Rosenberg, Texas Impact Fees

Rosenberg applies its own fee schedule: municipal fees plus the Fort Bend County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $6,493.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Rosenberg Impact Fees by Project Type

Rosenberg: Single-Family Impact Fees

A new single-family home in Rosenberg pays at least $6,493.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Rosenberg) — 5/8" x 3/4" meter ($2,693.00) and Wastewater Impact Fee (City of Rosenberg) — 5/8" x 3/4" meter ($2,100.00).

Park Land Dedication Fee in Lieu and Park Development Fee (City of Rosenberg) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Fort Bend County) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Rosenberg Impact Fee Schedule
Water$2,693.00
  • Water Impact Fee (City of Rosenberg) — 5/8" x 3/4" meter
    City of Rosenberg
    Water impact fee for a standard 5/8 x 3/4 inch residential meter, for final plats filed on or after December 19, 2023 (Ordinance 2023-47) and unplatted land. Earlier plats pay the rate in effect when platted: $1,567.50 (plats from September 1, 2020), $3,471.00 (January 24, 2014 to August 31, 2020), $3,215.56 (December 16, 2008 to January 23, 2014). Larger meters pay by multiplier.
    $2,693.00
Sewer$2,100.00
  • Wastewater Impact Fee (City of Rosenberg) — 5/8" x 3/4" meter
    City of Rosenberg
    Wastewater impact fee for a standard 5/8 x 3/4 inch residential water meter, for final plats filed on or after December 19, 2023 (Ordinance 2023-47) and unplatted land. Earlier plats pay the rate in effect when platted: $1,409.00 (plats from September 1, 2020), $1,234.00 (January 24, 2014 to August 31, 2020), $1,317.89 (December 16, 2008 to January 23, 2014). Larger meters pay by multiplier.
    $2,100.00
City$1,700.00
County$0.00
  • County Impact Fee (Fort Bend County)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Rosenberg): $6,493.00
Sources last checked Official fee schedules:City of Rosenberg Fort Bend County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rosenberg: Multifamily Impact Fees

A new multifamily unit in Rosenberg pays at least $6,493.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Rosenberg, MF) — 5/8" x 3/4" meter ($2,693.00) and Wastewater Impact Fee (City of Rosenberg, MF) — 5/8" x 3/4" meter ($2,100.00).

Park Land Dedication Fee in Lieu and Park Development Fee (City of Rosenberg, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Fort Bend County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Rosenberg Impact Fee Schedule
Water$2,693.00
  • Water Impact Fee (City of Rosenberg, MF) — 5/8" x 3/4" meter
    City of Rosenberg
    Water impact fee charged by meter size: the 5/8 x 3/4 inch base for plats filed on or after December 19, 2023 (Ordinance 2023-47). A building on one master meter pays once at that meter's multiplier (for example 8 times the base for a 2 inch meter).
    $2,693.00
Sewer$2,100.00
City$1,700.00
County$0.00
  • County Impact Fee (Fort Bend County, MF)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Rosenberg): $6,493.00
Sources last checked Official fee schedules:City of Rosenberg Fort Bend County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rosenberg: Commercial Impact Fees

Commercial development in Rosenberg pays no per-square-foot impact fees, but owes $11,982.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $11,982.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Rosenberg) — 1" meter ($6,732.50 one-time) and Wastewater Impact Fee (City of Rosenberg) — 1" meter ($5,250.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of Rosenberg) and Water Tap and Meter Fee (City of Rosenberg) are set by the utility and not published online. County Impact Fees (Fort Bend County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Rosenberg Impact Fee Schedule
Water$6,732.50 one-time
  • Water Impact Fee (City of Rosenberg) — 1" meter
    City of Rosenberg
    City of Rosenberg water impact fee for a 1-inch meter (2.5 living unit equivalents at $2,693 each), Ordinance 2023-47, for final plats filed on or after December 19, 2023 and unplatted development; assessed at final plat. Land platted September 1, 2020 to December 18, 2023 pays the earlier rate of $3,918.75 for a 1-inch meter. Water used only for fire protection is exempt.
    $6,732.50 one-time
  • Water Tap and Meter Fee (City of Rosenberg)
    City of Rosenberg
    The City of Rosenberg also charges for water taps and meters; the amount is not on the city's published impact fee schedule.
    Requires confirmation
Sewer$5,250.00 one-time
  • Wastewater Impact Fee (City of Rosenberg) — 1" meter
    City of Rosenberg
    City of Rosenberg wastewater impact fee for a 1-inch meter (2.5 living unit equivalents at $2,100 each), Ordinance 2023-47, for final plats filed on or after December 19, 2023 and unplatted development; assessed at final plat. Land platted September 1, 2020 to December 18, 2023 pays the earlier rate of $3,522.50 for a 1-inch meter.
    $5,250.00 one-time
  • Sewer Tap Fee (City of Rosenberg)
    City of Rosenberg
    The City of Rosenberg may also charge a sewer tap fee; the amount is not on the city's published impact fee schedule.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Commercial)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Rosenberg): $11,982.50 one-time (≈ $11,982.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Rosenberg Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rosenberg: Industrial Impact Fees

