Bastrop, Texas Impact Fees

Bastrop applies its own fee schedule. Bastrop County does not currently add county-level impact fees inside city limits. A new single-family home pays $25,754.67 per unit (rates sourced ). The full breakdown is below.

Bastrop Impact Fees by Project Type

Bastrop: Single-Family Impact Fees

A new single-family home in Bastrop pays $25,754.67 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Bastrop) — 5/8" x 3/4" simple, 1 SU × $8,625/SU ($8,625.00), Water Impact Fee (City of Bastrop) — 5/8" x 3/4" simple, 1 SU × $8,182/SU ($8,182.00) and Roadway Impact Fee (City of Bastrop) — Service Area A ($7,347.67).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bastrop Impact Fee Schedule
Water$8,482.00
  • Water Impact Fee (City of Bastrop) — 5/8" x 3/4" simple, 1 SU × $8,182/SU
    City of Bastrop
    Water impact fee of $8,182 per service unit (production $1,347 plus distribution $6,835), effective March 11, 2025. A standard 5/8-inch by 3/4-inch meter is 1 service unit; larger meters pay more service units. A separate water tap fee also applies.
    $8,182.00
  • Water Tap Fee (City of Bastrop)
    3/4"
    City of Bastrop
    Water tap fee of $300 for a 3/4-inch connection inside the city ($400 outside the city limits); larger connections cost more, and connections over 4 inches are billed at cost plus 25%. Charged in addition to the water impact fee.
    $300.00
Sewer$8,925.00
City$8,347.67
  • Roadway Impact Fee (City of Bastrop) — Service Area A
    City of Bastrop
    Roadway impact fee, Service Area A, the higher of the city's two service areas. For a single-family home about $7,348 for plats recorded from December 13, 2025, rising to about $7,481 for plats recorded on or after December 13, 2026. Subdivisions of 4 or fewer homes are exempt and accessory dwelling units are fully reduced.
    $7,347.67
  • Park Enrichment Fee (City of Bastrop)
    City of Bastrop
    Park enrichment fee of $500 per home, paid at or before filing the plat for recordation, in addition to the parkland dedication requirement. A developer may instead build city-approved park improvements of 2 acres or more.
    $500.00
  • Parkland Dedication Fee-in-Lieu (City of Bastrop)
    City of Bastrop
    Parkland dedication fee in lieu of land of $500 per home, paid when the plat is filed (before recordation) for subdivisions too small to dedicate the 3-acre minimum park. Minor plats and amending plats that add no lots are exempt. A separate $500 park enrichment fee also applies.
    $500.00
County$0.00
Total (Bastrop): $25,754.67
Sources last checked Official fee schedules:City of Bastrop Bastrop County

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bastrop: Multifamily Impact Fees

A new multifamily unit in Bastrop pays $21,341.91 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Bastrop, MF) — 5/8" x 3/4" simple, 1 SU × $8,625/SU ($8,625.00), Water Impact Fee (City of Bastrop, MF) — 5/8" x 3/4" simple, 1 SU × $8,182/SU ($8,182.00) and Roadway Impact Fee (City of Bastrop, MF) — Service Area A ($3,034.91).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bastrop Impact Fee Schedule
Water$8,482.00
  • Water Impact Fee (City of Bastrop, MF) — 5/8" x 3/4" simple, 1 SU × $8,182/SU
    City of Bastrop
    Water impact fee of $8,182 per service unit, effective March 11, 2025, charged by meter size: a 5/8-inch by 3/4-inch meter is 1 service unit, and a building served by one larger master meter pays that meter's multiple (for example 8 service units for a 2-inch meter, 16 to 24 for a 3-inch meter). A separate water tap fee also applies.
    $8,182.00
  • Water Tap Fee (City of Bastrop, MF)
    3/4"
    City of Bastrop
    Water tap fee of $300 for a 3/4-inch connection inside the city ($400 outside), rising with size; a 3-inch tap is $2,450, a 4-inch tap $3,450, and larger connections are billed at cost plus 25%. Charged in addition to the water impact fee.
    $300.00
Sewer$8,925.00
  • Wastewater Impact Fee (City of Bastrop, MF) — 5/8" x 3/4" simple, 1 SU × $8,625/SU
    City of Bastrop
    Wastewater impact fee of $8,625 per service unit, effective March 11, 2025, charged by meter size: a 5/8-inch by 3/4-inch meter is 1 service unit, and a building served by one larger master meter pays that meter's multiple. A separate wastewater tap fee also applies.
    $8,625.00
  • Wastewater Tap Fee (City of Bastrop, MF)
    City of Bastrop
    Wastewater tap fee of $300 for a 4-inch connection; 6-inch and larger connections, common for multifamily buildings, are billed at cost plus 25%. Charged in addition to the wastewater impact fee.
    $300.00
City$3,934.91
  • Roadway Impact Fee (City of Bastrop, MF) — Service Area A
    City of Bastrop
    Roadway impact fee, Service Area A, the higher of the city's two service areas: about $3,035 per mid-rise multifamily unit for plats recorded from December 13, 2025, rising to about $3,090 for plats recorded on or after December 13, 2026. Low-rise units pay more and high-rise units less, per their trip rates.
    $3,034.91
  • Park Enrichment Fee (City of Bastrop, MF)
    City of Bastrop
    Park enrichment fee of $500 per unit, paid at or before filing the plat for recordation, in addition to the parkland dedication requirement. A developer may instead build city-approved park improvements of 2 acres or more.
    $500.00
  • Parkland Dedication Fee-in-Lieu (City of Bastrop, MF) — 4 or more units per building
    City of Bastrop
    Parkland dedication fee in lieu of land of $400 per unit in buildings with 4 or more units ($500 in smaller buildings), paid when the plat is filed for developments too small to dedicate the 3-acre minimum park. A separate $500 park enrichment fee also applies.
    $400.00
County$0.00
Total (Bastrop): $21,341.91
Sources last checked Official fee schedules:City of Bastrop Bastrop County

