Mauldin Impact Fees by Project Type
Mauldin: Single-Family Impact Fees
A new single-family home in Mauldin pays $11,290.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Trunk & Treatment New Account Fee (ReWa — City of Mauldin) — 5/8-inch or 3/4-inch meter ($5,500.00), Water Capacity Fee (Greenville Water — City of Mauldin) — 5/8-inch meter ($2,780.00) and Water Connection (Tap) Fee (Greenville Water — City of Mauldin) — 5/8-inch meter, service installed by Greenville Water ($1,500.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Mauldin Impact Fee Schedule
- Water Capacity Fee (Greenville Water — City of Mauldin) — 5/8-inch meter$2,780.00Greenville WaterGreenville Water capacity fee by meter size, effective January 1, 2026: $2,780 for a 5/8-inch meter (was $2,100), $9,267 for 1-inch, $14,827 for 1-1/2-inch and $18,533 for 2-inch. Larger meters are priced from the anticipated flow.
- Water Connection (Tap) Fee (Greenville Water — City of Mauldin) — 5/8-inch meter, service installed by Greenville Water$1,500.005/8-inch meter, installed by Greenville WaterGreenville WaterGreenville Water meter service installation fee for a 5/8-inch meter, effective January 1, 2026: $1,500, including the $350 meter set. Where Greenville Water installs the service it replaces the $900 connection (tap) fee and the meter set; where a developer installs the service, those are charged instead ($1,250).
- Water Contribution Fee (Greenville Water — City of Mauldin) — 3/4-inch tap$1,000.003/4-inch tap / 5/8-inch meterGreenville WaterGreenville Water contribution in aid of construction, charged by tap size on every new water service to fund main extensions (in effect since September 1, 2015): $1,000 for a 3/4-inch or 1-inch tap, $1,500 for 2-inch, up to $4,000 for 12-inch. Charged in addition to the capacity and connection fees.
- Sewer Trunk & Treatment New Account Fee (ReWa — City of Mauldin) — 5/8-inch or 3/4-inch meter$5,500.00Renewable Water Resources (ReWa)One-time ReWa wastewater trunk and treatment new account fee, effective October 1, 2026: $5,500 for a home on a 5/8-inch or 3/4-inch water meter (was $4,110), $11,000 on a 1-inch meter, $33,000 on a 1-1/2-inch meter. Scheduled to rise to $6,947 (5/8 or 3/4 inch) on October 1, 2027, subject to ReWa budget approval. Charged in addition to the City of Mauldin sewer tap fee.
- Sewer Tap Fee (City of Mauldin)$510.00ResidentialCity of MauldinOne-time City of Mauldin sewer tap fee for a residential connection to the City's sewer collection system, set in the adopted FY2027 fee schedule. Flat residential rate. ReWa's trunk and treatment new account fee is charged separately.
- City Impact Fee (City of Mauldin)$0.00City of Mauldin
- County Impact Fee (Greenville County — City of Mauldin)$0.00Greenville County
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mauldin: Multifamily Impact Fees
A new multifamily unit in Mauldin pays $9,220.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Trunk & Treatment New Account Fee (ReWa — City of Mauldin, MF) — 2-BR ($4,125.00), Water Capacity Fee (Greenville Water — City of Mauldin, MF) — 2-BR under 1,200 sq ft ($2,085.00) and Water Connection (Tap) Fee (Greenville Water — City of Mauldin, MF) — 5/8-inch meter, service installed by Greenville Water ($1,500.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Mauldin Impact Fee Schedule
- Water Capacity Fee (Greenville Water — City of Mauldin, MF) — 2-BR under 1,200 sq ft$2,085.00Greenville WaterGreenville Water capacity fee per apartment or condominium unit, effective January 1, 2026: $2,085 for a two-bedroom unit under 1,200 sq ft. One-bedroom units are $1,390 under 1,000 sq ft and $2,085 from 1,000 to 1,200 sq ft; larger two-bedroom units and other unit types are $2,780.
- Water Connection (Tap) Fee (Greenville Water — City of Mauldin, MF) — 5/8-inch meter, service installed by Greenville Water$1,500.005/8-inch meter, installed by Greenville WaterGreenville WaterGreenville Water charges connection fees per service, not per apartment: a 5/8-inch meter service installed by Greenville Water is $1,500 including the meter set (effective January 1, 2026), or $1,250 where the developer installs the service. A building served by one connection pays once.
- Water Contribution Fee (Greenville Water — City of Mauldin, MF) — 3/4-inch tap$1,000.00Greenville WaterGreenville Water contribution in aid of construction, charged per new water service by tap size (in effect since September 1, 2015): $1,000 for a 3/4-inch or 1-inch tap, $1,500 for a 2-inch tap. A building served by one connection pays once.
- Sewer Trunk & Treatment New Account Fee (ReWa — City of Mauldin, MF) — 2-BR$4,125.002-BR (225 gpd)Renewable Water Resources (ReWa)One-time ReWa wastewater trunk and treatment new account fee per apartment or condominium unit, effective October 1, 2026: $4,125 for a two-bedroom unit (225 gallons per day), $2,750 for one bedroom, $5,500 for three bedrooms. A further increase is scheduled for October 1, 2027, subject to ReWa budget approval.