Industrial development in Rosenberg pays no per-square-foot impact fees, but owes $11,982.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $11,982.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Rosenberg) — 1" meter ($6,732.50 one-time) and Wastewater Impact Fee (City of Rosenberg) — 1" meter ($5,250.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of Rosenberg) and Water Tap and Meter Fee (City of Rosenberg) are set by the utility and not published online. County Impact Fees (Fort Bend County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Rosenberg Impact Fee Schedule
Water$6,732.50 one-time
  • Water Impact Fee (City of Rosenberg) — 1" meter
    City of Rosenberg
    City of Rosenberg water impact fee for a 1-inch meter (2.5 living unit equivalents at $2,693 each), Ordinance 2023-47, for final plats filed on or after December 19, 2023 and unplatted development; assessed at final plat. Land platted September 1, 2020 to December 18, 2023 pays the earlier rate of $3,918.75 for a 1-inch meter. Water used only for fire protection is exempt.
    $6,732.50 one-time
  • Water Tap and Meter Fee (City of Rosenberg)
    City of Rosenberg
    The City of Rosenberg also charges for water taps and meters; the amount is not on the city's published impact fee schedule.
    Requires confirmation
Sewer$5,250.00 one-time
  • Wastewater Impact Fee (City of Rosenberg) — 1" meter
    City of Rosenberg
    City of Rosenberg wastewater impact fee for a 1-inch meter (2.5 living unit equivalents at $2,100 each), Ordinance 2023-47, for final plats filed on or after December 19, 2023 and unplatted development; assessed at final plat. Land platted September 1, 2020 to December 18, 2023 pays the earlier rate of $3,522.50 for a 1-inch meter.
    $5,250.00 one-time
  • Sewer Tap Fee (City of Rosenberg)
    City of Rosenberg
    The City of Rosenberg may also charge a sewer tap fee; the amount is not on the city's published impact fee schedule.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fees (Fort Bend County, Industrial)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Rosenberg): $11,982.50 one-time (≈ $11,982.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Rosenberg Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rosenberg: Office Impact Fees

Office development in Rosenberg pays no per-square-foot impact fees, but owes $11,982.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $11,982.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Rosenberg) — 1" meter ($6,732.50 one-time) and Wastewater Impact Fee (City of Rosenberg) — 1" meter ($5,250.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of Rosenberg) and Water Tap and Meter Fee (City of Rosenberg) are set by the utility and not published online. County Impact Fees (Fort Bend County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Rosenberg Impact Fee Schedule
Water$6,732.50 one-time
  • Water Impact Fee (City of Rosenberg) — 1" meter
    City of Rosenberg
    City of Rosenberg water impact fee for a 1-inch meter (2.5 living unit equivalents at $2,693 each), Ordinance 2023-47, for final plats filed on or after December 19, 2023 and unplatted development; assessed at final plat. Land platted September 1, 2020 to December 18, 2023 pays the earlier rate of $3,918.75 for a 1-inch meter. Water used only for fire protection is exempt.
    $6,732.50 one-time
  • Water Tap and Meter Fee (City of Rosenberg)
    City of Rosenberg
    The City of Rosenberg also charges for water taps and meters; the amount is not on the city's published impact fee schedule.
    Requires confirmation
Sewer$5,250.00 one-time
  • Wastewater Impact Fee (City of Rosenberg) — 1" meter
    City of Rosenberg
    City of Rosenberg wastewater impact fee for a 1-inch meter (2.5 living unit equivalents at $2,100 each), Ordinance 2023-47, for final plats filed on or after December 19, 2023 and unplatted development; assessed at final plat. Land platted September 1, 2020 to December 18, 2023 pays the earlier rate of $3,522.50 for a 1-inch meter.
    $5,250.00 one-time
  • Sewer Tap Fee (City of Rosenberg)
    City of Rosenberg
    The City of Rosenberg may also charge a sewer tap fee; the amount is not on the city's published impact fee schedule.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Rosenberg, Office)
    City of Rosenberg
    The City of Rosenberg charges no roadway impact fee; its impact fees are for water and wastewater only. Texas law allows no city park or public safety impact fees.
    $0.00
County$0.00
  • County Impact Fees (Fort Bend County, Office)
    Fort Bend County
    Fort Bend County charges no road, park or public safety impact fees. State law lets the county and its drainage districts charge drainage impact fees; the county's departmental fee schedule effective October 1, 2026 lists none.
    Requires confirmation
Total (Rosenberg): $11,982.50 one-time (≈ $11,982.50 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Rosenberg Fort Bend County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Fort Bend County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rosenberg Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Rosenberg Impact Fee FAQs

What are the total impact fees for a single-family home in Rosenberg, Texas?

A new single-family home in Rosenberg pays at least $6,493.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Rosenberg?

Commercial development in Rosenberg pays no per-square-foot impact fees, but owes $11,982.50 in one-time water and sewer connection fees (assuming a 1-inch meter). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Rosenberg charge its own impact fees?

Yes. Rosenberg levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Rosenberg, with the combined total.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Fort Bend County impact fees page.