Impact fees in Duval County depend on where you build. This page details the rates for unincorporated Duval County, which currently has no published impact fees for single-family homes as of July 12, 2026. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Duval County impact fees by project type

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Duval County: Single-Family Impact Fees

This project type's impact fees in unincorporated Duval County depend on the specific use, building size, and utility demand, and we don't yet have a sourced schedule for them. Rather than publish numbers we can't verify, we model an estimate from cited national fee surveys adjusted for Florida cost levels and local population.

The calculator below is set to this type and produces a clearly labeled

figure. Verify final numbers with Duval County or the relevant city before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Duval County: Multifamily Impact Fees

This project type's impact fees in unincorporated Duval County depend on the specific use, building size, and utility demand, and we don't yet have a sourced schedule for them. Rather than publish numbers we can't verify, we model an estimate from cited national fee surveys adjusted for Florida cost levels and local population.

The calculator below is set to this type and produces a clearly labeled

figure. Verify final numbers with Duval County or the relevant city before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Duval County: Commercial Impact Fees

Commercial development in unincorporated Duval County pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $7,796.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter ($6,392.50 one-time) and Water Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter ($1,404.00 one-time).

City Mobility Fee (Duval County - Unincorporated, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,404.00 one-time
  • Water Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. CONSOLIDATION NOTE: Duval has no true unincorporated area — since 1968 all territory outside the four independent municipalities is the City of Jacksonville's General Services District, served by JEA. Fees are therefore identical to the Jacksonville records. JEA publishes ONE shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table (meter-size based, no class split; shared-table precedent, not contamination). Canonical 1" meter, water without separate irrigation = $1,404 (min ADF 300 gpd). Fee charged is the GREATER of the base fee or $4.68/gal average daily water use — treat base as a floor for nonres. 2" and above: no base fee, calculated from ADF. Table 'As of April 1, 2023', still current.
    $1,404.00 one-time
Sewer$6,392.50 one-time
  • Sewer Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. CONSOLIDATION NOTE: Duval has no true unincorporated area; all territory outside the four independent municipalities is COJ's General Services District, served by JEA — fees identical to the Jacksonville records. From JEA's shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table (meter-size based, no class split). Canonical 1" meter sewer base fee = $6,392.50 (min ADF 250 gpd). Fee charged is the GREATER of the base fee or $25.57/gal of estimated average daily sewer capacity — treat base as a floor for nonres. 2" and above: calculated from ADF only. Table 'As of April 1, 2023', still current.
    $6,392.50 one-time
City$0.00
  • City Mobility Fee (Duval County - Unincorporated, Commercial)
    City of Jacksonville (COJ) — Concurrency & Mobility Management System Office
    CONSOLIDATION NOTE: Duval County has no true unincorporated area. Since 1968 the county and the City of Jacksonville are a consolidated city-county; everything outside the four independent municipalities (Atlantic Beach, Neptune Beach, Jacksonville Beach, Baldwin) is the City of Jacksonville's General Services District. So the governing fees for 'unincorporated Duval' ARE the City of Jacksonville's: COJ Mobility Fee + JEA water/sewer capacity fees. UNCONFIRMED — no published nonres rate schedule. COJ Mobility Fee, Ord. Code §655.503(e) (Ord. 2011-536-E), read 7/12/2026: formula-based (Cost per VMT x Avg VMT per Development Area x net daily trips); rate factors not published; calculator-only (jaxmobilityfee.coj.net), excluded by project policy. Note the Rural Area (RA) development area covers most of the outlying county. ⚠️ CMMSO (904) 255-8330 / CMMSO@coj.net.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County - Unincorporated, Commercial)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee exists in Duval County. Duval has no true unincorporated area: since the 1968 consolidation, all territory outside Atlantic Beach, Neptune Beach, Jacksonville Beach and Baldwin is the City of Jacksonville's General Services District. No separate Duval County government levies impact fees; the only transportation development fee is the COJ Mobility Fee (Ord. Code Ch. 655 Pt. 5), a CITY fee recorded separately. Documented $0, not a data gap.
    $0.00
Total (unincorporated Duval County): $7,796.50 one-time (≈ $7,796.50 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Duval County: Industrial Impact Fees

Industrial development in unincorporated Duval County pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $7,796.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter ($6,392.50 one-time) and Water Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter ($1,404.00 one-time).

