Casa Grande Impact Fees by Project Type
Casa Grande: Single-Family Impact Fees
A new single-family home in Casa Grande pays $18,851.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Availability Fee (Arizona Water Company) ($8,910.00), Wastewater Development Impact Fee (City of Casa Grande) — Zone B ($4,557.00) and Streets Development Impact Fee (City of Casa Grande) ($3,230.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Casa Grande Impact Fee Schedule
- Water Availability Fee (Arizona Water Company)$8,910.00Arizona Water CompanyArizona Water Company, which serves most of Casa Grande, charges a one-time Water Availability Fee under its Arizona Corporation Commission tariff (WA-262, effective February 12, 2026) for each new metered connection: $8,910 for a meter 1 inch or smaller (0.27 acre-feet a year at $330 per acre-foot over 100 years). It is paid before the final plat is recorded and is reduced where the developer supplies effluent or groundwater savings credits. Meter and service line installation charges are separate.
- Wastewater Development Impact Fee (City of Casa Grande) — Zone B$4,557.00City of Casa GrandeCasa Grande charges a wastewater development impact fee per home that depends on the city's sewer zone; the amount shown is Zone B, the higher of 2 rate zones ($4,443 in Zone A). Effective May 1, 2019.
- Streets Development Impact Fee (City of Casa Grande)$3,230.00City of Casa GrandeCasa Grande charges a streets development impact fee of $3,230 per single-family or two-family home, effective May 1, 2019, citywide. The city is preparing an updated fee study (draft September 2026), so new rates may follow.
- Parks & Recreation Development Impact Fee (City of Casa Grande)$1,153.00City of Casa GrandeCasa Grande charges a parks and recreation development impact fee of $1,153 per single-family or two-family home, effective May 1, 2019, citywide.
- Fire Development Impact Fee (City of Casa Grande)$589.00City of Casa GrandeCasa Grande charges a fire development impact fee of $589 per single-family or two-family home, effective May 1, 2019, citywide.
- General Government Development Impact Fee (City of Casa Grande)$233.00City of Casa GrandeCasa Grande charges a general government development impact fee of $233 per single-family or two-family home, effective May 1, 2019. The city's draft 2026 fee update proposes to drop this category.
- Police Development Impact Fee (City of Casa Grande)$179.00City of Casa GrandeCasa Grande charges a police development impact fee of $179 per single-family or two-family home, effective May 1, 2019, citywide.
- County Development Impact Fee (Pinal County)$0.00Pinal CountyPinal County's development impact fee applies only in unincorporated areas, so it is not charged on homes permitted by the City of Casa Grande.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Casa Grande: Multifamily Impact Fees
A new multifamily unit in Casa Grande pays $15,434.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Availability Fee (Arizona Water Company, MF) ($8,910.00), Wastewater Development Impact Fee (City of Casa Grande, MF) — Zone B ($3,246.00) and Streets Development Impact Fee (City of Casa Grande, MF) ($1,744.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Casa Grande Impact Fee Schedule
- Water Availability Fee (Arizona Water Company, MF)$8,910.00Arizona Water CompanyArizona Water Company, which serves most of Casa Grande, charges a one-time Water Availability Fee (tariff WA-262, effective February 12, 2026) per metered connection, not per unit: $8,910 for a meter 1 inch or smaller. A multifamily building on a larger meter pays based on its engineered annual water demand at $330 per acre-foot over 100 years. The fee is paid before the final plat is recorded.
- Wastewater Development Impact Fee (City of Casa Grande, MF) — Zone B$3,246.00City of Casa GrandeCasa Grande charges a wastewater development impact fee per multifamily unit that depends on the city's sewer zone; the amount shown is Zone B, the higher of 2 rate zones ($3,166 in Zone A). Effective May 1, 2019.
- Streets Development Impact Fee (City of Casa Grande, MF)$1,744.00City of Casa GrandeCasa Grande charges a streets development impact fee of $1,744 per multifamily unit, effective May 1, 2019, citywide. The city is preparing an updated fee study (draft September 2026), so new rates may follow.
- Parks & Recreation Development Impact Fee (City of Casa Grande, MF)$821.00City of Casa GrandeCasa Grande charges a parks and recreation development impact fee of $821 per multifamily unit, effective May 1, 2019, citywide.
- Fire Development Impact Fee (City of Casa Grande, MF)$420.00City of Casa GrandeCasa Grande charges a fire development impact fee of $420 per multifamily unit, effective May 1, 2019, citywide.
- General Government Development Impact Fee (City of Casa Grande, MF)$166.00City of Casa GrandeCasa Grande charges a general government development impact fee of $166 per multifamily unit, effective May 1, 2019. The city's draft 2026 fee update proposes to drop this category.
- Police Development Impact Fee (City of Casa Grande, MF)$127.00City of Casa GrandeCasa Grande charges a police development impact fee of $127 per multifamily unit, effective May 1, 2019, citywide.
