Reidville, South Carolina Impact Fees

Reidville applies its own fee schedule. Spartanburg County does not currently add county-level impact fees inside city limits. A new single-family home pays $2,700.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Reidville Impact Fees by Project Type

Reidville: Single-Family Impact Fees

A new single-family home in Reidville pays $2,700.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap & System Improvement Fee (SJWD Water District) — 5/8" ($1,500.00).

Sewer Capacity Fee (Spartanburg Sanitary Sewer District) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Reidville Impact Fee Schedule
Water$1,500.00
  • Water Tap & System Improvement Fee (SJWD Water District) — 5/8"
    Startex-Jackson-Wellford-Duncan Water District
    Water in the Reidville area is provided by the SJWD Water District. A new 5/8-inch connection pays a one-time $1,000 meter and tap fee plus a $500 system improvement fee inside the district's tax district ($1,000 outside), for $1,500 in total.
    $1,500.00
Sewer$1,200.00
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District)
    Spartanburg Sanitary Sewer District
    Parts of the Reidville area are inside the Spartanburg Sanitary Sewer District's retail service area. Where sewer is available, the district charges a one-time capacity fee of $1,200 per residential equivalent unit (300 gallons per day) for a single-family connection, plus a $35 processing fee. Properties without sewer access use septic systems.
    $1,200.00Requires confirmation
City$0.00
County$0.00
Total (Reidville): $2,700.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reidville: Multifamily Impact Fees

A new multifamily unit in Reidville pays $2,400.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap & System Improvement Fee (SJWD Water District, MF) ($1,500.00).

Sewer Capacity Fee (Spartanburg Sanitary Sewer District, MF) — 2 BR is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Reidville Impact Fee Schedule
Water$1,500.00
  • Water Tap & System Improvement Fee (SJWD Water District, MF)
    Startex-Jackson-Wellford-Duncan Water District
    The SJWD Water District serves the Reidville area and has no separate multifamily rate: its one-time tap and system improvement fee is set per connection by meter size. A 5/8-inch connection is $1,500 ($1,000 tap plus $500 system improvement fee inside the district's tax district, $1,000 outside) and a 1-inch connection is $2,800, so a building on one connection pays once.
    $1,500.00
Sewer$900.00
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, MF) — 2 BR
    Spartanburg Sanitary Sewer District
    Parts of the Reidville area are inside the Spartanburg Sanitary Sewer District's retail service area. Where sewer is available, the district charges its one-time capacity fee per apartment by bedroom count: $600 for 1 bedroom, $900 for 2 bedrooms and $1,200 for 3 bedrooms, plus a $35 processing fee. Properties without sewer access use septic systems.
    $900.00Requires confirmation
City$0.00
County$0.00
Total (Reidville): $2,400.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reidville: Commercial Impact Fees

Commercial development in Reidville pays no per-square-foot impact fees, but owes $5,800.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $5,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter/Tap Fee (Startex-Jackson-Wellford-Duncan Water District) — 1" ($1,550.00 one-time) and Water System Improvement Fee (Startex-Jackson-Wellford-Duncan Water District, inside tax district) — 1" ($1,250.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Reidville Impact Fee Schedule
Water$2,800.00 one-time
Sewer$3,000.00 one-time
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"
    Spartanburg Sanitary Sewer District
    Parts of the Reidville area are inside the Spartanburg Sanitary Sewer District's retail service area. Where sewer is available, the district charges a nonresidential sewer capacity fee by meter size, effective September 1, 2022; properties without public sewer use septic systems. A $35 sewer application processing fee also applies.
    $3,000.00 one-timeRequires confirmation
County$0.00
Total (Reidville): $5,800.00 one-time (≈ $5,800.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reidville: Industrial Impact Fees

Industrial development in Reidville pays no per-square-foot impact fees, but owes $5,800.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $5,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter/Tap Fee (Startex-Jackson-Wellford-Duncan Water District) — 1" ($1,550.00 one-time) and Water System Improvement Fee (Startex-Jackson-Wellford-Duncan Water District, inside tax district) — 1" ($1,250.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Reidville Impact Fee Schedule
Water$2,800.00 one-time
Sewer$3,000.00 one-time
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"
    Spartanburg Sanitary Sewer District
    Parts of the Reidville area are inside the Spartanburg Sanitary Sewer District's retail service area. Where sewer is available, the district charges a nonresidential sewer capacity fee by meter size, effective September 1, 2022; properties without public sewer use septic systems. A $35 sewer application processing fee also applies.
    $3,000.00 one-timeRequires confirmation
County$0.00
Total (Reidville): $5,800.00 one-time (≈ $5,800.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reidville: Office Impact Fees

Office development in Reidville pays no per-square-foot impact fees, but owes $5,800.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $5,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter/Tap Fee (Startex-Jackson-Wellford-Duncan Water District) — 1" ($1,550.00 one-time) and Water System Improvement Fee (Startex-Jackson-Wellford-Duncan Water District, inside tax district) — 1" ($1,250.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1" is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Reidville Impact Fee Schedule
Water$2,800.00 one-time
Sewer$3,000.00 one-time
  • Sewer Capacity Fee (Spartanburg Sanitary Sewer District, nonresidential) — 1"
    Spartanburg Sanitary Sewer District
    Parts of the Reidville area are inside the Spartanburg Sanitary Sewer District's retail service area. Where sewer is available, the district charges a nonresidential sewer capacity fee by meter size, effective September 1, 2022; properties without public sewer use septic systems. A $35 sewer application processing fee also applies.
    $3,000.00 one-timeRequires confirmation
County$0.00
Total (Reidville): $5,800.00 one-time (≈ $5,800.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Spartanburg County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reidville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Reidville Impact Fee FAQs

What are the total impact fees for a single-family home in Reidville, South Carolina?

A new single-family home in Reidville pays $2,700.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Reidville?

Commercial development in Reidville pays no per-square-foot impact fees, but owes $5,800.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Reidville charge its own impact fees?

Yes. Reidville levies its own municipal impact or utility fees. Spartanburg County does not currently add county-level impact fees inside Reidville. The schedule on this page shows every fee that applies to development in Reidville.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Spartanburg County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000