Bastrop County Impact Fees by Project Type
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bastrop County: Single-Family Impact Fees
A new single-family home in unincorporated Bastrop County pays at least $8,970.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Bastrop County - Unincorporated) — Aqua WSC, $470 meter set + $8,400 SDF + $100 membership ($8,970.00).
Sewer Connection Fee (Bastrop County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bastrop County Impact Fee Schedule
- Water Connection Fee (Bastrop County - Unincorporated) — Aqua WSC, $470 meter set + $8,400 SDF + $100 membership$8,970.00Standard lotAqua Water Supply CorporationAqua Water Supply Corporation, the largest water provider in unincorporated Bastrop County, charges a $470 meter setting fee, a system development fee of $8,400 per living unit equivalent and a $100 membership fee for a standard 5/8-inch residential connection. The system development fee rises to $9,700 on June 1, 2027, $11,200 on June 1, 2028, $12,900 on June 1, 2029 and $14,900 on June 1, 2030. Line extensions and road crossings are billed at cost. Other areas are served by Bastrop County WCID 2, municipal utility districts, other utilities or private wells.
- Sewer Connection Fee (Bastrop County - Unincorporated)Requires confirmationThere is no county sewer utility in unincorporated Bastrop County; most development uses on-site septic systems permitted by the county. Where central sewer exists it is provided by private utilities, by Aqua Water Supply Corporation in parts of its sewer service area, or by municipal utility districts, each charging its own connection fees.
- City Impact Fee (Bastrop County - Unincorporated)$0.00No municipal impact fees apply in unincorporated areas.
- County Impact Fee (Bastrop County - Unincorporated)$0.00Bastrop CountyTexas counties cannot levy Chapter 395 impact fees; no county impact fee applies.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bastrop County: Multifamily Impact Fees
A new multifamily unit in unincorporated Bastrop County pays at least $8,970.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Bastrop County - Unincorporated, MF) — Aqua WSC, $470 meter set + $8,400 SDF + $100 membership ($8,970.00).
Sewer Connection Fee (Bastrop County - Unincorporated, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bastrop County Impact Fee Schedule
- Water Connection Fee (Bastrop County - Unincorporated, MF) — Aqua WSC, $470 meter set + $8,400 SDF + $100 membership$8,970.00Standard lotAqua Water Supply CorporationAqua Water Supply Corporation, the largest water provider in unincorporated Bastrop County, limits each meter to one dwelling, so each unit pays a standard 5/8-inch connection: a $470 meter setting fee, a system development fee of $8,400 per living unit equivalent and a $100 membership fee. One meter for a whole building requires a feasibility study and board approval. The system development fee rises to $9,700 on June 1, 2027, $11,200 on June 1, 2028, $12,900 on June 1, 2029 and $14,900 on June 1, 2030. Other areas are served by Bastrop County WCID 2, municipal utility districts, other utilities or private wells.
- Sewer Connection Fee (Bastrop County - Unincorporated, MF)Requires confirmationThere is no county sewer utility in unincorporated Bastrop County; most development uses on-site septic systems. Where central sewer exists it is provided by private utilities, by Aqua Water Supply Corporation in parts of its sewer service area, or by municipal utility districts, each charging its own connection fees.
- City Impact Fee (Bastrop County - Unincorporated, MF)$0.00No municipal impact fees apply in unincorporated areas.
- County Impact Fee (Bastrop County - Unincorporated, MF)$0.00Bastrop CountyTexas counties cannot levy Chapter 395 impact fees; no county impact fee applies.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bastrop County: Commercial Impact Fees
Commercial development in unincorporated Bastrop County pays no per-square-foot impact fees, but owes $8,400.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $8,400.00. The calculator below adjusts to your exact square footage.
The largest line items are Water System Development Fee — Aqua WSC, 1 LUE minimum ($8,400.00 one-time).
Sewer Connection Fee (Bastrop County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bastrop County Impact Fee Schedule
- Water System Development Fee — Aqua WSC, 1 LUE minimum$8,400.00 one-timeAqua Water Supply CorporationAqua Water Supply Corporation, the largest water provider in unincorporated Bastrop County, charges a system development fee of $8,400 per living unit equivalent (LUE), rising to $9,700 on June 1, 2027, $11,200 on June 1, 2028, $12,900 on June 1, 2029 and $14,900 on June 1, 2030. Nonresidential service is non-standard service: Aqua sizes the meter to the requested peak flow, converts that demand to an equivalent number of LUEs for the fee, and adds the actual meter cost, a $100 membership fee and a $100 customer service inspection fee. The amount shown is the one-LUE minimum. Other areas are served by Bastrop County WCID 2, municipal utility districts, other utilities or private wells.
- Sewer Connection Fee (Bastrop County - Unincorporated)Requires confirmationNone identified (fragmented private and district systems; on-site septic)There is no county sewer utility in unincorporated Bastrop County; most development uses on-site septic systems permitted by the county. Where central sewer exists it is provided by private utilities (several Utilities Inc. of Texas systems, Aqua Texas), by Aqua Water Supply Corporation in parts of its sewer service area, or by municipal utility districts, each charging its own connection fees.