- Sewer Tap Fee (City of Mauldin, MF)$510.00City of MauldinCity of Mauldin sewer tap fee: $510 per residential tap under the FY 2027 fee schedule ($1,010 commercial). It is charged per tap, not per unit, so a building served by one tap pays once.
- City Impact Fee (City of Mauldin, MF)$0.00City of Mauldin
- County Impact Fee (Greenville County — City of Mauldin, MF)$0.00Greenville County
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mauldin: Commercial Impact Fees
Commercial development in Mauldin pays no per-square-foot impact fees, but owes $29,212.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $29,212.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Tap Fee (City of Mauldin, Commercial) ($1,010.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Mauldin Impact Fee Schedule
- Water Capacity Fee (Greenville Water) — 1" meter$9,267.00 one-timeGreenville WaterGreenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced on estimated maximum daily flow. Rate shown is 1-inch meter.
- Water Contribution Fee (Greenville Water) — 1" meter$1,000.00 one-timeGreenville WaterGreenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
- Water Connection Fee (Greenville Water) — 1" meter$910.00 one-timeGreenville WaterGreenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
- Water Meter Fee (Greenville Water) — 1" meter$525.00 one-timeGreenville WaterGreenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
- Sewer New Account Fee (ReWa) — 1" meter$16,500.00 one-timeRenewable Water Resources (ReWa)ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
- Sewer Tap Fee (City of Mauldin, Commercial)$1,010.00 one-timeCity of MauldinCity of Mauldin sewer tap fee for a commercial connection to the city sewer collection system: $1,010 under the FY 2027 fee schedule, at any meter size. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Mauldin, Commercial)$0.00City of MauldinThe City of Mauldin does not charge development impact fees.
- County Development Impact Fee (Greenville County, Commercial)$0.00Greenville CountyGreenville County does not levy nonresidential development impact fees.
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mauldin: Industrial Impact Fees
Industrial development in Mauldin pays no per-square-foot impact fees, but owes $29,212.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $29,212.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Tap Fee (City of Mauldin, Commercial) ($1,010.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Mauldin Impact Fee Schedule
- Water Capacity Fee (Greenville Water) — 1" meter$9,267.00 one-timeGreenville WaterGreenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced on estimated maximum daily flow. Rate shown is 1-inch meter.
- Water Contribution Fee (Greenville Water) — 1" meter$1,000.00 one-timeGreenville WaterGreenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
- Water Connection Fee (Greenville Water) — 1" meter$910.00 one-timeGreenville WaterGreenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
- Water Meter Fee (Greenville Water) — 1" meter$525.00 one-timeGreenville WaterGreenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
- Sewer New Account Fee (ReWa) — 1" meter$16,500.00 one-timeRenewable Water Resources (ReWa)ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
- Sewer Tap Fee (City of Mauldin, Commercial)$1,010.00 one-timeCity of MauldinCity of Mauldin sewer tap fee for a commercial connection to the city sewer collection system: $1,010 under the FY 2027 fee schedule, at any meter size. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Mauldin, Industrial)$0.00City of MauldinThe City of Mauldin does not charge development impact fees.
- County Development Impact Fee (Greenville County, Industrial)$0.00Greenville CountyGreenville County does not levy nonresidential development impact fees.
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mauldin: Office Impact Fees
Office development in Mauldin pays no per-square-foot impact fees, but owes $29,212.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to about $29,212.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Tap Fee (City of Mauldin, Commercial) ($1,010.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Mauldin Impact Fee Schedule
- Water Capacity Fee (Greenville Water) — 1" meter$9,267.00 one-timeGreenville WaterGreenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced on estimated maximum daily flow. Rate shown is 1-inch meter.
- Water Contribution Fee (Greenville Water) — 1" meter$1,000.00 one-timeGreenville WaterGreenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
- Water Connection Fee (Greenville Water) — 1" meter$910.00 one-timeGreenville WaterGreenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
- Water Meter Fee (Greenville Water) — 1" meter$525.00 one-timeGreenville WaterGreenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
- Sewer New Account Fee (ReWa) — 1" meter$16,500.00 one-timeRenewable Water Resources (ReWa)ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
- Sewer Tap Fee (City of Mauldin, Commercial)$1,010.00 one-timeCity of MauldinCity of Mauldin sewer tap fee for a commercial connection to the city sewer collection system: $1,010 under the FY 2027 fee schedule, at any meter size. ReWa's trunk and treatment new account fee is charged in addition.
- Development Impact Fee (City of Mauldin, Office)$0.00City of MauldinThe City of Mauldin does not charge development impact fees.
- County Development Impact Fee (Greenville County, Office)$0.00Greenville CountyGreenville County does not levy nonresidential development impact fees.
Where in Greenville County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Mauldin Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Mauldin Impact Fee FAQs
What are the total impact fees for a single-family home in Mauldin, South Carolina?
A new single-family home in Mauldin pays $11,290.00 per unit in combined impact fees (rates sourced November 11, 2026).
How much are commercial impact fees in Mauldin?
Commercial development in Mauldin pays no per-square-foot impact fees, but owes $29,212.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Mauldin charge its own impact fees?
Yes. Mauldin levies its own municipal impact or utility fees. Greenville County does not currently add county-level impact fees inside Mauldin. The schedule on this page shows every fee that applies to development in Mauldin.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.