Skip to content
IMPACTFEES.ORG

Greer, South Carolina Impact Fees

Greer applies its own fee schedule. Greenville County does not currently add county-level impact fees inside city limits. A new single-family home pays $13,302.00 per unit (rates sourced ). The full breakdown is below.

Greer Impact Fees by Project Type

Greer: Single-Family Impact Fees

A new single-family home in Greer pays $13,302.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Greer CPW) — 3/4-inch meter ($5,739.00), Development Impact Fee (City of Greer) — Single Family ($5,234.00) and Water Capacity Fee (Greer CPW) — 3/4-inch meter ($1,504.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Greer Impact Fee Schedule
Water$1,829.00
  • Water Capacity Fee (Greer CPW) — 3/4-inch meter
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works water capacity fee, charged per meter by meter size: $1,504 for a 3/4-inch meter, $3,760 for 1-inch, $7,520 for 1-1/2-inch and $12,032 for 2-inch, the same inside and outside the city. Charged in addition to the water tap fee.
    $1,504.00
  • Water Tap Fee (Greer CPW) — 3/4-inch meter
    3/4-inch meter, inside city
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works water tap fee inside the City of Greer, by meter size: $325 for a 3/4-inch meter, $550 for 1-inch, $2,500 for 1-1/2-inch and $3,063 for 2-inch (outside the city a 3/4-inch tap is $1,125). Charged in addition to the water capacity fee.
    $325.00
Sewer$6,239.00
  • Sewer Capacity Fee (Greer CPW) — 3/4-inch meter
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works sewer capacity fee, by the size of the water meter: $5,739 for a 3/4-inch meter, $14,348 for 1-inch, $28,695 for 1-1/2-inch and $45,912 for 2-inch, the same inside and outside the city. Charged in addition to the $500 sewer tap fee.
    $5,739.00
  • Sewer Tap Fee (Greer CPW)
    Residential, inside city
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works sewer tap fee: $500 per residential tap inside the City of Greer at any meter size ($650 outside the city). Charged in addition to the sewer capacity fee.
    $500.00
  • Sewer Trunk & Treatment New Account Fee (ReWa — City of Greer) — Greer CPW-treated areas
    Renewable Water Resources (ReWa)
    Most of Greer is served by Greer CPW's own wastewater treatment plants and pays no ReWa new account fee. In select areas Greer CPW sends wastewater to ReWa for treatment; there the ReWa trunk and treatment new account fee applies (see the other options).
    $0.00
City$5,234.00
  • Development Impact Fee (City of Greer) — Single Family
    Single family, attached or detached
    City of Greer
    City of Greer development impact fee for a single-family home, attached or detached: $5,234 per unit under the comprehensive fee schedule effective July 1, 2026 (first adopted by Ordinance 1-2025 in January 2025).
    $5,234.00
Total (Greer): $13,302.00

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greer: Multifamily Impact Fees

A new multifamily unit in Greer pays $11,315.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Greer CPW, MF) — 3/4-inch meter ($5,739.00), Water Capacity Fee (Greer CPW, MF) — 3/4-inch meter ($1,504.00) and Sewer Tap Fee (Greer CPW, MF) ($500.00).

