IMPACTFEES.ORG

Baldwin, Florida Impact Fees

Baldwin applies its own fee schedule. Duval County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The full breakdown is below.

Baldwin impact fees by project type

Baldwin: Single-Family Impact Fees

Baldwin has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Water Connection Fee (Town of Baldwin) and Sewer Connection Fee (Town of Baldwin) are set by the utility and not published online. City Impact Fees (Town of Baldwin) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Baldwin)
    Town of Baldwin
    Town of Baldwin operates its own water system (voted to remain independent when Duval/Jacksonville consolidated). Water connection/capacity fee not published online; not extractable from Municode (Supp. 9, codified through Ord. 2025-03) or town site (baldwinfl.govoffice2.com). $0 placeholder — looked, not found. ⚠️ Call Town Hall (904) 266-5031 / 266-5030 for current fee.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Baldwin)
    Town of Baldwin
    Sewer connection/capacity fee not published online; not extractable from Municode or town site. Confirm whether town operates public sewer (vs. septic) and the connection fee. $0 placeholder — looked, not found. ⚠️ Call Town Hall (904) 266-5031.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Baldwin)
    Town of Baldwin
    No municipal development impact fee chapter found in Baldwin Code of Ordinances (Supp. 9). Very small town (~1,400 pop). No city-level transportation/parks/fire/police impact fees identified — consistent with Atlantic/Neptune Beach (no impact fee chapter). ⚠️ Confirm none: Town Hall (904) 266-5031.
    Requires confirmation
County$0.00
  • County Impact Fees (Duval County / Town of Baldwin)
    Town of Baldwin / Duval County
    Jacksonville is a consolidated city-county; no separate Duval County government collecting county overlay impact fees. Baldwin voted to remain an independent town but no Duval County overlay impact fee applies (same as Jacksonville/Atlantic Beach/Neptune Beach/Jacksonville Beach).
    $0.00
Total (Baldwin): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Baldwin Town of Baldwin / Duval County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Baldwin: Multifamily Impact Fees

Baldwin has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Sewer Connection Fee (Town of Baldwin, MF) and Water Connection Fee (Town of Baldwin, MF) are set by the utility and not published online. City Impact Fees (Town of Baldwin, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Baldwin, MF)
    Town of Baldwin
    Town of Baldwin operates own water system. MF connection/capacity fee + per-unit ERC factor not published online; not extractable from Municode (Supp. 9) or town site. $0 placeholder — looked, not found. ⚠️ Call Town Hall (904) 266-5031.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Baldwin, MF)
    Town of Baldwin
    Sewer connection/capacity fee + MF ERC factor not published online. Confirm whether town operates public sewer (vs. septic). $0 placeholder — looked, not found. ⚠️ Call Town Hall (904) 266-5031.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Baldwin, MF)
    Town of Baldwin
    No municipal development impact fee chapter found in Baldwin Code (Supp. 9). Very small town. No city-level impact fees identified — consistent with Atlantic/Neptune Beach. ⚠️ Confirm none: Town Hall (904) 266-5031.
    Requires confirmation
County$0.00
  • County Impact Fees (Duval County / Town of Baldwin, MF)
    Town of Baldwin / Duval County
    Jacksonville is a consolidated city-county; no separate Duval County government collecting county overlay impact fees. No Duval County overlay applies to Baldwin (same as all Duval jurisdictions).
    $0.00
Total (Baldwin): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Baldwin Town of Baldwin / Duval County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Baldwin: Commercial Impact Fees

Commercial development in Baldwin pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection Fee (Town of Baldwin) and Water Connection Fee (Town of Baldwin) are set by the utility and not published online. City Impact Fees (Town of Baldwin, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Baldwin)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. Baldwin operates its OWN water system (it voted to remain independent when Duval/Jacksonville consolidated in 1968; JEA does not serve it). No water connection/capacity fee — residential or commercial — is published: not extractable from Municode (Supp. 9, codified through Ord. 2025-03; the Baldwin code renders as an empty JS shell in Chrome as of 7/12/2026) and not on the town site (baldwinfl.govoffice2.com). Web search 7/12/2026 returned nothing for Baldwin FL — same-name trap, results dominated by Baldwin County GA/AL. ⚠️ Call Town Hall (904) 266-5031 / 266-5030 for the commercial water connection fee by meter size.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Baldwin)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. No sewer connection/capacity fee published for any customer class: not extractable from Municode (Supp. 9, through Ord. 2025-03) and not on the town site (baldwinfl.govoffice2.com). ALSO UNCONFIRMED whether the town operates public sewer at all vs. septic — confirm that first. Web search 7/12/2026 returned nothing for Baldwin FL (same-name trap: Baldwin County GA/AL). ⚠️ Call Town Hall (904) 266-5031 / 266-5030.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Baldwin, Commercial)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. No impact-fee / development-fee chapter in the Baldwin Code of Ordinances (Municode, Supp. 9, codified through Ord. 2025-03), and the town publishes no fee schedule on its site (baldwinfl.govoffice2.com). Very small town (~1,400 pop.) that voted to remain independent at consolidation; the absence of any nonres impact fee is likely but is NOT documented anywhere, so this cannot be recorded as a confirmed $0. Web search 7/12/2026 returned nothing for Baldwin FL (results are dominated by Baldwin County, GA/AL — same-name trap). ⚠️ Call Town Hall (904) 266-5031 / 266-5030 to confirm no commercial impact fee.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County / Town of Baldwin, Commercial)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee applies in Baldwin. Duval County is a consolidated city-county (since 1968); no separate county government levies impact fees. Baldwin voted to remain an independent town at consolidation and keeps its own government; the COJ Mobility Fee does not apply inside it. Documented $0, not a data gap. (Baldwin's OWN city-level impact fee status is separately flagged Unconfirmed — see the City records.)
    $0.00
Total (Baldwin): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Baldwin Duval County (consolidated with City of Jacksonville)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Baldwin: Industrial Impact Fees

