Simpsonville, South Carolina Impact Fees

Simpsonville applies its own fee schedule. Greenville County does not currently add county-level impact fees inside city limits. A new single-family home pays $11,980.00 per unit (rates sourced ). The full breakdown is below.

Simpsonville Impact Fees by Project Type

Simpsonville: Single-Family Impact Fees

A new single-family home in Simpsonville pays $11,980.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Trunk & Treatment New Account Fee (ReWa — City of Simpsonville) — 5/8-inch or 3/4-inch meter ($5,500.00), Water Capacity Fee (Greenville Water — City of Simpsonville) — 5/8-inch meter ($2,780.00) and Water Connection (Tap) Fee (Greenville Water — City of Simpsonville) — 5/8-inch meter, service installed by Greenville Water ($1,500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Simpsonville Impact Fee Schedule
Water$5,280.00
Sewer$6,700.00
  • Sewer Trunk & Treatment New Account Fee (ReWa — City of Simpsonville) — 5/8-inch or 3/4-inch meter
    Renewable Water Resources (ReWa)
    One-time ReWa wastewater trunk and treatment new account fee, effective October 1, 2026: $5,500 for a home on a 5/8-inch or 3/4-inch water meter (was $4,110), $11,000 on a 1-inch meter, $33,000 on a 1-1/2-inch meter. Scheduled to rise to $6,947 (5/8 or 3/4 inch) on October 1, 2027, subject to ReWa budget approval. Charged in addition to the City of Simpsonville sewer tap and capacity fees.
    $5,500.00
  • Sewer Capacity Fee (City of Simpsonville)
    Single dwelling unit residential
    City of Simpsonville
    City of Simpsonville sewer capacity fee: $700 per residential connection under the FY 2026-27 fee schedule, charged with the $500 sewer tap fee and ReWa's trunk and treatment fee.
    $700.00
  • Sewer Tap Fee (City of Simpsonville)
    Residential
    City of Simpsonville
    City of Simpsonville sewer tap fee for a residential connection: $500 under the FY 2026-27 fee schedule, plus a $25 inspection fee. The city sewer capacity fee and ReWa's trunk and treatment fee are charged in addition.
    $500.00
City$0.00
Total (Simpsonville): $11,980.00
Sources last checked Official fee schedules:Greenville Water Renewable Water Resources (ReWa) City of Simpsonville Greenville County

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Simpsonville: Multifamily Impact Fees

A new multifamily unit in Simpsonville pays $9,910.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Trunk & Treatment New Account Fee (ReWa — City of Simpsonville, MF) — 2-BR ($4,125.00), Water Capacity Fee (Greenville Water — City of Simpsonville, MF) — 2-BR under 1,200 sq ft ($2,085.00) and Water Connection (Tap) Fee (Greenville Water — City of Simpsonville, MF) — 5/8-inch meter, service installed by Greenville Water ($1,500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Simpsonville Impact Fee Schedule
Water$4,585.00
Sewer$5,325.00
  • Sewer Trunk & Treatment New Account Fee (ReWa — City of Simpsonville, MF) — 2-BR
    2-BR (225 gpd)
    Renewable Water Resources (ReWa)
    One-time ReWa wastewater trunk and treatment new account fee per apartment or condominium unit, effective October 1, 2026: $4,125 for a two-bedroom unit (225 gallons per day), $2,750 for one bedroom, $5,500 for three bedrooms. A further increase is scheduled for October 1, 2027, subject to ReWa budget approval.
    $4,125.00
  • Sewer Capacity Fee (City of Simpsonville, MF)
    Multi-dwelling unit residential, per unit
    City of Simpsonville
    One-time City of Simpsonville sewer capacity fee, charged per dwelling unit for multi-unit residential at the same rate as a single-family home (adopted FY2026-27 fee schedule; City Code Sec. 36-35). Paid in addition to the City sewer tap fee and ReWa's new account fee.
    $700.00
  • Sewer Tap Fee (City of Simpsonville, MF)
    City of Simpsonville
    City of Simpsonville sewer tap fee: $500 per residential tap under the FY 2026-27 fee schedule ($1,000 commercial), plus a $25 inspection fee. It is charged per tap, not per unit, so a building served by one tap pays once.
    $500.00
City$0.00
Total (Simpsonville): $9,910.00
Sources last checked Official fee schedules:Greenville Water Renewable Water Resources (ReWa) City of Simpsonville Greenville County

