Skip to content
IMPACTFEES.ORG

Needville, Texas Impact Fees

Needville applies its own fee schedule: municipal fees plus the Fort Bend County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $12,901.25 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Needville Impact Fees by Project Type

Needville: Single-Family Impact Fees

A new single-family home in Needville pays at least $12,901.25 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Needville) — 3/4" meter (1 SU) ($4,932.00), Water Impact Fee (City of Needville) — 3/4" meter (1 SU) ($3,963.00) and Water Tap Fee (City of Needville) — 3/4" tap ($1,675.00).

County Impact Fee (Fort Bend County) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Needville Impact Fee Schedule
Water$6,519.25
Sewer$6,382.00
City$0.00
County$0.00
  • County Impact Fee (Fort Bend County)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Needville): $12,901.25
Sources last checked Official fee schedules:City of Needville Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Needville: Multifamily Impact Fees

A new multifamily unit in Needville pays at least $12,901.25 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Needville, MF) — 3/4" meter (1 SU) ($4,932.00), Water Impact Fee (City of Needville, MF) — 3/4" meter (1 SU) ($3,963.00) and Water Tap Fee (City of Needville, MF) — 3/4" tap ($1,675.00).

County Impact Fee (Fort Bend County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Needville Impact Fee Schedule
Water$6,519.25
  • Water Impact Fee (City of Needville, MF) — 3/4" meter (1 SU)
    City of Needville
    Water impact fee charged by meter size, effective October 1, 2026 under Ordinance 26-15: 1 service unit for a 3/4 inch meter, 3 for 1 inch, 7 for 1 1/2 inch, 10 for 2 inch. A building on one master meter pays once at that meter's size.
    $3,963.00
  • Water Tap Fee (City of Needville, MF) — 3/4" tap
    City of Needville
    Water tap fee for a 3/4 inch tap, effective October 1, 2026, charged per connection: a building on one connection pays once. The water meter fee, sewer tap fee and impact fees are charged in addition.
    $1,675.00
  • Water Meter Fee (City of Needville, MF) — 5/8" meter
    City of Needville
    Water meter fee for a 5/8 inch meter, effective October 1, 2026, charged per meter in addition to the tap fee. A building on one master meter pays once at that meter's size.
    $881.25
Sewer$6,382.00
  • Wastewater Impact Fee (City of Needville, MF) — 3/4" meter (1 SU)
    City of Needville
    Wastewater impact fee charged by water meter size, effective October 1, 2026 under Ordinance 26-15: 1 service unit for a 3/4 inch meter, 3 for 1 inch, 7 for 1 1/2 inch, 10 for 2 inch. A building on one master meter pays once at that meter's size.
    $4,932.00
  • Sewer Tap Fee (City of Needville, MF)
    City of Needville
    One sewer tap fee per connection, effective October 1, 2026: a building on one connection pays once. Charged in addition to the wastewater impact fee.
    $1,450.00
City$0.00
County$0.00
  • County Impact Fee (Fort Bend County, MF)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Needville): $12,901.25
Sources last checked Official fee schedules:City of Needville Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Needville: Commercial Impact Fees

Commercial development in Needville pays no per-square-foot impact fees, but owes $31,104.25 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $31,104.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Needville) — 1" meter, 3 SU × $4,932/SU ($14,796.00 one-time), Water Impact Fee (City of Needville) — 1" meter, 3 SU × $3,963/SU ($11,889.00 one-time) and Water Tap Fee (City of Needville) — 1" tap ($1,950.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Impact Fees (Fort Bend County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Needville Impact Fee Schedule
Water$14,858.25 one-time
  • Water Impact Fee (City of Needville) — 1" meter, 3 SU × $3,963/SU
    City of Needville
    Needville's water impact fee is set by meter size under Ordinance 26-15, adopted September 21, 2026 and effective October 1, 2026: $3,963 per service unit, and a 1-inch meter counts as 3 service units. Tap and meter fees are charged in addition.
    $11,889.00 one-time
  • Water Tap Fee (City of Needville) — 1" tap
    City of Needville
    Needville water taps cost $1,675 (3/4 inch), $1,950 (1 inch) or $2,800 (2 inch), effective October 1, 2026; the water meter fee and impact fee are charged in addition.
    $1,950.00 one-time
  • Water Meter Fee (City of Needville) — 1" meter
    City of Needville
    Needville water meter fees, effective October 1, 2026: $881.25 (5/8 inch), $1,019.25 (1 inch), $2,051.25 (1 1/2 inch) and $2,252.20 (2 inch), charged in addition to the tap fee.
    $1,019.25 one-time
Sewer$16,246.00 one-time
  • Wastewater Impact Fee (City of Needville) — 1" meter, 3 SU × $4,932/SU
    City of Needville
    Needville's wastewater impact fee is set by water meter size under Ordinance 26-15, adopted September 21, 2026 and effective October 1, 2026: $4,932 per service unit, and a 1-inch meter counts as 3 service units. The sewer tap fee is charged in addition.
    $14,796.00 one-time
  • Sewer Tap Fee (City of Needville)
    City of Needville
    Needville charges one sewer tap fee of $1,450 for every connection, effective October 1, 2026, in addition to the wastewater impact fee.
    $1,450.00 one-time
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Commercial)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Needville): $31,104.25 one-time (≈ $31,104.25 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Needville Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Needville: Industrial Impact Fees

