Skip to content
IMPACTFEES.ORG

Inman, South Carolina Impact Fees

Inman applies its own fee schedule. Spartanburg County does not currently add county-level impact fees inside city limits. A new single-family home pays $8,452.00 per unit (rates sourced ). The full breakdown is below.

Inman Impact Fees by Project Type

Inman: Single-Family Impact Fees

A new single-family home in Inman pays $8,452.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Development Impact Fee (City of Inman) ($4,477.00), Sewer Capacity Fee (City of Inman) ($2,000.00) and Water Tap Fee (Inman-Campobello Water District) — 3/4" ($1,975.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Inman Impact Fee Schedule
Water$1,975.00
  • Water Tap Fee (Inman-Campobello Water District) — 3/4"
    Inman-Campobello Water District
    Water in Inman is provided by the Inman-Campobello Water District, which charges $1,975 for a 3/4-inch tap with a 5/8-inch meter (effective July 1, 2025). A one-time participation fee of $1,975 per property may also apply in some areas.
    $1,975.00
Sewer$2,000.00
  • Sewer Capacity Fee (City of Inman)
    City of Inman
    The City of Inman charges a one-time sewer capacity fee for new connections. For a standard single-family home with a 5/8 x 3/4-inch water meter, the fee is $2,000 inside the city limits and $2,500 outside. Larger meters pay proportionally more based on equivalent residential unit factors.
    $2,000.00
City$4,477.00
  • Development Impact Fee (City of Inman)
    City of Inman
    A new single-family home in Inman pays a one-time development impact fee of $4,477 per dwelling unit, made up of fire ($2,700), police ($905) and recreation ($872) components. The fee has been in effect since August 13, 2024 and is collected when the building permit is applied for. It applies citywide, with no variation by lot size, house size or zone. The city's sewer capacity fee is charged separately and in addition.
    $4,477.00
County$0.00
Total (Inman): $8,452.00
Sources last checked Official fee schedules:Inman-Campobello Water District City of Inman Spartanburg County

Inman: Multifamily Impact Fees

A new multifamily unit in Inman pays $6,399.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Development Impact Fee (City of Inman, MF) ($2,424.00), Sewer Capacity Fee (City of Inman, MF) ($2,000.00) and Water Tap Fee (Inman-Campobello Water District, MF) ($1,975.00).

View the Full Inman Impact Fee Schedule
Water$1,975.00
  • Water Tap Fee (Inman-Campobello Water District, MF)
    Inman-Campobello Water District
    The Inman-Campobello Water District has no separate multifamily rate: its one-time tap and meter charge is set per connection by size. A 3/4-inch tap with a 5/8-inch meter is $1,975 (1-inch $3,315, 1.5-inch $6,715, 2-inch $9,015), effective July 1, 2025, so a building on one connection pays once. A one-time participation fee of $1,975 per property may also apply in some areas.
    $1,975.00
Sewer$2,000.00
  • Sewer Capacity Fee (City of Inman, MF)
    City of Inman
    The City of Inman charges its one-time sewer capacity fee per water connection by meter size rather than per apartment: $2,000 for a 5/8 or 3/4-inch meter inside the city ($2,500 outside), rising to $16,000 for a 2-inch meter. A building on one connection pays once. Ordinance 2019-16, effective September 1, 2019.
    $2,000.00
City$2,424.00
  • Development Impact Fee (City of Inman, MF)
    City of Inman
    Each new multifamily unit in Inman pays a one-time development impact fee of $2,424, made up of fire ($1,462), police ($490) and recreation ($472) components. The fee has been in effect since August 13, 2024 and is collected when the building permit is applied for. It is a flat per-unit charge with no variation by unit size or building height. The city's sewer capacity fee is charged separately and in addition.
    $2,424.00
County$0.00
Total (Inman): $6,399.00
Sources last checked Official fee schedules:Inman-Campobello Water District City of Inman Spartanburg County

Inman: Commercial Impact Fees

Commercial development in Inman pays $5.30 per square foot in impact fees, plus $8,315.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $273,415.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Inman) — 1" ($5,000.00 one-time), Water Tap & Meter Fee (Inman-Campobello Water District) — 1" ($3,315.00 one-time) and Fire Impact Fee (City of Inman, Commercial) ($3.97/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Inman Impact Fee Schedule
Water$3,315.00 one-time
  • Water Tap & Meter Fee (Inman-Campobello Water District) — 1"
    Inman-Campobello Water District
    Inman-Campobello Water District (wholesale from Broad River Water Authority) serves the City of Inman. Tap and meter fee set by meter size; effective July 1, 2025. A one-time $1,975 participation fee may also apply in some areas.
    $3,315.00 one-time
Sewer$5,000.00 one-time
  • Sewer Capacity Fee (City of Inman) — 1"
    City of Inman
    City of Inman sewer capacity fee, effective September 1, 2019. Charged once at connection, scaled by water-meter size. Inside-city rates shown; properties outside the city limits pay 25% more.
    $5,000.00 one-time
City$5.30/sq ft
  • Fire Impact Fee (City of Inman, Commercial)
    City of Inman
    Effective August 13, 2024. Fire development impact fee charged per 1,000 sq ft of floor area at building permit; applies citywide. Police impact fee is charged separately in addition.
    $3.97/sq ft
  • Police Impact Fee (City of Inman, Commercial)
    City of Inman
    Effective August 13, 2024. Police development impact fee charged per 1,000 sq ft of floor area at building permit; applies citywide.
    $1.33/sq ft
County$0.00
Total (Inman): $5.30/sq ft + $8,315.00 one-time (≈ $273,415.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Inman-Campobello Water District City of Inman Spartanburg County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Inman: Industrial Impact Fees

