Elgin Impact Fees by Project Type
Elgin: Single-Family Impact Fees
A new single-family home in Elgin pays $16,100.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Elgin) ($5,850.00), Water Impact Fee (City of Elgin) ($5,100.00) and Water Tap Fee (City of Elgin) ($2,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Elgin Impact Fee Schedule
- Water Impact Fee (City of Elgin)$5,100.00City of ElginWater impact fee of $5,100 per living unit equivalent, charged since July 3, 2024; a single-family home is 1.0 living unit equivalent. Separate water tap and meter set fees also apply.
- Water Tap Fee (City of Elgin)$2,000.003/4"City of ElginWater tap fee of $2,000 for a 3/4-inch tap, effective October 1, 2026; add $500 if a street cut or bore is required. A separate meter set fee and the water impact fee also apply.
- Water Meter Set Fee (City of Elgin)$150.003/4"City of ElginWater meter set fee of $150 for a 3/4-inch meter, effective October 1, 2026, charged in addition to the water tap fee.
- Wastewater Impact Fee (City of Elgin)$5,850.00City of ElginWastewater impact fee of $5,850 per living unit equivalent, charged since July 3, 2024; a single-family home is 1.0 living unit equivalent. A separate sewer tap fee also applies.
- Wastewater Tap Fee (City of Elgin)$2,000.004"City of ElginSewer tap fee of $2,000 for a 4-inch tap, effective October 1, 2026; add $500 if a street cut or bore is required. The wastewater impact fee also applies.
- Parkland Dedication Fee-in-Lieu (City of Elgin)$1,000.00City of ElginParkland fee of $1,000 per residential lot, charged with the plat, effective October 1, 2026.
- County Impact Fee (Bastrop County)$0.00Bastrop CountyTexas counties cannot levy Chapter 395 impact fees; no county impact fee applies.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Elgin: Multifamily Impact Fees
A new multifamily unit in Elgin pays $10,525.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Elgin, MF) — 0.5 LUE × $5,850/LUE ($2,925.00), Water Impact Fee (City of Elgin, MF) — 0.5 LUE × $5,100/LUE ($2,550.00) and Wastewater Tap Fee (City of Elgin, MF) ($2,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Elgin Impact Fee Schedule
- Water Impact Fee (City of Elgin, MF) — 0.5 LUE × $5,100/LUE$2,550.00MultifamilyCity of ElginWater impact fee of $5,100 per living unit equivalent, charged since July 3, 2024; each multifamily unit counts as 0.5 living unit equivalent. Units in three- and fourplexes count as 0.7 and duplex units as 0.9. Separate water tap and meter set fees also apply.
- Water Tap Fee (City of Elgin, MF)$2,000.003/4"City of ElginWater tap fee of $2,000 for a 3/4-inch tap, effective October 1, 2026, rising with size; taps over 2 inches are billed at cost plus 10%. Add $500 if a street cut or bore is required. A separate meter set fee also applies.
- Water Meter Set Fee (City of Elgin, MF)$150.003/4"City of ElginWater meter set fee of $150 for a 3/4-inch meter, effective October 1, 2026, rising with meter size; charged in addition to the water tap fee.
- Wastewater Impact Fee (City of Elgin, MF) — 0.5 LUE × $5,850/LUE$2,925.00MultifamilyCity of ElginWastewater impact fee of $5,850 per living unit equivalent, charged since July 3, 2024; each multifamily unit counts as 0.5 living unit equivalent. Units in three- and fourplexes count as 0.7 and duplex units as 0.9. A separate sewer tap fee also applies.
- Wastewater Tap Fee (City of Elgin, MF)$2,000.00City of ElginSewer tap fee of $2,000 for a 4-inch tap, effective October 1, 2026; a 6-inch tap is $2,500, an 8-inch tap $3,000, and larger taps cost plus 10%. Add $500 if a street cut or bore is required.
- Parkland Dedication Fee-in-Lieu (City of Elgin, MF)$900.00City of ElginParkland fee of $900 per dwelling unit, charged with the site development plan, effective October 1, 2026.
