San Tan Valley applies its own fee schedule. Pinal County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,800.00 per unit (rates sourced ). The full breakdown is below.

San Tan Valley Impact Fees by Project Type

San Tan Valley: Single-Family Impact Fees

A new single-family home in San Tan Valley pays $6,800.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District) — 4" lateral ($3,900.00) and Water Hook-Up Fee (EPCOR San Tan Water District) — 5/8" x 3/4" meter ($2,900.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full San Tan Valley Impact Fee Schedule
Water$2,900.00
  • Water Hook-Up Fee (EPCOR San Tan Water District) — 5/8" x 3/4" meter
    EPCOR Water Arizona (San Tan Water District)
    EPCOR Water Arizona's one-time common facilities hook-up fee for the San Tan Water District, approved by the Arizona Corporation Commission (Decision 81415) and effective August 1, 2025. It is charged once per lot or service connection by meter size; the amount shown is for a standard 5/8 x 3/4 inch home meter (3/4 and 1 inch meters also pay $2,900; larger meters pay $14,000 to $322,000). Meter and service line installation charges are separate. EPCOR serves most of the town; parts of the town are served by the Town of Queen Creek water utility, which charges its own water capacity fee (listed as a separate option).
    $2,900.00
Sewer$3,900.00
  • Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District) — 4" lateral
    EPCOR Water Arizona (San Tan Wastewater District)
    EPCOR Water Arizona's one-time common wastewater facilities hook-up fee for the San Tan Wastewater District, approved by the Arizona Corporation Commission (Decision 81415) and effective August 1, 2025. It is charged once per lot or connection by sewer service lateral size; the amount shown is the standard 4 inch residential lateral (6 inch $8,775; 8 inch or larger $15,600).
    $3,900.00
City$0.00
  • Development Impact Fee (Town of San Tan Valley)
    Town of San Tan Valley
    The Town of San Tan Valley, incorporated in September 2025, does not charge development impact fees today. A development fee ordinance for parks and streets (gross $6,167 per single-family home) is scheduled to take effect December 21, 2026, but the town credits construction sales tax against it, so at the current 5% construction sales tax rate a single-family home pays $0. Projects with approved plats or site plans are protected from new fees for 24 months.
    $0.00
County$0.00
  • County Development Impact Fee (Pinal County)
    Pinal County
    San Tan Valley incorporated as a town in September 2025 and took over building permits on July 1, 2026. Pinal County's development impact fee applies only in unincorporated areas, so it is not charged on new town permits.
    $0.00
Total (San Tan Valley): $6,800.00

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Tan Valley: Multifamily Impact Fees

A new multifamily unit in San Tan Valley pays $6,800.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District, MF) — 4" lateral ($3,900.00) and Water Hook-Up Fee (EPCOR San Tan Water District, MF) — 5/8" x 3/4" meter ($2,900.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full San Tan Valley Impact Fee Schedule
Water$2,900.00
  • Water Hook-Up Fee (EPCOR San Tan Water District, MF) — 5/8" x 3/4" meter
    EPCOR San Tan Water District, 5/8" x 3/4"
    EPCOR Water Arizona (San Tan Water District)
    EPCOR Water Arizona's one-time common facilities hook-up fee for the San Tan Water District (Arizona Corporation Commission Decision 81415, effective August 1, 2025) is charged per service connection by meter size, not per unit. The amount shown is the smallest meter; a multifamily building on a larger master meter pays the fee for that size ($14,000 for 1-1/2 inch up to $322,000 for 10 inch or larger). EPCOR serves most of the town; parts of the town are served by the Town of Queen Creek water utility, which charges its own water capacity fee (listed as a separate option).
    $2,900.00
Sewer$3,900.00
  • Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District, MF) — 4" lateral
    EPCOR Water Arizona (San Tan Wastewater District)
    EPCOR Water Arizona's one-time common wastewater facilities hook-up fee for the San Tan Wastewater District (Arizona Corporation Commission Decision 81415, effective August 1, 2025) is charged per sewer service lateral by size, not per unit. The amount shown is the 4 inch lateral; a multifamily building on a 6 inch lateral pays $8,775 and on an 8 inch or larger lateral $15,600.
    $3,900.00
City$0.00
  • Development Impact Fee (Town of San Tan Valley, MF)
    Town of San Tan Valley
    The Town of San Tan Valley, incorporated in September 2025, does not charge development impact fees today. A development fee ordinance for parks and streets (gross $3,107 per multifamily unit) is scheduled to take effect December 21, 2026, but the town credits construction sales tax against it, so at the current 5% construction sales tax rate a multifamily unit pays $0. Projects with approved plats or site plans are protected from new fees for 24 months.
    $0.00
County$0.00
  • County Development Impact Fee (Pinal County, MF)
    Pinal County
    San Tan Valley incorporated as a town in September 2025 and took over building permits on July 1, 2026. Pinal County's development impact fee applies only in unincorporated areas, so it is not charged on new town permits.
    $0.00
Total (San Tan Valley): $6,800.00

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Tan Valley: Commercial Impact Fees