Industrial development in Needville pays no per-square-foot impact fees, but owes $31,104.25 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $31,104.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Needville) — 1" meter, 3 SU × $4,932/SU ($14,796.00 one-time), Water Impact Fee (City of Needville) — 1" meter, 3 SU × $3,963/SU ($11,889.00 one-time) and Water Tap Fee (City of Needville) — 1" tap ($1,950.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Impact Fees (Fort Bend County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Needville Impact Fee Schedule
Water$14,858.25 one-time
  • Water Impact Fee (City of Needville) — 1" meter, 3 SU × $3,963/SU
    City of Needville
    Needville's water impact fee is set by meter size under Ordinance 26-15, adopted September 21, 2026 and effective October 1, 2026: $3,963 per service unit, and a 1-inch meter counts as 3 service units. Tap and meter fees are charged in addition.
    $11,889.00 one-time
  • Water Tap Fee (City of Needville) — 1" tap
    City of Needville
    Needville water taps cost $1,675 (3/4 inch), $1,950 (1 inch) or $2,800 (2 inch), effective October 1, 2026; the water meter fee and impact fee are charged in addition.
    $1,950.00 one-time
  • Water Meter Fee (City of Needville) — 1" meter
    City of Needville
    Needville water meter fees, effective October 1, 2026: $881.25 (5/8 inch), $1,019.25 (1 inch), $2,051.25 (1 1/2 inch) and $2,252.20 (2 inch), charged in addition to the tap fee.
    $1,019.25 one-time
Sewer$16,246.00 one-time
  • Wastewater Impact Fee (City of Needville) — 1" meter, 3 SU × $4,932/SU
    City of Needville
    Needville's wastewater impact fee is set by water meter size under Ordinance 26-15, adopted September 21, 2026 and effective October 1, 2026: $4,932 per service unit, and a 1-inch meter counts as 3 service units. The sewer tap fee is charged in addition.
    $14,796.00 one-time
  • Sewer Tap Fee (City of Needville)
    City of Needville
    Needville charges one sewer tap fee of $1,450 for every connection, effective October 1, 2026, in addition to the wastewater impact fee.
    $1,450.00 one-time
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Industrial)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Needville): $31,104.25 one-time (≈ $31,104.25 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Needville Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Needville: Office Impact Fees

Office development in Needville pays no per-square-foot impact fees, but owes $31,104.25 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $31,104.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Needville) — 1" meter, 3 SU × $4,932/SU ($14,796.00 one-time), Water Impact Fee (City of Needville) — 1" meter, 3 SU × $3,963/SU ($11,889.00 one-time) and Water Tap Fee (City of Needville) — 1" tap ($1,950.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Impact Fees (Fort Bend County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Needville Impact Fee Schedule
Water$14,858.25 one-time
  • Water Impact Fee (City of Needville) — 1" meter, 3 SU × $3,963/SU
    City of Needville
    Needville's water impact fee is set by meter size under Ordinance 26-15, adopted September 21, 2026 and effective October 1, 2026: $3,963 per service unit, and a 1-inch meter counts as 3 service units. Tap and meter fees are charged in addition.
    $11,889.00 one-time
  • Water Tap Fee (City of Needville) — 1" tap
    City of Needville
    Needville water taps cost $1,675 (3/4 inch), $1,950 (1 inch) or $2,800 (2 inch), effective October 1, 2026; the water meter fee and impact fee are charged in addition.
    $1,950.00 one-time
  • Water Meter Fee (City of Needville) — 1" meter
    City of Needville
    Needville water meter fees, effective October 1, 2026: $881.25 (5/8 inch), $1,019.25 (1 inch), $2,051.25 (1 1/2 inch) and $2,252.20 (2 inch), charged in addition to the tap fee.
    $1,019.25 one-time
Sewer$16,246.00 one-time
  • Wastewater Impact Fee (City of Needville) — 1" meter, 3 SU × $4,932/SU
    City of Needville
    Needville's wastewater impact fee is set by water meter size under Ordinance 26-15, adopted September 21, 2026 and effective October 1, 2026: $4,932 per service unit, and a 1-inch meter counts as 3 service units. The sewer tap fee is charged in addition.
    $14,796.00 one-time
  • Sewer Tap Fee (City of Needville)
    City of Needville
    Needville charges one sewer tap fee of $1,450 for every connection, effective October 1, 2026, in addition to the wastewater impact fee.
    $1,450.00 one-time
City$0.00
  • City Impact Fees (City of Needville, Office)
    City of Needville
    Needville's impact fees are for water and wastewater only; it has no roadway or drainage impact fee, and Texas law allows no city park or public safety impact fees.
    $0.00
County$0.00
  • County Impact Fees (Fort Bend County, Office)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Needville): $31,104.25 one-time (≈ $31,104.25 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Needville Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Needville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Needville Impact Fee FAQs

What are the total impact fees for a single-family home in Needville, Texas?

A new single-family home in Needville pays at least $12,901.25 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Needville?

Commercial development in Needville pays no per-square-foot impact fees, but owes $31,104.25 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Needville charge its own impact fees?

Yes. Needville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Needville, with the combined total.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Fort Bend County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.