Baldwin Impact Fees by Project Type
Baldwin: Single-Family Impact Fees
A new single-family home in Baldwin pays $7,294.00 per unit in impact fees (rates sourced October 17, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee (Town of Baldwin) ($6,447.00) and Water Connection Fee (Town of Baldwin) ($847.00).
View the Full Baldwin Impact Fee Schedule
- Water Connection Fee (Town of Baldwin)$847.00Town of BaldwinA new single-family home in Baldwin pays a one-time water connection cost of $847: a $175 cut-in charge plus a $672 water expansion (impact) fee per equivalent residential unit. The impact fee was set by Ordinance 2025-03 (2025).
- Sewer Connection Fee (Town of Baldwin)$6,447.00Town of BaldwinA new single-family home in Baldwin pays a one-time sewer connection cost of $6,447: a $560 cut-in charge where the sewer lateral already exists, plus a $5,887 wastewater impact fee per equivalent residential unit (110 gallons per day). The impact fee was set by Ordinance 2025-03 (September 16, 2025).
- City Impact Fees (Town of Baldwin)$0.00Town of BaldwinThe Town of Baldwin levies no general municipal impact fee. Its code adopts impact fees only for utilities (a wastewater impact fee and a water facilities expansion fee, both charged per equivalent residential unit and both reset in 2025) and contains no parks, police, fire, library or transportation impact fee. The utility impact fees are shown on the town's water and sewer rows.
- County Impact Fees (Duval County / Town of Baldwin)$0.00Town of Baldwin / Duval CountyBaldwin is an independent town within consolidated Jacksonville/Duval County; no separate county overlay impact fee applies.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Baldwin: Multifamily Impact Fees
Baldwin has no published impact fee amounts for a new multifamily unit (rates sourced October 17, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Town of Baldwin, MF) and Water Connection Fee (Town of Baldwin, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Baldwin Impact Fee Schedule
- Water Connection Fee (Town of Baldwin, MF)Requires confirmationTown of BaldwinThe Town of Baldwin operates its own water system. The multifamily water connection/capacity fee and any per-unit factor are not published online.
- Sewer Connection Fee (Town of Baldwin, MF)Requires confirmationTown of BaldwinThe Town of Baldwin's multifamily sewer connection fee, where the town provides public sewer, is not published online.
- City Impact Fees (Town of Baldwin, MF)$0.00Town of BaldwinThe Town of Baldwin levies no general municipal impact fee. Its code adopts impact fees only for utilities (a wastewater impact fee and a water facilities expansion fee, charged per equivalent residential unit) and contains no parks, police, fire, library or transportation impact fee. The utility fees are shown on the town's water and sewer rows.
- County Impact Fees (Duval County / Town of Baldwin, MF)$0.00Town of Baldwin / Duval CountyBaldwin is an independent town within consolidated Jacksonville/Duval County; no separate county overlay impact fee applies.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Baldwin: Commercial Impact Fees
Commercial development in Baldwin pays no per-square-foot impact fees, but owes $7,294.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 50,000 sq ft building, that comes to about $7,294.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Baldwin) — $560 cut-in + 1 ERU × $5,887/ERU ($6,447.00 one-time) and Water Connection Fee (Town of Baldwin) — $175 cut-in + 1 ERU × $672/ERU ($847.00 one-time).
View the Full Baldwin Impact Fee Schedule
- Water Connection Fee (Town of Baldwin) — $175 cut-in + 1 ERU × $672/ERU$847.00 one-timeTown of BaldwinTown of Baldwin water connection charges: a $175 cut-in charge for an original connection plus a water expansion (impact) fee of $672 per equivalent residential unit (110 gallons per day of water flow), set by Ordinance 2025-03 (2025). A nonresidential connection pays the expansion fee for the number of units its estimated flow represents; one unit is the base. The town runs its own water system.
- Sewer Connection Fee (Town of Baldwin) — $560 cut-in + 1 ERU × $5,887/ERU$6,447.00 one-timeTown of BaldwinTown of Baldwin sewer connection charges: a $560 cut-in charge for a new structure plus a wastewater impact fee of $5,887 per equivalent residential unit (110 gallons per day of wastewater flow), set by Ordinance 2025-03 (2025) and due at building permit issuance. A nonresidential connection pays the impact fee for the number of units its estimated flow represents; one unit is the base. The town runs its own sewer system.
- City Impact Fees (Town of Baldwin, Commercial)$0.00Town of BaldwinThe Town of Baldwin levies no general municipal impact fee on commercial development. Its code adopts impact fees only for water and sewer (charged per equivalent residential unit and reset in 2025), shown on the town's water and sewer rows; there is no parks, police, fire, library or transportation impact fee.
