Florence Impact Fees by Project Type
Florence: Single-Family Impact Fees
A new single-family home in Florence pays $20,170.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Development Impact Fee (Town of Florence) — Territory Square, 0.75" Displacement ($7,791.00), Wastewater Development Impact Fee (Town of Florence) — Territory Square, 0.75" Displacement ($5,819.00) and Fire Development Impact Fee (Town of Florence) ($2,130.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Florence Impact Fee Schedule
- Water Development Impact Fee (Town of Florence) — Territory Square, 0.75" Displacement$7,791.00Town of FlorenceFlorence charges a one-time water development impact fee by meter size, effective August 1, 2024, that depends on the utility benefit area. The amount shown is the Territory Square Benefit Area for a 0.75 inch home meter, the highest of 2 rate districts; in the main Florence Utility Service Area the same meter pays $668. Separate tap and meter installation charges apply, and the Anthem area is served by EPCOR instead of the town.
- Wastewater Development Impact Fee (Town of Florence) — Territory Square, 0.75" Displacement$5,819.00Town of FlorenceFlorence charges a one-time wastewater development impact fee by meter size, effective August 1, 2024, that depends on the utility benefit area. The amount shown is the Territory Square Benefit Area for a 0.75 inch home meter, the highest of 2 rate districts; in the main Florence Utility Service Area the same meter pays $1,290. A separate sewer tap charge applies.
- Fire Development Impact Fee (Town of Florence)$2,130.00Town of FlorenceFlorence charges a fire development impact fee of $2,130 per single-family home, effective August 1, 2024, under the town's 2024 development fee study.
- Street Development Impact Fee (Town of Florence)$2,074.00Town of FlorenceFlorence charges a street development impact fee of $2,074 per single-family home, effective August 1, 2024, under the town's 2024 development fee study.
- Parks Development Impact Fee (Town of Florence)$1,288.00Town of FlorenceFlorence charges a parks development impact fee of $1,288 per single-family home, effective August 1, 2024, under the town's 2024 development fee study.
- Police Development Impact Fee (Town of Florence)$1,068.00Town of FlorenceFlorence charges a police development impact fee of $1,068 per single-family home, effective August 1, 2024, under the town's 2024 development fee study.
- County Development Impact Fee (Pinal County)$0.00Pinal CountyPinal County's development impact fee applies only in unincorporated areas, so it is not charged on homes permitted by the Town of Florence.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Multifamily Impact Fees
A new multifamily unit in Florence pays $19,142.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Development Impact Fee (Town of Florence, MF) — Territory Square, 0.75" Displacement ($7,791.00), Wastewater Development Impact Fee (Town of Florence, MF) — Territory Square, 0.75" Displacement ($5,819.00) and Fire Development Impact Fee (Town of Florence, MF) ($1,904.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Florence Impact Fee Schedule
- Water Development Impact Fee (Town of Florence, MF) — Territory Square, 0.75" Displacement$7,791.00Town of FlorenceFlorence charges a one-time water development impact fee by meter size, not per unit, effective August 1, 2024, that depends on the utility benefit area. The amount shown is the Territory Square Benefit Area at the smallest 0.75 inch meter, the highest of 2 rate districts; in the main Florence Utility Service Area it is $668. A multifamily building on a larger meter pays that meter's fee.
- Wastewater Development Impact Fee (Town of Florence, MF) — Territory Square, 0.75" Displacement$5,819.00Town of FlorenceFlorence charges a one-time wastewater development impact fee by meter size, not per unit, effective August 1, 2024, that depends on the utility benefit area. The amount shown is the Territory Square Benefit Area at the smallest 0.75 inch meter, the highest of 2 rate districts; in the main Florence Utility Service Area it is $1,290. A multifamily building on a larger meter pays that meter's fee.
- Fire Development Impact Fee (Town of Florence, MF)$1,904.00Town of FlorenceFlorence charges a fire development impact fee of $1,904 per multifamily unit (duplexes, condominiums, apartments and similar), effective August 1, 2024.
- Street Development Impact Fee (Town of Florence, MF)$1,523.00Town of FlorenceFlorence charges a street development impact fee of $1,523 per multifamily unit (duplexes, condominiums, apartments and similar), effective August 1, 2024.
- Parks Development Impact Fee (Town of Florence, MF)$1,151.00Town of FlorenceFlorence charges a parks development impact fee of $1,151 per multifamily unit (duplexes, condominiums, apartments and similar), effective August 1, 2024.
- Police Development Impact Fee (Town of Florence, MF)$954.00Town of FlorenceFlorence charges a police development impact fee of $954 per multifamily unit (duplexes, condominiums, apartments and similar), effective August 1, 2024.