- County Impact Fee (Bastrop County, MF)$0.00Bastrop CountyTexas counties cannot levy Chapter 395 impact fees; no county impact fee applies.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Elgin: Commercial Impact Fees
Commercial development in Elgin pays no per-square-foot impact fees, but owes $17,840.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $17,840.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,850/LUE ($7,020.00 one-time), Water Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,100/LUE ($6,120.00 one-time) and Water Tap Fee (City of Elgin) — 1" ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Elgin, Commercial) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Elgin Impact Fee Schedule
- Water Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,100/LUE$6,120.00 one-timeCity of ElginWater impact fee for a 1-inch meter: 1.2 living unit equivalents (LUE) at $5,100 each (Ordinance 2024-07-02-11, charged from July 3, 2024). Larger meters pay more LUEs (1.5-inch 2.4, 2-inch 3.8, up to 35.8 for an 8-inch meter). A separate water tap fee and meter set fee also apply.
- Water Tap Fee (City of Elgin) — 1"$2,500.00 one-timeCity of ElginWater tap fee for a 1-inch tap (City of Elgin Master Fee Schedule, effective October 1, 2026). Taps larger than 2 inches are charged at labor, equipment and materials cost plus 10%. Add $500 if a street cut or bore is needed; a meter set fee and the water impact fee also apply.
- Water Meter Set Fee (City of Elgin) — 1"$200.00 one-timeCity of ElginMeter set fee for a 1-inch meter, charged in addition to the water tap fee (City of Elgin Master Fee Schedule, effective October 1, 2026). Meters larger than 2 inches are set at cost plus 10%.
- Wastewater Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,850/LUE$7,020.00 one-timeCity of ElginWastewater impact fee for a 1-inch water meter: 1.2 living unit equivalents (LUE) at $5,850 each (Ordinance 2024-07-02-11, charged from July 3, 2024). Larger meters pay more LUEs (1.5-inch 2.4, 2-inch 3.8, up to 35.8 for an 8-inch meter). A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Elgin) — 4"$2,000.00 one-timeCity of ElginSewer tap fee for a 4-inch tap (City of Elgin Master Fee Schedule, effective October 1, 2026). Taps larger than 8 inches are charged at cost plus 10%. Add $500 if a street cut or bore is needed; the wastewater impact fee also applies.
- Parkland Fee (City of Elgin, Commercial) — per acreContact jurisdiction/utility to verifyCity of ElginElgin charges a parkland fee of $5,000 per acre for commercial and industrial lots when the property is platted (City of Elgin Master Fee Schedule, effective October 1, 2026). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Bastrop County, Commercial)$0.00Bastrop CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Elgin.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Elgin: Industrial Impact Fees
Industrial development in Elgin pays no per-square-foot impact fees, but owes $17,840.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $17,840.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,850/LUE ($7,020.00 one-time), Water Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,100/LUE ($6,120.00 one-time) and Water Tap Fee (City of Elgin) — 1" ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Elgin, Industrial) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Elgin Impact Fee Schedule
- Water Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,100/LUE$6,120.00 one-timeCity of ElginWater impact fee for a 1-inch meter: 1.2 living unit equivalents (LUE) at $5,100 each (Ordinance 2024-07-02-11, charged from July 3, 2024). Larger meters pay more LUEs (1.5-inch 2.4, 2-inch 3.8, up to 35.8 for an 8-inch meter). A separate water tap fee and meter set fee also apply.
- Water Tap Fee (City of Elgin) — 1"$2,500.00 one-timeCity of ElginWater tap fee for a 1-inch tap (City of Elgin Master Fee Schedule, effective October 1, 2026). Taps larger than 2 inches are charged at labor, equipment and materials cost plus 10%. Add $500 if a street cut or bore is needed; a meter set fee and the water impact fee also apply.
- Water Meter Set Fee (City of Elgin) — 1"$200.00 one-timeCity of ElginMeter set fee for a 1-inch meter, charged in addition to the water tap fee (City of Elgin Master Fee Schedule, effective October 1, 2026). Meters larger than 2 inches are set at cost plus 10%.