Industrial development in Inman pays $1.03 per square foot in impact fees, plus $8,315.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $59,915.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Inman) — 1" ($5,000.00 one-time), Water Tap & Meter Fee (Inman-Campobello Water District) — 1" ($3,315.00 one-time) and Fire Impact Fee (City of Inman, Industrial) ($0.77/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Inman Impact Fee Schedule
Water$3,315.00 one-time
  • Water Tap & Meter Fee (Inman-Campobello Water District) — 1"
    Inman-Campobello Water District
    Inman-Campobello Water District (wholesale from Broad River Water Authority) serves the City of Inman. Tap and meter fee set by meter size; effective July 1, 2025. A one-time $1,975 participation fee may also apply in some areas.
    $3,315.00 one-time
Sewer$5,000.00 one-time
  • Sewer Capacity Fee (City of Inman) — 1"
    City of Inman
    City of Inman sewer capacity fee, effective September 1, 2019. Charged once at connection, scaled by water-meter size. Inside-city rates shown; properties outside the city limits pay 25% more.
    $5,000.00 one-time
City$1.03/sq ft
  • Fire Impact Fee (City of Inman, Industrial)
    City of Inman
    Effective August 13, 2024. Fire development impact fee charged per 1,000 sq ft of floor area at building permit; applies citywide. Police impact fee is charged separately in addition.
    $0.77/sq ft
  • Police Impact Fee (City of Inman, Industrial)
    City of Inman
    Effective August 13, 2024. Police development impact fee charged per 1,000 sq ft of floor area at building permit; applies citywide.
    $0.26/sq ft
County$0.00
Total (Inman): $1.03/sq ft + $8,315.00 one-time (≈ $59,915.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Inman-Campobello Water District City of Inman Spartanburg County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Inman: Office Impact Fees

Office development in Inman pays $2.35 per square foot in impact fees, plus $8,315.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $67,140.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Inman) — 1" ($5,000.00 one-time), Water Tap & Meter Fee (Inman-Campobello Water District) — 1" ($3,315.00 one-time) and Fire Impact Fee (City of Inman, Office) ($1.76/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Inman Impact Fee Schedule
Water$3,315.00 one-time
  • Water Tap & Meter Fee (Inman-Campobello Water District) — 1"
    Inman-Campobello Water District
    Inman-Campobello Water District (wholesale from Broad River Water Authority) serves the City of Inman. Tap and meter fee set by meter size; effective July 1, 2025. A one-time $1,975 participation fee may also apply in some areas.
    $3,315.00 one-time
Sewer$5,000.00 one-time
  • Sewer Capacity Fee (City of Inman) — 1"
    City of Inman
    City of Inman sewer capacity fee, effective September 1, 2019. Charged once at connection, scaled by water-meter size. Inside-city rates shown; properties outside the city limits pay 25% more.
    $5,000.00 one-time
City$2.35/sq ft
  • Fire Impact Fee (City of Inman, Office)
    City of Inman
    Effective August 13, 2024. Fire development impact fee charged per 1,000 sq ft of floor area at building permit; applies citywide. Police impact fee is charged separately in addition.
    $1.76/sq ft
  • Police Impact Fee (City of Inman, Office)
    City of Inman
    Effective August 13, 2024. Police development impact fee charged per 1,000 sq ft of floor area at building permit; applies citywide.
    $0.59/sq ft
County$0.00
Total (Inman): $2.35/sq ft + $8,315.00 one-time (≈ $67,140.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Inman-Campobello Water District City of Inman Spartanburg County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Inman Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Inman Impact Fee FAQs

What are the total impact fees for a single-family home in Inman, South Carolina?

A new single-family home in Inman pays $8,452.00 per unit in combined impact fees (rates sourced November 14, 2026).

How much are commercial impact fees in Inman?

Commercial development in Inman pays $5.30 per square foot in impact fees, plus $8,315.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $273,415.00 for a 50,000 sq ft building.

Does Inman charge its own impact fees?

Yes. Inman levies its own municipal impact or utility fees. Spartanburg County does not currently add county-level impact fees inside Inman. The schedule on this page shows every fee that applies to development in Inman.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Spartanburg County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000