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bastrop: Commercial Impact Fees

Commercial development in Bastrop pays $18.13 per square foot in impact fees, plus $42,717.50 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to about $949,196.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,625/SU ($21,562.50 one-time), Water Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,182/SU ($20,455.00 one-time) and Water Connection and Tapping Fee (City of Bastrop) — 1" ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Bastrop Impact Fee Schedule
Water$20,855.00 one-time
  • Water Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,182/SU
    City of Bastrop
    Water impact fee for a 1-inch meter: 2.5 service units at $8,182 each (Ordinance 2025-08, effective March 11, 2025). Larger meters pay more service units (1.5-inch 5, 2-inch 8, up to 330 for a 12-inch turbine meter). Paid before the tap or building permit is issued; a separate water tap fee also applies.
    $20,455.00 one-time
  • Water Connection and Tapping Fee (City of Bastrop) — 1"
    City of Bastrop
    Water connection and tapping fee for a 1-inch meter inside city limits ($500 outside city limits), per the City of Bastrop Master Fee Schedule (updated April 28, 2026). Connections larger than 4 inches and nonroutine connections are billed at actual cost plus 25%. Charged in addition to the water impact fee.
    $400.00 one-time
Sewer$21,862.50 one-time
  • Wastewater Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,625/SU
    City of Bastrop
    Wastewater impact fee for a 1-inch water meter: 2.5 service units at $8,625 each (Ordinance 2025-08, effective March 11, 2025). Larger meters pay more service units (1.5-inch 5, 2-inch 8, up to 330 for a 12-inch turbine meter). Paid before the tap or building permit is issued; a separate wastewater tap fee also applies.
    $21,562.50 one-time
  • Sewer Connection and Tapping Fee (City of Bastrop)
    City of Bastrop
    Sewer connection and tapping fee for a 4-inch connection, per the City of Bastrop Master Fee Schedule (updated April 28, 2026). Connections of 6 inches or larger are charged at cost plus 25%. Charged in addition to the wastewater impact fee.
    $300.00 one-time
City$18.13/sq ft
  • Roadway Impact Fee (City of Bastrop, Commercial) — $1,996.65/veh-mi × 9.08 veh-mi per 1,000 sf
    Service Area A
    City of Bastrop
    Roadway impact fee for retail (shopping center 40,000 to 150,000 sq ft, 9.08 vehicle-miles per 1,000 sq ft), Service Area A, the higher of the city's two roadway service areas. About $18,130 per 1,000 sq ft for plats recorded from December 13, 2025, rising to about $18,460 per 1,000 sq ft for plats on or after December 13, 2026. Assessed at plat approval and paid at building permit.
    $18.13/sq ft
County$0.00
Total (Bastrop): $18.13/sq ft + $42,717.50 one-time (≈ $949,196.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bastrop Bastrop County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bastrop: Industrial Impact Fees

