Apache Junction, Arizona Impact Fees

Apache Junction applies its own fee schedule. Pinal County does not currently add county-level impact fees inside city limits. A new single-family home pays $12,286.00 per unit (rates sourced ). The full breakdown is below.

Apache Junction Impact Fees by Project Type

Apache Junction: Single-Family Impact Fees

A new single-family home in Apache Junction pays $12,286.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Development Impact Fee (City of Apache Junction) ($6,736.00) and Sewer Connection Permit Fee (Apache Junction Sewer District) ($5,550.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Apache Junction Impact Fee Schedule
Water$0.00
  • Water Hook-Up Fee (Arizona Water Company)
    Arizona Water Company
    In the parts of Apache Junction served by Arizona Water Company (the larger in-city water provider), the company charges no per-home hook-up or capacity fee; its water availability fee is assessed per acre-foot on new subdivisions, not per home. Areas served by the Apache Junction Water District pay the district's fees instead.
    $0.00
Sewer$5,550.00
  • Sewer Connection Permit Fee (Apache Junction Sewer District)
    Apache Junction Sewer District
    The Apache Junction Sewer District charges a one-time connection permit fee of $5,550 per single-family home, effective July 1, 2026, due when the connection permit is applied for. The cost of the physical connection is separate.
    $5,550.00
City$6,736.00
  • Development Impact Fee (City of Apache Junction)
    City of Apache Junction
    Apache Junction charges development impact fees of $6,736 per single-family home under Ordinance 1521 (2022): $550 library, $1,707 parks and recreation, $1,229 police and $3,250 streets, citywide. Water and sewer connection fees are charged separately by the water and sewer districts.
    $6,736.00
County$0.00
Total (Apache Junction): $12,286.00
Sources last checked Official fee schedules:Arizona Water Company Apache Junction Sewer District City of Apache Junction Pinal County

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Apache Junction: Multifamily Impact Fees

A new multifamily unit in Apache Junction pays $8,266.00 per unit in impact fees (rates sourced October 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Development Impact Fee (City of Apache Junction, MF) ($4,516.00) and Sewer Connection Permit Fee (Apache Junction Sewer District, MF) ($3,750.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Apache Junction Impact Fee Schedule
Water$0.00
  • Water Hook-Up Fee (Arizona Water Company, MF)
    Arizona Water Company
    In the parts of Apache Junction served by Arizona Water Company (the larger in-city water provider), the company charges no per-home hook-up or capacity fee; its water availability fee is assessed per acre-foot on new subdivisions, not per home. Areas served by the Apache Junction Water District pay the district's fees instead.
    $0.00
Sewer$3,750.00
  • Sewer Connection Permit Fee (Apache Junction Sewer District, MF)
    Apache Junction Sewer District
    The Apache Junction Sewer District charges a one-time connection permit fee of $3,750 per multifamily unit, effective July 1, 2026, due when the connection permit is applied for. The cost of the physical connection is separate.
    $3,750.00
City$4,516.00
  • Development Impact Fee (City of Apache Junction, MF)
    City of Apache Junction
    Apache Junction charges development impact fees of $4,516 per multifamily unit under Ordinance 1521 (2022): $432 library, $1,340 parks and recreation, $965 police and $1,779 streets, citywide.
    $4,516.00
County$0.00
Total (Apache Junction): $8,266.00
Sources last checked Official fee schedules:Arizona Water Company Apache Junction Sewer District City of Apache Junction Pinal County

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Apache Junction: Commercial Impact Fees

Commercial development in Apache Junction pays $8.52 per square foot in impact fees, plus $5,550.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $431,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Permit Fee (Apache Junction Sewer District) ($5,550.00 one-time) and Development Impact Fee (City of Apache Junction, Commercial) ($8.52/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Apache Junction Impact Fee Schedule
Water$0.00
Sewer$5,550.00 one-time
  • Sewer Connection Permit Fee (Apache Junction Sewer District)
    Apache Junction Sewer District
    Effective 7/1/2026. Nonresidential sewer connection permit fee tiered by annual water usage; $5,550 minimum (up to 100,000 gal/yr), rising to $47,875 (750,001–1,000,000 gal/yr) and a per-gallon formula above. Provided by Apache Junction Sewer District.
    $5,550.00 one-time
City$8.52/sq ft
County$0.00
Total (Apache Junction): $8.52/sq ft + $5,550.00 one-time (≈ $431,550.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Arizona Water Company Apache Junction Sewer District City of Apache Junction Pinal County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Apache Junction: Industrial Impact Fees

Industrial development in Apache Junction pays $1.89 per square foot in impact fees, plus $5,550.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 50,000 sq ft building, that comes to about $100,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Permit Fee (Apache Junction Sewer District) ($5,550.00 one-time) and Development Impact Fee (City of Apache Junction, Industrial) ($1.89/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Apache Junction Impact Fee Schedule
Water$0.00
Sewer$5,550.00 one-time
  • Sewer Connection Permit Fee (Apache Junction Sewer District)
    Apache Junction Sewer District
    Effective 7/1/2026. Nonresidential sewer connection permit fee tiered by annual water usage; $5,550 minimum (up to 100,000 gal/yr), rising to $47,875 (750,001–1,000,000 gal/yr) and a per-gallon formula above. Provided by Apache Junction Sewer District.
    $5,550.00 one-time
City$1.89/sq ft
County$0.00
Total (Apache Junction): $1.89/sq ft + $5,550.00 one-time (≈ $100,050.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Arizona Water Company Apache Junction Sewer District City of Apache Junction Pinal County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Apache Junction: Office Impact Fees

Office development in Apache Junction pays $4.17 per square foot in impact fees, plus $5,550.00 in one-time water and sewer connection fees (rates sourced October 15, 2026).

For a 25,000 sq ft building, that comes to about $109,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Permit Fee (Apache Junction Sewer District) ($5,550.00 one-time) and Development Impact Fee (City of Apache Junction, Office) ($4.17/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Apache Junction Impact Fee Schedule
Water$0.00
Sewer$5,550.00 one-time
  • Sewer Connection Permit Fee (Apache Junction Sewer District)
    Apache Junction Sewer District
    Effective 7/1/2026. Nonresidential sewer connection permit fee tiered by annual water usage; $5,550 minimum (up to 100,000 gal/yr), rising to $47,875 (750,001–1,000,000 gal/yr) and a per-gallon formula above. Provided by Apache Junction Sewer District.
    $5,550.00 one-time
City$4.17/sq ft
County$0.00
Total (Apache Junction): $4.17/sq ft + $5,550.00 one-time (≈ $109,800.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Arizona Water Company Apache Junction Sewer District City of Apache Junction Pinal County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Apache Junction Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Apache Junction Impact Fee FAQs

What are the total impact fees for a single-family home in Apache Junction, Arizona?

A new single-family home in Apache Junction pays $12,286.00 per unit in combined impact fees (rates sourced October 15, 2026).

How much are commercial impact fees in Apache Junction?

Commercial development in Apache Junction pays $8.52 per square foot in impact fees, plus $5,550.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $431,550.00 for a 50,000 sq ft building.

Does Apache Junction charge its own impact fees?

Yes. Apache Junction levies its own municipal impact or utility fees. Pinal County does not currently add county-level impact fees inside Apache Junction. The schedule on this page shows every fee that applies to development in Apache Junction.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pinal County impact fees page.