Skip to content
IMPACTFEES.ORG

Smithville, Texas Impact Fees

Smithville applies its own fee schedule. Bastrop County does not currently add county-level impact fees inside city limits. A new single-family home pays $7,500.00 per unit (rates sourced ). The full breakdown is below.

Smithville Impact Fees by Project Type

Smithville: Single-Family Impact Fees

A new single-family home in Smithville pays $7,500.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Tap Fee (City of Smithville) ($4,500.00) and Water Tap Fee (City of Smithville) ($3,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Smithville Impact Fee Schedule
Water$3,000.00
  • Water Tap Fee (City of Smithville)
    3/4"
    City of Smithville
    Water tap fee of $3,000 for a 3/4-inch tap, set by city council resolution and in effect from October 1, 2026; larger taps cost more and taps over 2 inches are billed at cost plus 25%.
    $3,000.00
Sewer$4,500.00
  • Wastewater Tap Fee (City of Smithville)
    4"
    City of Smithville
    Sewer tap fee of $4,500 for a 4-inch tap, set by city council resolution and in effect from October 1, 2026; 6-inch and 8-inch taps cost more.
    $4,500.00
City$0.00
  • City Impact Fee (City of Smithville)
    City of Smithville
    The city does not levy an impact fee or a parkland dedication fee; an impact fee advisory committee has been appointed to study one.
    $0.00
County$0.00
Total (Smithville): $7,500.00
Sources last checked Official fee schedules:City of Smithville Bastrop County

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Smithville: Multifamily Impact Fees

A new multifamily unit in Smithville pays $7,500.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Tap Fee (City of Smithville, MF) ($4,500.00) and Water Tap Fee (City of Smithville, MF) ($3,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Smithville Impact Fee Schedule
Water$3,000.00
  • Water Tap Fee (City of Smithville, MF)
    3/4"
    City of Smithville
    Water tap fee of $3,000 for a 3/4-inch tap, set by city council resolution and in effect from October 1, 2026, charged per tap; a building on one larger tap pays that size once (2-inch $5,500, larger at cost plus 25%).
    $3,000.00
Sewer$4,500.00
  • Wastewater Tap Fee (City of Smithville, MF)
    City of Smithville
    Sewer tap fee of $4,500 for a 4-inch tap, set by city council resolution and in effect from October 1, 2026; a 6-inch tap is $5,000 and an 8-inch tap $6,500, paid once per tap.
    $4,500.00
City$0.00
County$0.00
Total (Smithville): $7,500.00
Sources last checked Official fee schedules:City of Smithville Bastrop County

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Smithville: Commercial Impact Fees

Commercial development in Smithville pays no per-square-foot impact fees, but owes $8,000.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to about $8,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Smithville) — 4" ($4,500.00 one-time) and Water Tap Fee (City of Smithville) — 1" ($3,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Smithville Impact Fee Schedule
Water$3,500.00 one-time
  • Water Tap Fee (City of Smithville) — 1"
    City of Smithville
    Water tap fee for a 1-inch tap (City of Smithville fee schedule, Resolution 2026-09-586, effective October 1, 2026). Taps larger than 2 inches are charged at cost plus 25%. The same tap fees apply to residential and commercial service.
    $3,500.00 one-time
Sewer$4,500.00 one-time
City$0.00
  • City Impact Fee (City of Smithville, Commercial)
    City of Smithville
    The City of Smithville has not adopted a municipal impact fee. The city formed an impact fee advisory committee in 2025 and 2026 to prepare one, so a future water, wastewater or roadway impact fee is possible. Commercial development pays the city's water and sewer tap fees.
    $0.00
County$0.00
Total (Smithville): $8,000.00 one-time (≈ $8,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Smithville Bastrop County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Smithville: Industrial Impact Fees

Industrial development in Smithville pays no per-square-foot impact fees, but owes $8,000.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to about $8,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Smithville) — 4" ($4,500.00 one-time) and Water Tap Fee (City of Smithville) — 1" ($3,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Smithville Impact Fee Schedule
Water$3,500.00 one-time
  • Water Tap Fee (City of Smithville) — 1"
    City of Smithville
    Water tap fee for a 1-inch tap (City of Smithville fee schedule, Resolution 2026-09-586, effective October 1, 2026). Taps larger than 2 inches are charged at cost plus 25%. The same tap fees apply to residential and commercial service.
    $3,500.00 one-time
Sewer$4,500.00 one-time
City$0.00
  • City Impact Fee (City of Smithville, Industrial)
    City of Smithville
    The City of Smithville has not adopted a municipal impact fee. The city formed an impact fee advisory committee in 2025 and 2026 to prepare one, so a future water, wastewater or roadway impact fee is possible. Industrial development pays the city's water and sewer tap fees.
    $0.00
County$0.00
Total (Smithville): $8,000.00 one-time (≈ $8,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Smithville Bastrop County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Smithville: Office Impact Fees

Office development in Smithville pays no per-square-foot impact fees, but owes $8,000.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 25,000 sq ft building, that comes to about $8,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Smithville) — 4" ($4,500.00 one-time) and Water Tap Fee (City of Smithville) — 1" ($3,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Smithville Impact Fee Schedule
Water$3,500.00 one-time
  • Water Tap Fee (City of Smithville) — 1"
    City of Smithville
    Water tap fee for a 1-inch tap (City of Smithville fee schedule, Resolution 2026-09-586, effective October 1, 2026). Taps larger than 2 inches are charged at cost plus 25%. The same tap fees apply to residential and commercial service.
    $3,500.00 one-time
Sewer$4,500.00 one-time
City$0.00
  • City Impact Fee (City of Smithville, Office)
    City of Smithville
    The City of Smithville has not adopted a municipal impact fee. The city formed an impact fee advisory committee in 2025 and 2026 to prepare one, so a future water, wastewater or roadway impact fee is possible. Office development pays the city's water and sewer tap fees.
    $0.00
County$0.00
  • County Impact Fee (Bastrop County, Office)
    Bastrop County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Smithville.
    $0.00
Total (Smithville): $8,000.00 one-time (≈ $8,000.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Smithville Bastrop County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Smithville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Smithville Impact Fee FAQs

What are the total impact fees for a single-family home in Smithville, Texas?

A new single-family home in Smithville pays $7,500.00 per unit in combined impact fees (rates sourced November 16, 2026).

How much are commercial impact fees in Smithville?

Commercial development in Smithville pays no per-square-foot impact fees, but owes $8,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Smithville charge its own impact fees?

Yes. Smithville levies its own municipal impact or utility fees. Bastrop County does not currently add county-level impact fees inside Smithville. The schedule on this page shows every fee that applies to development in Smithville.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bastrop County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.