- Wastewater Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,850/LUE$7,020.00 one-timeCity of ElginWastewater impact fee for a 1-inch water meter: 1.2 living unit equivalents (LUE) at $5,850 each (Ordinance 2024-07-02-11, charged from July 3, 2024). Larger meters pay more LUEs (1.5-inch 2.4, 2-inch 3.8, up to 35.8 for an 8-inch meter). A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Elgin) — 4"$2,000.00 one-timeCity of ElginSewer tap fee for a 4-inch tap (City of Elgin Master Fee Schedule, effective October 1, 2026). Taps larger than 8 inches are charged at cost plus 10%. Add $500 if a street cut or bore is needed; the wastewater impact fee also applies.
- Parkland Fee (City of Elgin, Industrial) — per acreContact jurisdiction/utility to verifyCity of ElginElgin charges a parkland fee of $5,000 per acre for commercial and industrial lots when the property is platted (City of Elgin Master Fee Schedule, effective October 1, 2026). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Bastrop County, Industrial)$0.00Bastrop CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Elgin.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Elgin: Office Impact Fees
Office development in Elgin pays no per-square-foot impact fees, but owes $17,840.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 25,000 sq ft building, that comes to at least $17,840.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,850/LUE ($7,020.00 one-time), Water Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,100/LUE ($6,120.00 one-time) and Water Tap Fee (City of Elgin) — 1" ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Elgin, Office) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Elgin Impact Fee Schedule
- Water Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,100/LUE$6,120.00 one-timeCity of ElginWater impact fee for a 1-inch meter: 1.2 living unit equivalents (LUE) at $5,100 each (Ordinance 2024-07-02-11, charged from July 3, 2024). Larger meters pay more LUEs (1.5-inch 2.4, 2-inch 3.8, up to 35.8 for an 8-inch meter). A separate water tap fee and meter set fee also apply.
- Water Tap Fee (City of Elgin) — 1"$2,500.00 one-timeCity of ElginWater tap fee for a 1-inch tap (City of Elgin Master Fee Schedule, effective October 1, 2026). Taps larger than 2 inches are charged at labor, equipment and materials cost plus 10%. Add $500 if a street cut or bore is needed; a meter set fee and the water impact fee also apply.
- Water Meter Set Fee (City of Elgin) — 1"$200.00 one-timeCity of ElginMeter set fee for a 1-inch meter, charged in addition to the water tap fee (City of Elgin Master Fee Schedule, effective October 1, 2026). Meters larger than 2 inches are set at cost plus 10%.
- Wastewater Impact Fee (City of Elgin) — 1" meter, 1.2 LUE × $5,850/LUE$7,020.00 one-timeCity of ElginWastewater impact fee for a 1-inch water meter: 1.2 living unit equivalents (LUE) at $5,850 each (Ordinance 2024-07-02-11, charged from July 3, 2024). Larger meters pay more LUEs (1.5-inch 2.4, 2-inch 3.8, up to 35.8 for an 8-inch meter). A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Elgin) — 4"$2,000.00 one-timeCity of ElginSewer tap fee for a 4-inch tap (City of Elgin Master Fee Schedule, effective October 1, 2026). Taps larger than 8 inches are charged at cost plus 10%. Add $500 if a street cut or bore is needed; the wastewater impact fee also applies.
- Parkland Fee (City of Elgin, Office) — per acreContact jurisdiction/utility to verifyCity of ElginElgin charges a parkland fee of $5,000 per acre for commercial and industrial lots when the property is platted (City of Elgin Master Fee Schedule, effective October 1, 2026); office lots are commercial lots. It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Bastrop County, Office)$0.00Bastrop CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Elgin.
Where in Bastrop County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Elgin Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Elgin Impact Fee FAQs
What are the total impact fees for a single-family home in Elgin, Texas?
A new single-family home in Elgin pays $16,100.00 per unit in combined impact fees (rates sourced November 16, 2026).
How much are commercial impact fees in Elgin?
Commercial development in Elgin pays no per-square-foot impact fees, but owes $17,840.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Elgin charge its own impact fees?
Yes. Elgin levies its own municipal impact or utility fees. Bastrop County does not currently add county-level impact fees inside Elgin. The schedule on this page shows every fee that applies to development in Elgin.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bastrop County impact fees page.