- County Overlay Fees — None applying (Duval County / Town of Baldwin, Commercial)$0.00Duval County (consolidated with City of Jacksonville)Baldwin is an independent town within consolidated Jacksonville and Duval County. No county impact fee applies to commercial development, and the City of Jacksonville mobility fee does not apply inside Baldwin.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Baldwin: Industrial Impact Fees
Industrial development in Baldwin pays no per-square-foot impact fees, but owes $7,294.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 50,000 sq ft building, that comes to about $7,294.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Baldwin) — $560 cut-in + 1 ERU × $5,887/ERU ($6,447.00 one-time) and Water Connection Fee (Town of Baldwin) — $175 cut-in + 1 ERU × $672/ERU ($847.00 one-time).
View the Full Baldwin Impact Fee Schedule
- Water Connection Fee (Town of Baldwin) — $175 cut-in + 1 ERU × $672/ERU$847.00 one-timeTown of BaldwinTown of Baldwin water connection charges: a $175 cut-in charge for an original connection plus a water expansion (impact) fee of $672 per equivalent residential unit (110 gallons per day of water flow), set by Ordinance 2025-03 (2025). A nonresidential connection pays the expansion fee for the number of units its estimated flow represents; one unit is the base. The town runs its own water system.
- Sewer Connection Fee (Town of Baldwin) — $560 cut-in + 1 ERU × $5,887/ERU$6,447.00 one-timeTown of BaldwinTown of Baldwin sewer connection charges: a $560 cut-in charge for a new structure plus a wastewater impact fee of $5,887 per equivalent residential unit (110 gallons per day of wastewater flow), set by Ordinance 2025-03 (2025) and due at building permit issuance. A nonresidential connection pays the impact fee for the number of units its estimated flow represents; one unit is the base. The town runs its own sewer system.
- City Impact Fees (Town of Baldwin, Industrial)$0.00Town of BaldwinThe Town of Baldwin levies no general municipal impact fee on industrial development. Its code adopts impact fees only for water and sewer (charged per equivalent residential unit and reset in 2025), shown on the town's water and sewer rows; there is no parks, police, fire, library or transportation impact fee.
- County Overlay Fees — None applying (Duval County / Town of Baldwin, Industrial)$0.00Duval County (consolidated with City of Jacksonville)Baldwin is an independent town within consolidated Jacksonville and Duval County. No county impact fee applies to industrial development, and the City of Jacksonville mobility fee does not apply inside Baldwin.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Baldwin: Office Impact Fees
Office development in Baldwin pays no per-square-foot impact fees, but owes $7,294.00 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 25,000 sq ft building, that comes to about $7,294.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (Town of Baldwin) — $560 cut-in + 1 ERU × $5,887/ERU ($6,447.00 one-time) and Water Connection Fee (Town of Baldwin) — $175 cut-in + 1 ERU × $672/ERU ($847.00 one-time).
View the Full Baldwin Impact Fee Schedule
- Water Connection Fee (Town of Baldwin) — $175 cut-in + 1 ERU × $672/ERU$847.00 one-timeTown of BaldwinTown of Baldwin water connection charges: a $175 cut-in charge for an original connection plus a water expansion (impact) fee of $672 per equivalent residential unit (110 gallons per day of water flow), set by Ordinance 2025-03 (2025). A nonresidential connection pays the expansion fee for the number of units its estimated flow represents; one unit is the base. The town runs its own water system.
- Sewer Connection Fee (Town of Baldwin) — $560 cut-in + 1 ERU × $5,887/ERU$6,447.00 one-timeTown of BaldwinTown of Baldwin sewer connection charges: a $560 cut-in charge for a new structure plus a wastewater impact fee of $5,887 per equivalent residential unit (110 gallons per day of wastewater flow), set by Ordinance 2025-03 (2025) and due at building permit issuance. A nonresidential connection pays the impact fee for the number of units its estimated flow represents; one unit is the base. The town runs its own sewer system.
- City Impact Fees (Town of Baldwin, Office)$0.00Town of BaldwinThe Town of Baldwin levies no general municipal impact fee on office development. Its code adopts impact fees only for water and sewer (charged per equivalent residential unit and reset in 2025), shown on the town's water and sewer rows; there is no parks, police, fire, library or transportation impact fee.
- County Overlay Fees — None applying (Duval County / Town of Baldwin, Office)$0.00Duval County (consolidated with City of Jacksonville)Baldwin is an independent town within consolidated Jacksonville and Duval County. No county impact fee applies to office development, and the City of Jacksonville mobility fee does not apply inside Baldwin.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Baldwin Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Baldwin Impact Fee FAQs
What are the total impact fees for a single-family home in Baldwin, Florida?
A new single-family home in Baldwin pays $7,294.00 per unit in combined impact fees (rates sourced October 17, 2026).
How much are commercial impact fees in Baldwin?
Commercial development in Baldwin pays no per-square-foot impact fees, but owes $7,294.00 in one-time water and sewer connection fees.
Does Baldwin charge its own impact fees?
Yes. Baldwin levies its own municipal impact or utility fees. Duval County does not currently add county-level impact fees inside Baldwin. The schedule on this page shows every fee that applies to development in Baldwin.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Duval County impact fees page.