Development Impact Fee (City of Greer, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Greer Impact Fee Schedule
Water$1,829.00
  • Water Capacity Fee (Greer CPW, MF) — 3/4-inch meter
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works charges its water capacity fee per meter, by meter size, not per apartment: $1,504 for a 3/4-inch meter, $3,760 for 1-inch, $7,520 for 1-1/2-inch and $12,032 for 2-inch, the same inside and outside the city. A building served by one meter pays once; larger master meters are priced from the same schedule.
    $1,504.00
  • Water Tap Fee (Greer CPW, MF) — 3/4-inch meter
    3/4-inch meter, inside city
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works charges its water tap fee per tap, by meter size, not per apartment: $325 for a 3/4-inch meter inside the City of Greer, $550 for 1-inch, $2,500 for 1-1/2-inch and $3,063 for 2-inch. A building served by one tap pays once.
    $325.00
Sewer$6,239.00
  • Sewer Capacity Fee (Greer CPW, MF) — 3/4-inch meter
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works sets its one-time sewer capacity fee by the size of the water meter serving the building, not per apartment: $5,739 for a 3/4-inch meter, $14,348 for 1-inch, $28,695 for 1-1/2-inch and $45,912 for 2-inch, the same inside and outside the city. A building served by one meter pays once.
    $5,739.00
  • Sewer Tap Fee (Greer CPW, MF)
    Residential, inside city
    Greer Commission of Public Works (Greer CPW)
    Greer Commission of Public Works sewer tap fee: $500 per residential tap inside the City of Greer at any meter size ($650 outside the city), charged per tap, not per apartment, so a building served by one tap pays once. A separate sewer capacity fee applies by meter size.
    $500.00
  • Sewer Trunk & Treatment New Account Fee (ReWa — City of Greer, MF) — Greer CPW-treated areas
    Renewable Water Resources (ReWa)
    Most of Greer is served by Greer CPW's own wastewater treatment plants and pays no ReWa new account fee. In select areas Greer CPW sends wastewater to ReWa for treatment; there the ReWa per-unit new account fee applies (see the other options).
    $0.00
City$3,247.00
  • Development Impact Fee (City of Greer, MF)
    Multifamily, per 1,000 sq ft
    City of Greer
    City of Greer development impact fee for multifamily dwellings: $3,247 per 1,000 square feet under the comprehensive fee schedule effective July 1, 2026 (about $3,247 for a 1,000 square foot unit). Ordinance 1-2025 had set $3,089 per unit; the current schedule bases the multifamily fee on floor area.
    $3,247.00Requires confirmation
Total (Greer): $11,315.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greer: Commercial Impact Fees

Commercial development in Greer pays $3.25 per square foot in impact fees, plus $19,858.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $182,208.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Greer CPW) — 1" meter ($14,348.00 one-time), Water Capacity Fee (Greer CPW) — 1" meter ($3,760.00 one-time) and Sewer Tap Fee (Greer CPW) ($1,200.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Greer Impact Fee Schedule
Water$4,310.00 one-time
  • Water Capacity Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW water capacity fee, per water meter. Rate shown is 1-inch meter.
    $3,760.00 one-time
  • Water Tap Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW water tap (connection) fee by meter size, inside-city rate. Rate shown is 1-inch meter; 8-inch and larger by quote. Outside-city rates are higher for 3/4-inch and 1-inch.
    $550.00 one-time
Sewer$15,548.00 one-time
  • Sewer Capacity Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW sewer capacity fee by water meter size. Rate shown is 1-inch meter.
    $14,348.00 one-time
  • Sewer Tap Fee (Greer CPW)
    Greer Commission of Public Works
    Greer CPW sewer tap (connection) fee, inside-city commercial rate ($1,200), same for all meter sizes; outside-city rate is $2,250.
    $1,200.00 one-time
  • Sewer New Account Fee — ReWa, Greer CPW-treated areas
    Renewable Water Resources (ReWa)
    Most of Greer is served by Greer CPW's own wastewater plants, where no ReWa new account fee applies. In select areas where ReWa treats Greer CPW wastewater, ReWa's trunk and treatment new account fee is charged by meter size.
    $0.00
City$3.25/sq ft
  • Development Impact Fee (City of Greer, Commercial)
    City of Greer
    City of Greer development impact fee for retail and other commercial uses: $3,247 per 1,000 square feet under the comprehensive fee schedule effective July 1, 2026 (first adopted by Ordinance 1-2025 in January 2025). Retail includes shopping centers, restaurants, automotive dealerships, theaters, hotels and motels.
    $3.25/sq ft
County$0.00
Total (Greer): $3.25/sq ft + $19,858.00 one-time (≈ $182,208.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Greer Commission of Public Works Renewable Water Resources (ReWa) City of Greer Greenville County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greer: Industrial Impact Fees

