Skip to content
IMPACTFEES.ORG

Weston Lakes, Texas Impact Fees

Weston Lakes applies its own fee schedule: municipal fees plus the Fort Bend County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $2,300.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Weston Lakes Impact Fees by Project Type

Weston Lakes: Single-Family Impact Fees

A new single-family home in Weston Lakes pays at least $2,300.00 per unit in impact fees (rates sourced November 25, 2026). All of it is levied by Fort Bend County.

The largest line items are Water Tap Fee (Fort Bend County MUD No. 81) — 3/4" residential tap ($2,300.00).

County Impact Fee (Fort Bend County) is set by the county and has no published standard rate. City Development Fees (City of Weston Lakes) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Weston Lakes Impact Fee Schedule
Water$2,300.00
  • Water Tap Fee (Fort Bend County MUD No. 81) — 3/4" residential tap
    Fort Bend County MUD No. 81
    Fort Bend County MUD No. 81 serves Weston Lakes and charges $2,300 for a 3/4 inch residential water tap, including meter and box (rate order amended September 22, 2026). A 1 inch tap is $3,000; 2 inch and larger taps cost two times the actual cost plus $300.
    $2,300.00
Sewer$0.00
City$0.00
County$0.00
  • County Impact Fee (Fort Bend County)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Weston Lakes): $2,300.00
Sources last checked Official fee schedules:Fort Bend County MUD No. 81 Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Weston Lakes: Multifamily Impact Fees

A new multifamily unit in Weston Lakes pays at least $2,300.00 per unit in impact fees (rates sourced November 25, 2026). All of it is levied by Fort Bend County.

The largest line items are Water Tap Fee (Fort Bend County MUD No. 81, MF) — 3/4" residential tap ($2,300.00).

County Impact Fee (Fort Bend County, MF) is set by the county and has no published standard rate. City Development Fees (City of Weston Lakes, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Weston Lakes Impact Fee Schedule
Water$2,300.00
Sewer$0.00
City$0.00
County$0.00
  • County Impact Fee (Fort Bend County, MF)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Weston Lakes): $2,300.00
Sources last checked Official fee schedules:Fort Bend County MUD No. 81 Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Weston Lakes: Commercial Impact Fees

Commercial development in Weston Lakes pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $3,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (Fort Bend County MUD No. 81) — 1" tap including meter and box ($3,000.00 one-time).

County Impact Fees (Fort Bend County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Weston Lakes Impact Fee Schedule
Water$3,000.00 one-time
  • Water Tap Fee (Fort Bend County MUD No. 81) — 1" tap including meter and box
    Fort Bend County MUD No. 81
    Fort Bend County MUD No. 81 serves Weston Lakes and charges $3,000 for a 1-inch water tap including meter and box (rate order amended September 22, 2026). Taps of 2 inches and larger cost two times the actual cost plus $300. The City of Weston Lakes charges no water impact fee.
    $3,000.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Fort Bend County MUD No. 81)
    Fort Bend County MUD No. 81
    Sewer service in Weston Lakes is provided by Fort Bend County Municipal Utility District No. 81, whose rate order charges no sewer tap or capacity fee beyond inspection fees. The City of Weston Lakes charges no wastewater impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Commercial)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Weston Lakes): $3,000.00 one-time (≈ $3,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Fort Bend County MUD No. 81 City of Weston Lakes Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Weston Lakes: Industrial Impact Fees

Industrial development in Weston Lakes pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $3,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (Fort Bend County MUD No. 81) — 1" tap including meter and box ($3,000.00 one-time).

County Impact Fees (Fort Bend County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Weston Lakes Impact Fee Schedule
Water$3,000.00 one-time
  • Water Tap Fee (Fort Bend County MUD No. 81) — 1" tap including meter and box
    Fort Bend County MUD No. 81
    Fort Bend County MUD No. 81 serves Weston Lakes and charges $3,000 for a 1-inch water tap including meter and box (rate order amended September 22, 2026). Taps of 2 inches and larger cost two times the actual cost plus $300. The City of Weston Lakes charges no water impact fee.
    $3,000.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Fort Bend County MUD No. 81)
    Fort Bend County MUD No. 81
    Sewer service in Weston Lakes is provided by Fort Bend County Municipal Utility District No. 81, whose rate order charges no sewer tap or capacity fee beyond inspection fees. The City of Weston Lakes charges no wastewater impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Industrial)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Weston Lakes): $3,000.00 one-time (≈ $3,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Fort Bend County MUD No. 81 City of Weston Lakes Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Weston Lakes: Office Impact Fees

Office development in Weston Lakes pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $3,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (Fort Bend County MUD No. 81) — 1" tap including meter and box ($3,000.00 one-time).

County Impact Fees (Fort Bend County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Weston Lakes Impact Fee Schedule
Water$3,000.00 one-time
  • Water Tap Fee (Fort Bend County MUD No. 81) — 1" tap including meter and box
    Fort Bend County MUD No. 81
    Fort Bend County MUD No. 81 serves Weston Lakes and charges $3,000 for a 1-inch water tap including meter and box (rate order amended September 22, 2026). Taps of 2 inches and larger cost two times the actual cost plus $300. The City of Weston Lakes charges no water impact fee.
    $3,000.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Fort Bend County MUD No. 81)
    Fort Bend County MUD No. 81
    Sewer service in Weston Lakes is provided by Fort Bend County Municipal Utility District No. 81, whose rate order charges no sewer tap or capacity fee beyond inspection fees. The City of Weston Lakes charges no wastewater impact fee.
    $0.00
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Office)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Weston Lakes): $3,000.00 one-time (≈ $3,000.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Fort Bend County MUD No. 81 City of Weston Lakes Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Weston Lakes Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Weston Lakes Impact Fee FAQs

What are the total impact fees for a single-family home in Weston Lakes, Texas?

A new single-family home in Weston Lakes pays at least $2,300.00 per unit in combined impact fees (rates sourced November 25, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Weston Lakes?

Commercial development in Weston Lakes pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Weston Lakes charge its own impact fees?

Yes. Weston Lakes levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Weston Lakes, with the combined total.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Fort Bend County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.