Chesnee applies its own fee schedule. Spartanburg County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,705.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Chesnee Impact Fees by Project Type

Chesnee: Single-Family Impact Fees

A new single-family home in Chesnee pays $6,705.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (Liberty-Chesnee-Fingerville Water District) ($2,500.00), Water Tap, Meter & Capacity Fee (Spartanburg Water System) ($2,005.00) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District) ($1,200.00).

Sewer Tap Fee (City of Chesnee) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Chesnee Impact Fee Schedule
Water$4,505.00
Sewer$2,200.00
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District)
    Spartanburg Sanitary Sewer District
    Sewer in Chesnee is provided by the Spartanburg Sanitary Sewer District, which charges a one-time sewer capacity fee of $1,200 per residential equivalent unit (300 gallons per day) for a new single-family connection, plus a $35 processing fee on each sewer application. Schedule effective September 1, 2022.
    $1,200.00
  • Sewer Tap Fee (City of Chesnee)
    City of Chesnee
    The City of Chesnee's building permit fee schedule lists a residential sewer tap charge of $1,000, collected with the building permit and separate from the sewer district's capacity fee.
    $1,000.00Requires confirmation
City$0.00
County$0.00
Total (Chesnee): $6,705.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chesnee: Multifamily Impact Fees

A new multifamily unit in Chesnee pays $4,400.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (Liberty-Chesnee-Fingerville Water District, MF) ($2,500.00) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, MF) — 2 BR ($900.00).

Sewer Tap Fee (City of Chesnee, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Chesnee Impact Fee Schedule
Water$2,500.00
  • Water Tap Fee (Liberty-Chesnee-Fingerville Water District, MF)
    Liberty-Chesnee-Fingerville Water District
    Water in Chesnee is provided by the Liberty-Chesnee-Fingerville Water District, which has no separate multifamily rate. A 3/4-inch residential tap is $2,500 under the tap fee schedule in effect since August 1, 2010, so a building on one connection pays once.
    $2,500.00
Sewer$1,900.00
  • Sewer Tap Fee (City of Chesnee, MF)
    City of Chesnee
    The City of Chesnee's building permit fee schedule lists a residential sewer tap charge of $1,000 per tap, collected with the building permit and separate from the sewer district's capacity fee. A building on one tap pays once.
    $1,000.00Requires confirmation
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, MF) — 2 BR
    Spartanburg Sanitary Sewer District
    The Spartanburg Sanitary Sewer District charges its one-time sewer capacity fee per apartment by bedroom count: $600 for a 1-bedroom unit (150 gallons per day), $900 for a 2-bedroom unit (225 gallons per day) and $1,200 for a 3-bedroom unit (300 gallons per day), plus a $35 processing fee on each sewer application. Schedule effective September 1, 2022.
    $900.00
City$0.00
County$0.00
Total (Chesnee): $4,400.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Chesnee: Commercial Impact Fees

Commercial development in Chesnee pays no per-square-foot impact fees, but owes $12,563.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $12,563.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap, Meter & Capacity Fee (Spartanburg Water System, outside-city) — 1" ($3,563.00 one-time) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" ($3,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Commercial Sewer Tap Fee (City of Chesnee) and Water Tap Fee (Liberty-Chesnee-Fingerville Water District) — 1" are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Chesnee Impact Fee Schedule
Water$7,063.00 one-time
Sewer$5,500.00 one-time
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"
    Spartanburg Sanitary Sewer District
    Effective Sept 1, 2022. SSSD nonresidential sewer capacity fee by meter size; sizes larger than 8" set by the District. A $35 sewer application processing fee also applies.
    $3,000.00 one-time
  • Commercial Sewer Tap Fee (City of Chesnee)
    City of Chesnee
    The City of Chesnee's building permit fee schedule lists a commercial sewer tap charge of $2,500, collected with the building permit. Sewer service in Chesnee is provided by the Spartanburg Sanitary Sewer District, which also charges its own capacity fee.
    $2,500.00 one-timeRequires confirmation
County$0.00
Total (Chesnee): $12,563.00 one-time (≈ $12,563.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chesnee: Industrial Impact Fees

Industrial development in Chesnee pays no per-square-foot impact fees, but owes $12,563.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $12,563.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap, Meter & Capacity Fee (Spartanburg Water System, outside-city) — 1" ($3,563.00 one-time) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" ($3,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Commercial Sewer Tap Fee (City of Chesnee) and Water Tap Fee (Liberty-Chesnee-Fingerville Water District) — 1" are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Chesnee Impact Fee Schedule
Water$7,063.00 one-time
Sewer$5,500.00 one-time
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"
    Spartanburg Sanitary Sewer District
    Effective Sept 1, 2022. SSSD nonresidential sewer capacity fee by meter size; sizes larger than 8" set by the District. A $35 sewer application processing fee also applies.
    $3,000.00 one-time
  • Commercial Sewer Tap Fee (City of Chesnee)
    City of Chesnee
    The City of Chesnee's building permit fee schedule lists a commercial sewer tap charge of $2,500, collected with the building permit. Sewer service in Chesnee is provided by the Spartanburg Sanitary Sewer District, which also charges its own capacity fee.
    $2,500.00 one-timeRequires confirmation
County$0.00
Total (Chesnee): $12,563.00 one-time (≈ $12,563.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chesnee: Office Impact Fees

Office development in Chesnee pays no per-square-foot impact fees, but owes $12,563.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $12,563.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap, Meter & Capacity Fee (Spartanburg Water System, outside-city) — 1" ($3,563.00 one-time) and Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" ($3,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Commercial Sewer Tap Fee (City of Chesnee) and Water Tap Fee (Liberty-Chesnee-Fingerville Water District) — 1" are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Chesnee Impact Fee Schedule
Water$7,063.00 one-time
Sewer$5,500.00 one-time
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"
    Spartanburg Sanitary Sewer District
    Effective Sept 1, 2022. SSSD nonresidential sewer capacity fee by meter size; sizes larger than 8" set by the District. A $35 sewer application processing fee also applies.
    $3,000.00 one-time
  • Commercial Sewer Tap Fee (City of Chesnee)
    City of Chesnee
    The City of Chesnee's building permit fee schedule lists a commercial sewer tap charge of $2,500, collected with the building permit. Sewer service in Chesnee is provided by the Spartanburg Sanitary Sewer District, which also charges its own capacity fee.
    $2,500.00 one-timeRequires confirmation
County$0.00
Total (Chesnee): $12,563.00 one-time (≈ $12,563.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chesnee Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Chesnee Impact Fee FAQs

What are the total impact fees for a single-family home in Chesnee, South Carolina?

A new single-family home in Chesnee pays $6,705.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Chesnee?

Commercial development in Chesnee pays no per-square-foot impact fees, but owes $12,563.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Chesnee charge its own impact fees?

Yes. Chesnee levies its own municipal impact or utility fees. Spartanburg County does not currently add county-level impact fees inside Chesnee. The schedule on this page shows every fee that applies to development in Chesnee.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Spartanburg County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000