Industrial development in Bastrop pays $7.79 per square foot in impact fees, plus $42,717.50 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to about $432,064.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,625/SU ($21,562.50 one-time), Water Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,182/SU ($20,455.00 one-time) and Water Connection and Tapping Fee (City of Bastrop) — 1" ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Bastrop Impact Fee Schedule
Water$20,855.00 one-time
  • Water Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,182/SU
    City of Bastrop
    Water impact fee for a 1-inch meter: 2.5 service units at $8,182 each (Ordinance 2025-08, effective March 11, 2025). Larger meters pay more service units (1.5-inch 5, 2-inch 8, up to 330 for a 12-inch turbine meter). Paid before the tap or building permit is issued; a separate water tap fee also applies.
    $20,455.00 one-time
  • Water Connection and Tapping Fee (City of Bastrop) — 1"
    City of Bastrop
    Water connection and tapping fee for a 1-inch meter inside city limits ($500 outside city limits), per the City of Bastrop Master Fee Schedule (updated April 28, 2026). Connections larger than 4 inches and nonroutine connections are billed at actual cost plus 25%. Charged in addition to the water impact fee.
    $400.00 one-time
Sewer$21,862.50 one-time
  • Wastewater Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,625/SU
    City of Bastrop
    Wastewater impact fee for a 1-inch water meter: 2.5 service units at $8,625 each (Ordinance 2025-08, effective March 11, 2025). Larger meters pay more service units (1.5-inch 5, 2-inch 8, up to 330 for a 12-inch turbine meter). Paid before the tap or building permit is issued; a separate wastewater tap fee also applies.
    $21,562.50 one-time
  • Sewer Connection and Tapping Fee (City of Bastrop)
    City of Bastrop
    Sewer connection and tapping fee for a 4-inch connection, per the City of Bastrop Master Fee Schedule (updated April 28, 2026). Connections of 6 inches or larger are charged at cost plus 25%. Charged in addition to the wastewater impact fee.
    $300.00 one-time
City$7.79/sq ft
  • Roadway Impact Fee (City of Bastrop, Industrial) — $1,996.65/veh-mi × 3.90 veh-mi per 1,000 sf
    Service Area A
    City of Bastrop
    Roadway impact fee for general light industrial (3.90 vehicle-miles per 1,000 sq ft), Service Area A, the higher of the city's two roadway service areas. About $7,787 per 1,000 sq ft for plats recorded from December 13, 2025, rising to about $7,929 per 1,000 sq ft for plats on or after December 13, 2026. Assessed at plat approval and paid at building permit.
    $7.79/sq ft
County$0.00
Total (Bastrop): $7.79/sq ft + $42,717.50 one-time (≈ $432,064.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bastrop Bastrop County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bastrop: Office Impact Fees

Office development in Bastrop pays $10.12 per square foot in impact fees, plus $42,717.50 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 25,000 sq ft building, that comes to about $295,793.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,625/SU ($21,562.50 one-time), Water Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,182/SU ($20,455.00 one-time) and Water Connection and Tapping Fee (City of Bastrop) — 1" ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Bastrop Impact Fee Schedule
Water$20,855.00 one-time
  • Water Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,182/SU
    City of Bastrop
    Water impact fee for a 1-inch meter: 2.5 service units at $8,182 each (Ordinance 2025-08, effective March 11, 2025). Larger meters pay more service units (1.5-inch 5, 2-inch 8, up to 330 for a 12-inch turbine meter). Paid before the tap or building permit is issued; a separate water tap fee also applies.
    $20,455.00 one-time
  • Water Connection and Tapping Fee (City of Bastrop) — 1"
    City of Bastrop
    Water connection and tapping fee for a 1-inch meter inside city limits ($500 outside city limits), per the City of Bastrop Master Fee Schedule (updated April 28, 2026). Connections larger than 4 inches and nonroutine connections are billed at actual cost plus 25%. Charged in addition to the water impact fee.
    $400.00 one-time
Sewer$21,862.50 one-time
  • Wastewater Impact Fee (City of Bastrop) — 1" meter, 2.5 SU × $8,625/SU
    City of Bastrop
    Wastewater impact fee for a 1-inch water meter: 2.5 service units at $8,625 each (Ordinance 2025-08, effective March 11, 2025). Larger meters pay more service units (1.5-inch 5, 2-inch 8, up to 330 for a 12-inch turbine meter). Paid before the tap or building permit is issued; a separate wastewater tap fee also applies.
    $21,562.50 one-time
  • Sewer Connection and Tapping Fee (City of Bastrop)
    City of Bastrop
    Sewer connection and tapping fee for a 4-inch connection, per the City of Bastrop Master Fee Schedule (updated April 28, 2026). Connections of 6 inches or larger are charged at cost plus 25%. Charged in addition to the wastewater impact fee.
    $300.00 one-time
City$10.12/sq ft
  • Roadway Impact Fee (City of Bastrop, Office) — $1,996.65/veh-mi × 5.07 veh-mi per 1,000 sf
    Service Area A
    City of Bastrop
    Roadway impact fee for general office (5.07 vehicle-miles per 1,000 sq ft), Service Area A, the higher of the city's two roadway service areas. About $10,123 per 1,000 sq ft for plats recorded from December 13, 2025, rising to about $10,307 per 1,000 sq ft for plats on or after December 13, 2026. Assessed at plat approval and paid at building permit.
    $10.12/sq ft
County$0.00
  • County Impact Fee (Bastrop County, Office)
    Bastrop County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Bastrop.
    $0.00
Total (Bastrop): $10.12/sq ft + $42,717.50 one-time (≈ $295,793.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Bastrop Bastrop County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bastrop County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bastrop Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Bastrop Impact Fee FAQs

What are the total impact fees for a single-family home in Bastrop, Texas?

A new single-family home in Bastrop pays $25,754.67 per unit in combined impact fees (rates sourced November 16, 2026).

How much are commercial impact fees in Bastrop?

Commercial development in Bastrop pays $18.13 per square foot in impact fees, plus $42,717.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $949,196.50 for a 50,000 sq ft building.

Does Bastrop charge its own impact fees?

Yes. Bastrop levies its own municipal impact or utility fees. Bastrop County does not currently add county-level impact fees inside Bastrop. The schedule on this page shows every fee that applies to development in Bastrop.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bastrop County impact fees page.