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Simpsonville: Commercial Impact Fees

Commercial development in Simpsonville pays no per-square-foot impact fees, but owes $30,702.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $30,702.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Capacity Fee (City of Simpsonville, Commercial) ($1,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Simpsonville Impact Fee Schedule
Water$11,702.00 one-time
  • Water Capacity Fee (Greenville Water) — 1" meter
    Greenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced on estimated maximum daily flow. Rate shown is 1-inch meter.
    $9,267.00 one-time
  • Water Contribution Fee (Greenville Water) — 1" meter
    Greenville Water
    Greenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
    $1,000.00 one-time
  • Water Connection Fee (Greenville Water) — 1" meter
    Greenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
    $910.00 one-time
  • Water Meter Fee (Greenville Water) — 1" meter
    Greenville Water
    Greenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
    $525.00 one-time
Sewer$19,000.00 one-time
  • Sewer New Account Fee (ReWa) — 1" meter
    Renewable Water Resources (ReWa)
    ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
    $16,500.00 one-time
  • Sewer Capacity Fee (City of Simpsonville, Commercial)
    City of Simpsonville
    City of Simpsonville sewer capacity fee for an office, commercial or service building: $1,500, charged for each separate business in a multi-unit building (City Code Sec. 36-35). Industrial buildings pay $3,500 per business unit. Charged with the city sewer tap fee and ReWa's trunk and treatment fee.
    $1,500.00 one-time
  • Sewer Tap Fee (City of Simpsonville, Commercial)
    City of Simpsonville
    City of Simpsonville sewer tap fee for a commercial connection: $1,000 under the FY 2026-27 fee schedule, plus a $25 inspection fee. The city sewer capacity fee and ReWa's trunk and treatment fee are charged in addition.
    $1,000.00 one-time
City$0.00
County$0.00
Total (Simpsonville): $30,702.00 one-time (≈ $30,702.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Greenville Water Renewable Water Resources (ReWa) City of Simpsonville
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Simpsonville: Industrial Impact Fees

Industrial development in Simpsonville pays no per-square-foot impact fees, but owes $30,702.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $30,702.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Capacity Fee (City of Simpsonville, Commercial) ($1,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Simpsonville Impact Fee Schedule
Water$11,702.00 one-time
  • Water Capacity Fee (Greenville Water) — 1" meter
    Greenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced on estimated maximum daily flow. Rate shown is 1-inch meter.
    $9,267.00 one-time
  • Water Contribution Fee (Greenville Water) — 1" meter
    Greenville Water
    Greenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
    $1,000.00 one-time
  • Water Connection Fee (Greenville Water) — 1" meter
    Greenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
    $910.00 one-time
  • Water Meter Fee (Greenville Water) — 1" meter
    Greenville Water
    Greenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
    $525.00 one-time
Sewer$19,000.00 one-time
  • Sewer New Account Fee (ReWa) — 1" meter
    Renewable Water Resources (ReWa)
    ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
    $16,500.00 one-time
  • Sewer Capacity Fee (City of Simpsonville, Commercial)
    City of Simpsonville
    City of Simpsonville sewer capacity fee for an office, commercial or service building: $1,500, charged for each separate business in a multi-unit building (City Code Sec. 36-35). Industrial buildings pay $3,500 per business unit. Charged with the city sewer tap fee and ReWa's trunk and treatment fee.
    $1,500.00 one-time
  • Sewer Tap Fee (City of Simpsonville, Commercial)
    City of Simpsonville
    City of Simpsonville sewer tap fee for a commercial connection: $1,000 under the FY 2026-27 fee schedule, plus a $25 inspection fee. The city sewer capacity fee and ReWa's trunk and treatment fee are charged in addition.
    $1,000.00 one-time
City$0.00
County$0.00
Total (Simpsonville): $30,702.00 one-time (≈ $30,702.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Greenville Water Renewable Water Resources (ReWa) City of Simpsonville
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Simpsonville: Office Impact Fees