Industrial development in Greer pays $1.10 per square foot in impact fees, plus $19,858.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $74,958.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Greer CPW) — 1" meter ($14,348.00 one-time), Water Capacity Fee (Greer CPW) — 1" meter ($3,760.00 one-time) and Sewer Tap Fee (Greer CPW) ($1,200.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Greer Impact Fee Schedule
Water$4,310.00 one-time
  • Water Capacity Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW water capacity fee, per water meter. Rate shown is 1-inch meter.
    $3,760.00 one-time
  • Water Tap Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW water tap (connection) fee by meter size, inside-city rate. Rate shown is 1-inch meter; 8-inch and larger by quote. Outside-city rates are higher for 3/4-inch and 1-inch.
    $550.00 one-time
Sewer$15,548.00 one-time
  • Sewer Capacity Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW sewer capacity fee by water meter size. Rate shown is 1-inch meter.
    $14,348.00 one-time
  • Sewer Tap Fee (Greer CPW)
    Greer Commission of Public Works
    Greer CPW sewer tap (connection) fee, inside-city commercial rate ($1,200), same for all meter sizes; outside-city rate is $2,250.
    $1,200.00 one-time
  • Sewer New Account Fee — ReWa, Greer CPW-treated areas
    Renewable Water Resources (ReWa)
    Most of Greer is served by Greer CPW's own wastewater plants, where no ReWa new account fee applies. In select areas where ReWa treats Greer CPW wastewater, ReWa's trunk and treatment new account fee is charged by meter size.
    $0.00
City$1.10/sq ft
  • Development Impact Fee (City of Greer, Industrial)
    City of Greer
    City of Greer development impact fee for industrial uses: $1,102 per 1,000 square feet under the comprehensive fee schedule effective July 1, 2026 (first adopted by Ordinance 1-2025 in January 2025).
    $1.10/sq ft
County$0.00
Total (Greer): $1.10/sq ft + $19,858.00 one-time (≈ $74,958.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Greer Commission of Public Works Renewable Water Resources (ReWa) City of Greer Greenville County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greer: Office Impact Fees

Office development in Greer pays $2.35 per square foot in impact fees, plus $19,858.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $78,583.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Greer CPW) — 1" meter ($14,348.00 one-time), Water Capacity Fee (Greer CPW) — 1" meter ($3,760.00 one-time) and Sewer Tap Fee (Greer CPW) ($1,200.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Greer Impact Fee Schedule
Water$4,310.00 one-time
  • Water Capacity Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW water capacity fee, per water meter. Rate shown is 1-inch meter.
    $3,760.00 one-time
  • Water Tap Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW water tap (connection) fee by meter size, inside-city rate. Rate shown is 1-inch meter; 8-inch and larger by quote. Outside-city rates are higher for 3/4-inch and 1-inch.
    $550.00 one-time
Sewer$15,548.00 one-time
  • Sewer Capacity Fee (Greer CPW) — 1" meter
    Greer Commission of Public Works
    Greer CPW sewer capacity fee by water meter size. Rate shown is 1-inch meter.
    $14,348.00 one-time
  • Sewer Tap Fee (Greer CPW)
    Greer Commission of Public Works
    Greer CPW sewer tap (connection) fee, inside-city commercial rate ($1,200), same for all meter sizes; outside-city rate is $2,250.
    $1,200.00 one-time
  • Sewer New Account Fee — ReWa, Greer CPW-treated areas
    Renewable Water Resources (ReWa)
    Most of Greer is served by Greer CPW's own wastewater plants, where no ReWa new account fee applies. In select areas where ReWa treats Greer CPW wastewater, ReWa's trunk and treatment new account fee is charged by meter size.
    $0.00
City$2.35/sq ft
  • Development Impact Fee (City of Greer, Office)
    City of Greer
    City of Greer development impact fee for office and service uses: $2,349 per 1,000 square feet under the comprehensive fee schedule effective July 1, 2026 (first adopted by Ordinance 1-2025 in January 2025). Institutional uses (medical offices, schools, churches and similar) pay $2,319 per 1,000 square feet.
    $2.35/sq ft
County$0.00
Total (Greer): $2.35/sq ft + $19,858.00 one-time (≈ $78,583.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Greer Commission of Public Works Renewable Water Resources (ReWa) City of Greer Greenville County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenville County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greer Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Greer Impact Fee FAQs

What are the total impact fees for a single-family home in Greer, South Carolina?

A new single-family home in Greer pays $13,302.00 per unit in combined impact fees (rates sourced November 18, 2026).

How much are commercial impact fees in Greer?

Commercial development in Greer pays $3.25 per square foot in impact fees, plus $19,858.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $182,208.00 for a 50,000 sq ft building.

Does Greer charge its own impact fees?

Yes. Greer levies its own municipal impact or utility fees. Greenville County does not currently add county-level impact fees inside Greer. The schedule on this page shows every fee that applies to development in Greer.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Greenville County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000