- Municipal Impact Fee (Bastrop County - Unincorporated, Commercial)$0.00None (unincorporated area)No municipal impact fee applies in unincorporated Bastrop County; water and sewer connection charges are set by the utility or district serving the site.
- County Impact Fee (Bastrop County, Commercial)$0.00Bastrop CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Bastrop County charges no county impact fee on commercial, office or industrial development.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bastrop County: Industrial Impact Fees
Industrial development in unincorporated Bastrop County pays no per-square-foot impact fees, but owes $8,400.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $8,400.00. The calculator below adjusts to your exact square footage.
The largest line items are Water System Development Fee — Aqua WSC, 1 LUE minimum ($8,400.00 one-time).
Sewer Connection Fee (Bastrop County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bastrop County Impact Fee Schedule
- Water System Development Fee — Aqua WSC, 1 LUE minimum$8,400.00 one-timeAqua Water Supply CorporationAqua Water Supply Corporation, the largest water provider in unincorporated Bastrop County, charges a system development fee of $8,400 per living unit equivalent (LUE), rising to $9,700 on June 1, 2027, $11,200 on June 1, 2028, $12,900 on June 1, 2029 and $14,900 on June 1, 2030. Nonresidential service is non-standard service: Aqua sizes the meter to the requested peak flow, converts that demand to an equivalent number of LUEs for the fee, and adds the actual meter cost, a $100 membership fee and a $100 customer service inspection fee. The amount shown is the one-LUE minimum. Other areas are served by Bastrop County WCID 2, municipal utility districts, other utilities or private wells.
- Sewer Connection Fee (Bastrop County - Unincorporated)Requires confirmationNone identified (fragmented private and district systems; on-site septic)There is no county sewer utility in unincorporated Bastrop County; most development uses on-site septic systems permitted by the county. Where central sewer exists it is provided by private utilities (several Utilities Inc. of Texas systems, Aqua Texas), by Aqua Water Supply Corporation in parts of its sewer service area, or by municipal utility districts, each charging its own connection fees.
- Municipal Impact Fee (Bastrop County - Unincorporated, Industrial)$0.00None (unincorporated area)No municipal impact fee applies in unincorporated Bastrop County; water and sewer connection charges are set by the utility or district serving the site.
- County Impact Fee (Bastrop County, Industrial)$0.00Bastrop CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Bastrop County charges no county impact fee on commercial, office or industrial development.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bastrop County: Office Impact Fees
Office development in unincorporated Bastrop County pays no per-square-foot impact fees, but owes $8,400.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 25,000 sq ft building, that comes to at least $8,400.00. The calculator below adjusts to your exact square footage.
The largest line items are Water System Development Fee — Aqua WSC, 1 LUE minimum ($8,400.00 one-time).
Sewer Connection Fee (Bastrop County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bastrop County Impact Fee Schedule
- Water System Development Fee — Aqua WSC, 1 LUE minimum$8,400.00 one-timeAqua Water Supply CorporationAqua Water Supply Corporation, the largest water provider in unincorporated Bastrop County, charges a system development fee of $8,400 per living unit equivalent (LUE), rising to $9,700 on June 1, 2027, $11,200 on June 1, 2028, $12,900 on June 1, 2029 and $14,900 on June 1, 2030. Nonresidential service is non-standard service: Aqua sizes the meter to the requested peak flow, converts that demand to an equivalent number of LUEs for the fee, and adds the actual meter cost, a $100 membership fee and a $100 customer service inspection fee. The amount shown is the one-LUE minimum. Other areas are served by Bastrop County WCID 2, municipal utility districts, other utilities or private wells.
- Sewer Connection Fee (Bastrop County - Unincorporated)Requires confirmationNone identified (fragmented private and district systems; on-site septic)There is no county sewer utility in unincorporated Bastrop County; most development uses on-site septic systems permitted by the county. Where central sewer exists it is provided by private utilities (several Utilities Inc. of Texas systems, Aqua Texas), by Aqua Water Supply Corporation in parts of its sewer service area, or by municipal utility districts, each charging its own connection fees.
- Municipal Impact Fee (Bastrop County - Unincorporated, Office)$0.00None (unincorporated area)No municipal impact fee applies in unincorporated Bastrop County; water and sewer connection charges are set by the utility or district serving the site.
- County Impact Fee (Bastrop County, Office)$0.00Bastrop CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Bastrop County charges no county impact fee on commercial, office or industrial development.
Bastrop County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bastrop County Impact Fee FAQs
What are single-family impact fees in Bastrop County, Texas?
A new single-family home in unincorporated Bastrop County pays at least $8,970.00 per unit in impact fees (rates sourced November 16, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Bastrop County?
Multifamily development in unincorporated Bastrop County pays at least $8,970.00 per unit in impact fees (rates sourced November 16, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Bastrop County?
Commercial development in unincorporated Bastrop County pays no per-square-foot impact fees, but owes $8,400.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Do cities in Bastrop County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 3 of 3 cities in Bastrop County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.