- County Development Impact Fee (Pinal County, MF)$0.00Pinal CountyPinal County's development impact fee applies only in unincorporated areas, so it is not charged on multifamily projects permitted by the Town of Florence.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Commercial Impact Fees
Commercial development in Florence pays $4.71 per square foot in impact fees, plus $22,729.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 50,000 sq ft building, that comes to about $258,229.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement ($13,011.00 one-time), Wastewater Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement ($9,718.00 one-time) and Development Impact Fee (Town of Florence, Commercial) ($4.71/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Florence Impact Fee Schedule
- Water Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement$13,011.00 one-timeTown of FlorenceEffective August 1, 2024. Town of Florence water development impact fee by meter size and benefit area; Territory Square is the highest of 2 rate districts. Applies to connections to the Town water system, which serves the area east of Felix Road; EPCOR serves the west side.
- Wastewater Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement$9,718.00 one-timeTown of FlorenceEffective August 1, 2024. Town of Florence wastewater development impact fee by meter size and benefit area; Territory Square is the highest of 2 rate districts. EPCOR provides sewer service in part of the town.
- Development Impact Fee (Town of Florence, Commercial)$4.71/sq ftTown of FlorenceEffective August 1, 2024. Town of Florence development impact fees for commercial and retail buildings, per 1,000 sq ft: police $831, fire $641, parks $9 and streets $3,229.
- County Development Impact Fee (Pinal County, Commercial)$0.00Pinal CountyPinal County development impact fees do not apply within incorporated Florence.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Industrial Impact Fees
Industrial development in Florence pays $1.27 per square foot in impact fees, plus $22,729.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 50,000 sq ft building, that comes to about $86,429.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement ($13,011.00 one-time), Wastewater Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement ($9,718.00 one-time) and Development Impact Fee (Town of Florence, Industrial) ($1.27/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Florence Impact Fee Schedule
- Water Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement$13,011.00 one-timeTown of FlorenceEffective August 1, 2024. Town of Florence water development impact fee by meter size and benefit area; Territory Square is the highest of 2 rate districts. Applies to connections to the Town water system, which serves the area east of Felix Road; EPCOR serves the west side.
- Wastewater Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement$9,718.00 one-timeTown of FlorenceEffective August 1, 2024. Town of Florence wastewater development impact fee by meter size and benefit area; Territory Square is the highest of 2 rate districts. EPCOR provides sewer service in part of the town.
- Development Impact Fee (Town of Florence, Industrial)$1.27/sq ftTown of FlorenceEffective August 1, 2024. Town of Florence development impact fees for industrial and flex buildings, per 1,000 sq ft: police $166, fire $474, parks $7 and streets $627.
- County Development Impact Fee (Pinal County, Industrial)$0.00Pinal CountyPinal County development impact fees do not apply within incorporated Florence.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Office Impact Fees
Office development in Florence pays $2.76 per square foot in impact fees, plus $22,729.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 25,000 sq ft building, that comes to about $91,779.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement ($13,011.00 one-time), Wastewater Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement ($9,718.00 one-time) and Development Impact Fee (Town of Florence, Office) ($2.76/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Florence Impact Fee Schedule
- Water Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement$13,011.00 one-timeTown of FlorenceEffective August 1, 2024. Town of Florence water development impact fee by meter size and benefit area; Territory Square is the highest of 2 rate districts. Applies to connections to the Town water system, which serves the area east of Felix Road; EPCOR serves the west side.
- Wastewater Development Impact Fee (Town of Florence) — Territory Square, 1" Displacement$9,718.00 one-timeTown of FlorenceEffective August 1, 2024. Town of Florence wastewater development impact fee by meter size and benefit area; Territory Square is the highest of 2 rate districts. EPCOR provides sewer service in part of the town.
- Development Impact Fee (Town of Florence, Office)$2.76/sq ftTown of FlorenceEffective August 1, 2024. Town of Florence development impact fees for office and institutional buildings, per 1,000 sq ft: police $369, fire $983, parks $14 and streets $1,396.
- County Development Impact Fee (Pinal County, Office)$0.00Pinal CountyPinal County development impact fees do not apply within incorporated Florence.
Where in Pinal County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Florence Impact Fee FAQs
What are the total impact fees for a single-family home in Florence, Arizona?
A new single-family home in Florence pays $20,170.00 per unit in combined impact fees (rates sourced October 14, 2026).
How much are commercial impact fees in Florence?
Commercial development in Florence pays $4.71 per square foot in impact fees, plus $22,729.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $258,229.00 for a 50,000 sq ft building.
Does Florence charge its own impact fees?
Yes. Florence levies its own municipal impact or utility fees. Pinal County does not currently add county-level impact fees inside Florence. The schedule on this page shows every fee that applies to development in Florence.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Pinal County impact fees page.