Industrial development in Baldwin pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection Fee (Town of Baldwin) and Water Connection Fee (Town of Baldwin) are set by the utility and not published online. City Impact Fees (Town of Baldwin, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Baldwin)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. Baldwin operates its OWN water system (it voted to remain independent when Duval/Jacksonville consolidated in 1968; JEA does not serve it). No water connection/capacity fee — residential or commercial — is published: not extractable from Municode (Supp. 9, codified through Ord. 2025-03; the Baldwin code renders as an empty JS shell in Chrome as of 7/12/2026) and not on the town site (baldwinfl.govoffice2.com). Web search 7/12/2026 returned nothing for Baldwin FL — same-name trap, results dominated by Baldwin County GA/AL. ⚠️ Call Town Hall (904) 266-5031 / 266-5030 for the commercial water connection fee by meter size.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Baldwin)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. No sewer connection/capacity fee published for any customer class: not extractable from Municode (Supp. 9, through Ord. 2025-03) and not on the town site (baldwinfl.govoffice2.com). ALSO UNCONFIRMED whether the town operates public sewer at all vs. septic — confirm that first. Web search 7/12/2026 returned nothing for Baldwin FL (same-name trap: Baldwin County GA/AL). ⚠️ Call Town Hall (904) 266-5031 / 266-5030.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Baldwin, Industrial)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. No impact-fee / development-fee chapter in the Baldwin Code of Ordinances (Municode, Supp. 9, through Ord. 2025-03); town publishes no fee schedule online. Baldwin sits at the US-301/I-10 rail junction and does have industrial/warehouse land, so an industrial fee question is not academic — but nothing is published. Web search 7/12/2026 returned nothing (same-name trap: Baldwin County, GA/AL). ⚠️ Call Town Hall (904) 266-5031 to confirm.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County / Town of Baldwin, Industrial)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee applies in Baldwin. Consolidated city-county since 1968; no separate county government levies impact fees. Baldwin remained independent at consolidation; the COJ Mobility Fee does not apply inside it. Documented $0, not a data gap. (Baldwin's own city-level impact fee status is separately flagged Unconfirmed.)
    $0.00
Total (Baldwin): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Baldwin Duval County (consolidated with City of Jacksonville)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Baldwin: Office Impact Fees

Office development in Baldwin pays no per-square-foot impact fees (rates sourced July 12, 2026).

Sewer Connection Fee (Town of Baldwin) and Water Connection Fee (Town of Baldwin) are set by the utility and not published online. City Impact Fees (Town of Baldwin, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Baldwin)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. Baldwin operates its OWN water system (it voted to remain independent when Duval/Jacksonville consolidated in 1968; JEA does not serve it). No water connection/capacity fee — residential or commercial — is published: not extractable from Municode (Supp. 9, codified through Ord. 2025-03; the Baldwin code renders as an empty JS shell in Chrome as of 7/12/2026) and not on the town site (baldwinfl.govoffice2.com). Web search 7/12/2026 returned nothing for Baldwin FL — same-name trap, results dominated by Baldwin County GA/AL. ⚠️ Call Town Hall (904) 266-5031 / 266-5030 for the commercial water connection fee by meter size.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Baldwin)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. No sewer connection/capacity fee published for any customer class: not extractable from Municode (Supp. 9, through Ord. 2025-03) and not on the town site (baldwinfl.govoffice2.com). ALSO UNCONFIRMED whether the town operates public sewer at all vs. septic — confirm that first. Web search 7/12/2026 returned nothing for Baldwin FL (same-name trap: Baldwin County GA/AL). ⚠️ Call Town Hall (904) 266-5031 / 266-5030.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Baldwin, Office)
    Town of Baldwin
    $0 placeholder, UNCONFIRMED — looked, found nothing. No impact-fee / development-fee chapter in the Baldwin Code of Ordinances (Municode, Supp. 9, through Ord. 2025-03); town publishes no fee schedule online. Absence of a nonres impact fee is likely but undocumented. Web search 7/12/2026 returned nothing (same-name trap: results dominated by Baldwin County, GA/AL). ⚠️ Call Town Hall (904) 266-5031 to confirm.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County / Town of Baldwin, Office)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee applies in Baldwin. Consolidated city-county since 1968; no separate county government levies impact fees. Baldwin remained independent at consolidation; the COJ Mobility Fee does not apply inside it. Documented $0, not a data gap. (Baldwin's own city-level impact fee status is separately flagged Unconfirmed.)
    $0.00
Total (Baldwin): $0.00
Sources last checked July 12, 2026Official fee schedules:Town of Baldwin Duval County (consolidated with City of Jacksonville)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Baldwin

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Baldwin?

Baldwin does not currently levy impact fees on commercial development.

Does Baldwin charge its own impact fees?

Yes. Baldwin levies its own municipal impact or utility fees. Duval County does not currently add county-level impact fees inside Baldwin. The schedule on this page shows every fee that applies to development in Baldwin.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Duval County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000