Spartanburg County Impact Fees by Project Type
Where in Spartanburg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Spartanburg County: Single-Family Impact Fees
A new single-family home in unincorporated Spartanburg County pays $3,205.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee — Spartanburg Water System, 3/4" ($2,005.00) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District) ($1,200.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Spartanburg County Impact Fee Schedule
- Water Connection Fee — Spartanburg Water System, 3/4"$2,005.00Spartanburg Water SystemSpartanburg Water System, the main water provider in the unincorporated county, charges a one-time tap, meter and capacity fee of $2,005 for a 3/4-inch connection outside Spartanburg city limits (effective September 1, 2022). A participation fee of $1,500 may also apply. Parts of the county are served by other water districts with their own fees.
- Sewer Capacity Fee (Spartanburg Sanitary Sewer District)$1,200.00Spartanburg Sanitary Sewer DistrictIn the sewered unincorporated area around Spartanburg, the Spartanburg Sanitary Sewer District charges a one-time sewer capacity fee of $1,200 per residential equivalent unit (300 gallons per day) for a new single-family connection, plus a $35 processing fee on each sewer application. Schedule effective September 1, 2022. Much of the rural county has no public sewer.
- Municipal Impact Fee (Spartanburg County - Unincorporated)$0.00Spartanburg County
- County Impact Fee (Spartanburg County)$0.00Spartanburg County
Where in Spartanburg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Spartanburg County: Multifamily Impact Fees
A new multifamily unit in unincorporated Spartanburg County pays $2,905.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (MF) — Spartanburg Water System, 3/4" ($2,005.00) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, MF) — 2 BR ($900.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Spartanburg County Impact Fee Schedule
- Water Connection Fee (MF) — Spartanburg Water System, 3/4"$2,005.00Spartanburg Water SystemSpartanburg Water System has no separate multifamily rate: its one-time tap, meter and capacity charge is set per water connection by meter size. A 3/4-inch connection outside Spartanburg city limits is $2,005 (1-inch $3,563, 1.5-inch $8,120, 2-inch $11,865), so a building on one connection pays once. A participation fee of $1,500 may also apply to each connection.
- Sewer Capacity Fee (Spartanburg Sanitary Sewer District, MF) — 2 BR$900.00Spartanburg Sanitary Sewer DistrictThe Spartanburg Sanitary Sewer District charges its one-time sewer capacity fee per apartment by bedroom count: $600 for a 1-bedroom unit (150 gallons per day), $900 for a 2-bedroom unit (225 gallons per day) and $1,200 for a 3-bedroom unit (300 gallons per day), plus a $35 processing fee on each sewer application. Schedule effective September 1, 2022.
- Municipal Impact Fee (Spartanburg County - Unincorporated, MF)$0.00Spartanburg County
- County Impact Fee (Spartanburg County, MF)$0.00Spartanburg County
Where in Spartanburg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Spartanburg County: Commercial Impact Fees
Commercial development in unincorporated Spartanburg County pays no per-square-foot impact fees, but owes $6,563.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $6,563.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Spartanburg Water System, 1" ($3,563.00 one-time) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Spartanburg County Impact Fee Schedule
- Water Connection Fee — Spartanburg Water System, 1"$3,563.00 one-timeSpartanburg Water SystemEffective Sept 1, 2022. Spartanburg Water System connection fee (tap + meter + capacity) by meter size; outside-City-of-Spartanburg rates apply in the unincorporated area. Meters larger than 2" quoted by the utility. A $1,500 participation fee may also apply.
- Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"$3,000.00 one-timeSpartanburg Sanitary Sewer DistrictEffective Sept 1, 2022. SSSD nonresidential sewer capacity fee by meter size; serves sewered portions of the unincorporated area. Sizes larger than 8" set by the District. A $35 sewer application processing fee also applies.
- Municipal Impact Fee (Spartanburg County - Unincorporated, Commercial)$0.00Spartanburg County
- County Impact Fee (Spartanburg County, Commercial)$0.00Spartanburg County
Where in Spartanburg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Spartanburg County: Industrial Impact Fees
Industrial development in unincorporated Spartanburg County pays no per-square-foot impact fees, but owes $6,563.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $6,563.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Spartanburg Water System, 1" ($3,563.00 one-time) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Spartanburg County Impact Fee Schedule
- Water Connection Fee — Spartanburg Water System, 1"$3,563.00 one-timeSpartanburg Water SystemEffective Sept 1, 2022. Spartanburg Water System connection fee (tap + meter + capacity) by meter size; outside-City-of-Spartanburg rates apply in the unincorporated area. Meters larger than 2" quoted by the utility. A $1,500 participation fee may also apply.
- Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"$3,000.00 one-timeSpartanburg Sanitary Sewer DistrictEffective Sept 1, 2022. SSSD nonresidential sewer capacity fee by meter size; serves sewered portions of the unincorporated area. Sizes larger than 8" set by the District. A $35 sewer application processing fee also applies.
- Municipal Impact Fee (Spartanburg County - Unincorporated, Industrial)$0.00Spartanburg County
- County Impact Fee (Spartanburg County, Industrial)$0.00Spartanburg County
Where in Spartanburg County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Spartanburg County: Office Impact Fees
Office development in unincorporated Spartanburg County pays no per-square-foot impact fees, but owes $6,563.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 25,000 sq ft building, that comes to about $6,563.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Spartanburg Water System, 1" ($3,563.00 one-time) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Spartanburg County Impact Fee Schedule
- Water Connection Fee — Spartanburg Water System, 1"$3,563.00 one-timeSpartanburg Water SystemEffective Sept 1, 2022. Spartanburg Water System connection fee (tap + meter + capacity) by meter size; outside-City-of-Spartanburg rates apply in the unincorporated area. Meters larger than 2" quoted by the utility. A $1,500 participation fee may also apply.
- Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"$3,000.00 one-timeSpartanburg Sanitary Sewer DistrictEffective Sept 1, 2022. SSSD nonresidential sewer capacity fee by meter size; serves sewered portions of the unincorporated area. Sizes larger than 8" set by the District. A $35 sewer application processing fee also applies.
- Municipal Impact Fee (Spartanburg County - Unincorporated, Office)$0.00Spartanburg County
- County Impact Fee (Spartanburg County, Office)$0.00Spartanburg County
Spartanburg County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Spartanburg County Impact Fee FAQs
What are single-family impact fees in Spartanburg County, South Carolina?
A new single-family home in unincorporated Spartanburg County pays $3,205.00 per unit in impact fees (rates sourced November 14, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Spartanburg County?
Multifamily development in unincorporated Spartanburg County pays $2,905.00 per unit in impact fees (rates sourced November 14, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Spartanburg County?
Commercial development in unincorporated Spartanburg County pays no per-square-foot impact fees, but owes $6,563.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Do cities in Spartanburg County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 13 of 13 cities in Spartanburg County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.