Office development in Simpsonville pays no per-square-foot impact fees, but owes $30,702.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to about $30,702.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer New Account Fee (ReWa) — 1" meter ($16,500.00 one-time), Water Capacity Fee (Greenville Water) — 1" meter ($9,267.00 one-time) and Sewer Capacity Fee (City of Simpsonville, Commercial) ($1,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Simpsonville Impact Fee Schedule
Water$11,702.00 one-time
  • Water Capacity Fee (Greenville Water) — 1" meter
    Greenville Water capacity fee, effective January 1, 2026, set by water meter size. Meters 3-inch and larger are priced on estimated maximum daily flow. Rate shown is 1-inch meter.
    $9,267.00 one-time
  • Water Contribution Fee (Greenville Water) — 1" meter
    Greenville Water
    Greenville Water contribution fee (contribution in aid of construction), set by tap size and in effect since September 1, 2015: $1,000 for a 5/8-inch or 1-inch meter, $1,500 for 1-1/2 or 2-inch, $2,000 for 3 or 4-inch, $2,500 for 6-inch and $3,000 for 8-inch. Charged with the capacity and connection fees.
    $1,000.00 one-time
  • Water Connection Fee (Greenville Water) — 1" meter
    Greenville Water connection (tap) fee by meter size, effective January 1, 2026. Tap sizes 4-inch and larger are priced at cost. Rate shown is 1-inch meter.
    $910.00 one-time
  • Water Meter Fee (Greenville Water) — 1" meter
    Greenville Water
    Greenville Water meter fee, effective January 1, 2026, by meter size: $350 for 5/8-inch, $525 for 1-inch, $750 for 1-1/2-inch, $1,600 for 2-inch, $2,800 for 3-inch and $4,000 for 4-inch; larger meters are quoted.
    $525.00 one-time
Sewer$19,000.00 one-time
  • Sewer New Account Fee (ReWa) — 1" meter
    Renewable Water Resources (ReWa)
    ReWa regional trunk and treatment new account fee for commercial and industrial connections, set by the installed water meter size (irrigation and fire meters excluded), effective October 1, 2026: $5,500 for a 5/8-inch meter, $11,000 for 3/4-inch, $16,500 for 1-inch, $33,000 for 1-1/2-inch and $49,500 for 2-inch, up to $880,000 for 8-inch. Scheduled to rise October 1, 2027 (1-inch: $20,841). Charged in addition to the local sewer connection fee.
    $16,500.00 one-time
  • Sewer Capacity Fee (City of Simpsonville, Commercial)
    City of Simpsonville
    City of Simpsonville sewer capacity fee for an office, commercial or service building: $1,500, charged for each separate business in a multi-unit building (City Code Sec. 36-35). Industrial buildings pay $3,500 per business unit. Charged with the city sewer tap fee and ReWa's trunk and treatment fee.
    $1,500.00 one-time
  • Sewer Tap Fee (City of Simpsonville, Commercial)
    City of Simpsonville
    City of Simpsonville sewer tap fee for a commercial connection: $1,000 under the FY 2026-27 fee schedule, plus a $25 inspection fee. The city sewer capacity fee and ReWa's trunk and treatment fee are charged in addition.
    $1,000.00 one-time
City$0.00
County$0.00
Total (Simpsonville): $30,702.00 one-time (≈ $30,702.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Greenville Water Renewable Water Resources (ReWa) City of Simpsonville
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Simpsonville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Simpsonville Impact Fee FAQs

What are the total impact fees for a single-family home in Simpsonville, South Carolina?

A new single-family home in Simpsonville pays $11,980.00 per unit in combined impact fees (rates sourced November 11, 2026).

How much are commercial impact fees in Simpsonville?

Commercial development in Simpsonville pays no per-square-foot impact fees, but owes $30,702.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Simpsonville charge its own impact fees?

Yes. Simpsonville levies its own municipal impact or utility fees. Greenville County does not currently add county-level impact fees inside Simpsonville. The schedule on this page shows every fee that applies to development in Simpsonville.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Greenville County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000