Commercial development in San Tan Valley pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 50,000 sq ft building, that comes to about $6,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District) — 4" lateral ($3,900.00 one-time) and Water Hook-Up Fee (EPCOR San Tan Water District) — 1" meter ($2,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full San Tan Valley Impact Fee Schedule
Water$2,900.00 one-time
  • Water Hook-Up Fee (EPCOR San Tan Water District) — 1" meter
    EPCOR Water Arizona Inc.
    Effective August 1, 2025. One-time EPCOR Common Facilities Hook-Up Fee under its Arizona Corporation Commission tariff, charged for each new commercial or industrial service connection (fire lines included) by meter size; the 1 inch meter is shown. EPCOR serves most of the town; areas served by the Town of Queen Creek water utility pay its water capacity fee instead (listed as a separate option).
    $2,900.00 one-time
Sewer$3,900.00 one-time
City$0.00
  • Development Impact Fee (Town of San Tan Valley, Commercial)
    Town of San Tan Valley
    The Town of San Tan Valley has scheduled parks and street development fees to take effect December 21, 2026, at a gross $4,701 per 1,000 sq ft for commercial buildings. At the Town's current 5.00% construction sales tax rate the fee is fully offset, so no development fee is payable.
    $0.00
County$0.00
  • County Development Impact Fee (Pinal County, Commercial)
    Pinal County
    Pinal County development impact fees are collected at county building permit in unincorporated areas only. The Town of San Tan Valley (incorporated September 2025) issues its own permits since July 1, 2026, so the county fee does not apply to new permits in the town.
    $0.00
Total (San Tan Valley): $6,800.00 one-time (≈ $6,800.00 at 50,000 sq ft)
Sources last checked Official fee schedules:EPCOR Water Arizona Inc. Town of San Tan Valley Pinal County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Tan Valley: Industrial Impact Fees

Industrial development in San Tan Valley pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 50,000 sq ft building, that comes to about $6,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District) — 4" lateral ($3,900.00 one-time) and Water Hook-Up Fee (EPCOR San Tan Water District) — 1" meter ($2,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full San Tan Valley Impact Fee Schedule
Water$2,900.00 one-time
  • Water Hook-Up Fee (EPCOR San Tan Water District) — 1" meter
    EPCOR Water Arizona Inc.
    Effective August 1, 2025. One-time EPCOR Common Facilities Hook-Up Fee under its Arizona Corporation Commission tariff, charged for each new commercial or industrial service connection (fire lines included) by meter size; the 1 inch meter is shown. EPCOR serves most of the town; areas served by the Town of Queen Creek water utility pay its water capacity fee instead (listed as a separate option).
    $2,900.00 one-time
Sewer$3,900.00 one-time
City$0.00
  • Development Impact Fee (Town of San Tan Valley, Industrial)
    Town of San Tan Valley
    The Town of San Tan Valley has scheduled parks and street development fees to take effect December 21, 2026, at a gross $1,087 per 1,000 sq ft for industrial buildings. At the Town's current 5.00% construction sales tax rate the fee is fully offset, so no development fee is payable.
    $0.00
County$0.00
  • County Development Impact Fee (Pinal County, Industrial)
    Pinal County
    Pinal County development impact fees are collected at county building permit in unincorporated areas only. The Town of San Tan Valley (incorporated September 2025) issues its own permits since July 1, 2026, so the county fee does not apply to new permits in the town.
    $0.00
Total (San Tan Valley): $6,800.00 one-time (≈ $6,800.00 at 50,000 sq ft)
Sources last checked Official fee schedules:EPCOR Water Arizona Inc. Town of San Tan Valley Pinal County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Tan Valley: Office Impact Fees

Office development in San Tan Valley pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 25,000 sq ft building, that comes to about $6,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Hook-Up Fee (EPCOR San Tan Wastewater District) — 4" lateral ($3,900.00 one-time) and Water Hook-Up Fee (EPCOR San Tan Water District) — 1" meter ($2,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full San Tan Valley Impact Fee Schedule
Water$2,900.00 one-time
  • Water Hook-Up Fee (EPCOR San Tan Water District) — 1" meter
    EPCOR Water Arizona Inc.
    Effective August 1, 2025. One-time EPCOR Common Facilities Hook-Up Fee under its Arizona Corporation Commission tariff, charged for each new commercial or industrial service connection (fire lines included) by meter size; the 1 inch meter is shown. EPCOR serves most of the town; areas served by the Town of Queen Creek water utility pay its water capacity fee instead (listed as a separate option).
    $2,900.00 one-time
Sewer$3,900.00 one-time
City$0.00
  • Development Impact Fee (Town of San Tan Valley, Office)
    Town of San Tan Valley
    The Town of San Tan Valley has scheduled parks and street development fees to take effect December 21, 2026, at a gross $2,371 per 1,000 sq ft for office buildings. At the Town's current 5.00% construction sales tax rate the fee is fully offset, so no development fee is payable.
    $0.00
County$0.00
  • County Development Impact Fee (Pinal County, Office)
    Pinal County
    Pinal County development impact fees are collected at county building permit in unincorporated areas only. The Town of San Tan Valley (incorporated September 2025) issues its own permits since July 1, 2026, so the county fee does not apply to new permits in the town.
    $0.00
Total (San Tan Valley): $6,800.00 one-time (≈ $6,800.00 at 25,000 sq ft)
Sources last checked Official fee schedules:EPCOR Water Arizona Inc. Town of San Tan Valley Pinal County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinal County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

San Tan Valley Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

San Tan Valley Impact Fee FAQs

What are the total impact fees for a single-family home in San Tan Valley, Arizona?

A new single-family home in San Tan Valley pays $6,800.00 per unit in combined impact fees (rates sourced October 14, 2026).

How much are commercial impact fees in San Tan Valley?

Commercial development in San Tan Valley pays no per-square-foot impact fees, but owes $6,800.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does San Tan Valley charge its own impact fees?

Yes. San Tan Valley levies its own municipal impact or utility fees. Pinal County does not currently add county-level impact fees inside San Tan Valley. The schedule on this page shows every fee that applies to development in San Tan Valley.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pinal County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000