, 2026. The parks fee does not apply to nonresidential development. The adopted fee study adjusts the fees annually by the ENR Construction Cost Index; no adjusted schedule has been published, so the current amount may be higher.
- County Development Impact Fee (Greenville County, Office)$0.00Greenville CountyGreenville County does not levy nonresidential development impact fees.
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fountain Inn Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Fountain Inn Impact Fee FAQs
What are the total impact fees for a single-family home in Fountain Inn, South Carolina?
A new single-family home in Fountain Inn pays $14,667.00 per unit in combined impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Fountain Inn?
Commercial development in Fountain Inn pays $2.89 per square foot in impact fees, plus $29,702.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $174,152.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Fountain Inn charge its own impact fees?
Yes. Fountain Inn levies its own municipal impact or utility fees. Greenville County does not currently add county-level impact fees inside Fountain Inn. The schedule on this page shows every fee that applies to development in Fountain Inn.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.