- County Development Impact Fee (Pinal County, MF)$0.00Pinal CountyPinal County's development impact fee applies only in unincorporated areas, so it is not charged on multifamily projects permitted by the City of Casa Grande.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Casa Grande: Commercial Impact Fees
Commercial development in Casa Grande pays $5.87 per square foot in impact fees, plus $16,657.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 50,000 sq ft building, that comes to about $310,157.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Availability Fee (Arizona Water Company) ($8,910.00 one-time), Wastewater Development Impact Fee (City of Casa Grande) — Zone B, 1" Displacement ($7,747.00 one-time) and Development Impact Fee (City of Casa Grande, Commercial) ($5.87/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Casa Grande Impact Fee Schedule
- Water Availability Fee (Arizona Water Company)$8,910.00 one-timeArizona Water CompanyEffective February 12, 2026. Arizona Water Company water availability fee, a one-time charge per metered connection: $8,910 for a meter 1 inch or smaller. Larger meters are priced on the connection's engineered annual water demand at $330 per acre-foot times 100 years.
- Wastewater Development Impact Fee (City of Casa Grande) — Zone B, 1" Displacement$7,747.00 one-timeCity of Casa GrandeEffective May 1, 2019. City of Casa Grande wastewater development impact fee by water meter size and zone; Zone B is the highest of 2 rate districts and its 1 inch meter is shown.
- Development Impact Fee (City of Casa Grande, Commercial)$5.87/sq ftCity of Casa GrandeEffective May 1, 2019. City of Casa Grande development impact fees for commercial and retail buildings, per sq ft: fire $0.97, general government $0.12, parks $0.25, police $0.38 and streets $4.15. Wastewater fees by meter size are charged separately.
- County Development Impact Fee (Pinal County, Commercial)$0.00Pinal CountyPinal County development impact fees do not apply within incorporated Casa Grande.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Casa Grande: Industrial Impact Fees
Industrial development in Casa Grande pays $2.78 per square foot in impact fees, plus $16,657.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 50,000 sq ft building, that comes to about $155,657.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Availability Fee (Arizona Water Company) ($8,910.00 one-time), Wastewater Development Impact Fee (City of Casa Grande) — Zone B, 1" Displacement ($7,747.00 one-time) and Development Impact Fee (City of Casa Grande, Industrial) ($2.78/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Casa Grande Impact Fee Schedule
- Water Availability Fee (Arizona Water Company)$8,910.00 one-timeArizona Water CompanyEffective February 12, 2026. Arizona Water Company water availability fee, a one-time charge per metered connection: $8,910 for a meter 1 inch or smaller. Larger meters are priced on the connection's engineered annual water demand at $330 per acre-foot times 100 years.
- Wastewater Development Impact Fee (City of Casa Grande) — Zone B, 1" Displacement$7,747.00 one-timeCity of Casa GrandeEffective May 1, 2019. City of Casa Grande wastewater development impact fee by water meter size and zone; Zone B is the highest of 2 rate districts and its 1 inch meter is shown.
- Development Impact Fee (City of Casa Grande, Industrial)$2.78/sq ftCity of Casa GrandeEffective May 1, 2019. City of Casa Grande development impact fees for light industrial buildings, $2.78 per sq ft in total (fire, general government, parks, police and streets). Wastewater fees by meter size are charged separately.
- County Development Impact Fee (Pinal County, Industrial)$0.00Pinal CountyPinal County development impact fees do not apply within incorporated Casa Grande.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Casa Grande: Office Impact Fees
Office development in Casa Grande pays $4.17 per square foot in impact fees, plus $16,657.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 25,000 sq ft building, that comes to about $120,907.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Availability Fee (Arizona Water Company) ($8,910.00 one-time), Wastewater Development Impact Fee (City of Casa Grande) — Zone B, 1" Displacement ($7,747.00 one-time) and Development Impact Fee (City of Casa Grande, Office) ($4.17/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Casa Grande Impact Fee Schedule
- Water Availability Fee (Arizona Water Company)$8,910.00 one-timeArizona Water CompanyEffective February 12, 2026. Arizona Water Company water availability fee, a one-time charge per metered connection: $8,910 for a meter 1 inch or smaller. Larger meters are priced on the connection's engineered annual water demand at $330 per acre-foot times 100 years.
- Wastewater Development Impact Fee (City of Casa Grande) — Zone B, 1" Displacement$7,747.00 one-timeCity of Casa GrandeEffective May 1, 2019. City of Casa Grande wastewater development impact fee by water meter size and zone; Zone B is the highest of 2 rate districts and its 1 inch meter is shown.
- Development Impact Fee (City of Casa Grande, Office)$4.17/sq ftCity of Casa GrandeEffective May 1, 2019. City of Casa Grande development impact fees for office and institutional buildings, per sq ft: fire $1.61, general government $0.20, parks $0.42, police $0.15 and streets $1.79. Wastewater fees by meter size are charged separately.
- County Development Impact Fee (Pinal County, Office)$0.00Pinal CountyPinal County development impact fees do not apply within incorporated Casa Grande.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Casa Grande Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Casa Grande Impact Fee FAQs
What are the total impact fees for a single-family home in Casa Grande, Arizona?
A new single-family home in Casa Grande pays $18,851.00 per unit in combined impact fees (rates sourced October 14, 2026).
How much are commercial impact fees in Casa Grande?
Commercial development in Casa Grande pays $5.87 per square foot in impact fees, plus $16,657.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $310,157.00 for a 50,000 sq ft building.
Does Casa Grande charge its own impact fees?
Yes. Casa Grande levies its own municipal impact or utility fees. Pinal County does not currently add county-level impact fees inside Casa Grande. The schedule on this page shows every fee that applies to development in Casa Grande.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Pinal County impact fees page.