City Mobility Fee (Duval County - Unincorporated, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,404.00 one-time
  • Water Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. CONSOLIDATION NOTE: Duval has no true unincorporated area — since 1968 all territory outside the four independent municipalities is the City of Jacksonville's General Services District, served by JEA. Fees are therefore identical to the Jacksonville records. JEA publishes ONE shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table (meter-size based, no class split; shared-table precedent, not contamination). Canonical 1" meter, water without separate irrigation = $1,404 (min ADF 300 gpd). Fee charged is the GREATER of the base fee or $4.68/gal average daily water use — treat base as a floor for nonres. 2" and above: no base fee, calculated from ADF. Table 'As of April 1, 2023', still current.
    $1,404.00 one-time
Sewer$6,392.50 one-time
  • Sewer Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. CONSOLIDATION NOTE: Duval has no true unincorporated area; all territory outside the four independent municipalities is COJ's General Services District, served by JEA — fees identical to the Jacksonville records. From JEA's shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table (meter-size based, no class split). Canonical 1" meter sewer base fee = $6,392.50 (min ADF 250 gpd). Fee charged is the GREATER of the base fee or $25.57/gal of estimated average daily sewer capacity — treat base as a floor for nonres. 2" and above: calculated from ADF only. Table 'As of April 1, 2023', still current.
    $6,392.50 one-time
City$0.00
  • City Mobility Fee (Duval County - Unincorporated, Industrial)
    City of Jacksonville (COJ) — Concurrency & Mobility Management System Office
    CONSOLIDATION NOTE: Duval County has no true unincorporated area — since 1968 it is consolidated with the City of Jacksonville; everything outside the four independent municipalities is COJ's General Services District, so COJ fees govern. UNCONFIRMED — no published nonres rate schedule. COJ Mobility Fee, Ord. Code §655.503(e), read 7/12/2026: formula-based; Cost per VMT and Avg VMT not published; dollar amounts calculator-only (jaxmobilityfee.coj.net), excluded by project policy. ⚠️ CMMSO (904) 255-8330 / CMMSO@coj.net.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County - Unincorporated, Industrial)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee exists in Duval County. Duval has no true unincorporated area (consolidated city-county since 1968; all territory outside the four independent municipalities is COJ's General Services District). Only transportation development fee is the COJ Mobility Fee, a CITY fee recorded separately. Documented $0, not a data gap.
    $0.00
Total (unincorporated Duval County): $7,796.50 one-time (≈ $7,796.50 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Duval County: Office Impact Fees

Office development in unincorporated Duval County pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $7,796.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter ($6,392.50 one-time) and Water Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter ($1,404.00 one-time).

City Mobility Fee (Duval County - Unincorporated, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,404.00 one-time
  • Water Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. CONSOLIDATION NOTE: Duval has no true unincorporated area — since 1968 all territory outside the four independent municipalities is the City of Jacksonville's General Services District, served by JEA. Fees are therefore identical to the Jacksonville records. JEA publishes ONE shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table (meter-size based, no class split; shared-table precedent, not contamination). Canonical 1" meter, water without separate irrigation = $1,404 (min ADF 300 gpd). Fee charged is the GREATER of the base fee or $4.68/gal average daily water use — treat base as a floor for nonres. 2" and above: no base fee, calculated from ADF. Table 'As of April 1, 2023', still current.
    $1,404.00 one-time
Sewer$6,392.50 one-time
  • Sewer Plant Capacity Fee (JEA — Duval County - Unincorporated) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. CONSOLIDATION NOTE: Duval has no true unincorporated area; all territory outside the four independent municipalities is COJ's General Services District, served by JEA — fees identical to the Jacksonville records. From JEA's shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table (meter-size based, no class split). Canonical 1" meter sewer base fee = $6,392.50 (min ADF 250 gpd). Fee charged is the GREATER of the base fee or $25.57/gal of estimated average daily sewer capacity — treat base as a floor for nonres. 2" and above: calculated from ADF only. Table 'As of April 1, 2023', still current.
    $6,392.50 one-time
City$0.00
  • City Mobility Fee (Duval County - Unincorporated, Office)
    City of Jacksonville (COJ) — Concurrency & Mobility Management System Office
    CONSOLIDATION NOTE: Duval County has no true unincorporated area — since 1968 it is consolidated with the City of Jacksonville; everything outside the four independent municipalities is COJ's General Services District, so COJ fees govern. UNCONFIRMED — no published nonres rate schedule. COJ Mobility Fee, Ord. Code §655.503(e), read 7/12/2026: formula-based; Cost per VMT and Avg VMT not published; dollar amounts calculator-only (jaxmobilityfee.coj.net), excluded by project policy. ⚠️ CMMSO (904) 255-8330 / CMMSO@coj.net.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County - Unincorporated, Office)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee exists in Duval County. Duval has no true unincorporated area (consolidated city-county since 1968; all territory outside the four independent municipalities is COJ's General Services District). Only transportation development fee is the COJ Mobility Fee, a CITY fee recorded separately. Documented $0, not a data gap.
    $0.00
Total (unincorporated Duval County): $7,796.50 one-time (≈ $7,796.50 at 25,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Estimate your project in Duval County

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Duval County?

Commercial development in unincorporated Duval County pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Do cities in Duval County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 4 of 5 cities in Duval County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000