Atlantic Beach impact fees by project type
Atlantic Beach: Single-Family Impact Fees
A new single-family home in Atlantic Beach pays $5,190.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) ($4,050.00) and Water System Development Charge (City of Atlantic Beach) ($1,140.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Atlantic Beach impact fee schedule
- Water System Development Charge (City of Atlantic Beach)$1,140.003/4in meterCity of Atlantic BeachAtlantic Beach water system development charge by meter size (Code Sec. 22-28, Ord. 80-08-76). Standard 3/4-inch residential meter = $1,140 (1-inch $1,904; 1.5-inch $3,796; 2-inch $6,076; 3-inch $11,400; larger sizes higher). Water tap and meter installation are billed separately at actual labor-plus-materials cost.
- Sewer System Development Charge (City of Atlantic Beach)$4,050.003/4in meterCity of Atlantic BeachAtlantic Beach sewer system development charge, keyed to the size of the water connection (Code Sec. 22-170, Ord. 80-08-76). Standard 3/4-inch = $4,050 (1-inch $6,764; 1.5-inch $13,487; 2-inch $21,587; larger higher). Sewer tap installation is billed separately at actual cost.
- City Impact Fees (City of Atlantic Beach)$0.00City of Atlantic BeachAtlantic Beach levies no municipal development impact fees; the city code contains no impact-fee chapter.
- County Impact Fees (Duval County / Atlantic Beach)$0.00Duval CountyJacksonville and Duval County are a consolidated government, so there is no separate county overlay impact fee.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Multifamily Impact Fees
A new multifamily unit in Atlantic Beach pays $5,190.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Development Charge (City of Atlantic Beach, MF) ($4,050.00) and Water System Development Charge (City of Atlantic Beach, MF) ($1,140.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Atlantic Beach impact fee schedule
- Water System Development Charge (City of Atlantic Beach, MF)$1,140.003/4in meterCity of Atlantic BeachAtlantic Beach water system development charge by meter size (Code Sec. 22-28, Ord. 80-08-76). The rate shown is the 3/4-inch base ($1,140); a master-metered multifamily project pays the charge for its master-meter size (e.g. 2-inch $6,076, 3-inch $11,400). Tap and meter installation billed separately at cost.
- Sewer System Development Charge (City of Atlantic Beach, MF)$4,050.003/4in meterCity of Atlantic BeachAtlantic Beach sewer system development charge, keyed to water-connection size (Code Sec. 22-170, Ord. 80-08-76). The rate shown is the 3/4-inch base ($4,050); a master-metered multifamily project pays by its master-meter size. Tap installation billed separately at cost.
- City Impact Fees (City of Atlantic Beach, MF)$0.00City of Atlantic BeachAtlantic Beach levies no municipal development impact fees; the city code contains no impact-fee chapter.
- County Impact Fees (Duval County / Atlantic Beach, MF)$0.00Duval CountyJacksonville and Duval County are a consolidated government, so there is no separate county overlay impact fee.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Commercial Impact Fees
Commercial development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $8,668.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) — 1" water connection ($6,764.00 one-time) and Water System Development Charge (City of Atlantic Beach) — 1" meter ($1,904.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full Atlantic Beach impact fee schedule
- Water System Development Charge (City of Atlantic Beach) — 1" meter$1,904.00 one-timeCity of Atlantic BeachWater system development charge set by meter size (City of Atlantic Beach, Ord. 80-08-76). One schedule applies to all customer classes. Meter and tap installation are charged separately at actual cost. See the other meter sizes for the full ladder.
- Sewer System Development Charge (City of Atlantic Beach) — 1" water connection$6,764.00 one-timeCity of Atlantic BeachSewer system development charge set by the size of the water connection (City of Atlantic Beach, Ord. 80-08-76). One schedule applies to all customer classes. Sewer tap installation is charged separately at actual cost, on top of this charge. Due before building permit issuance. See the other connection sizes for the full ladder.
- City Impact Fees — None applying (City of Atlantic Beach, Commercial)$0.00City of Atlantic Beach
- County Overlay Fees — None applying (Duval County / Atlantic Beach, Commercial)$0.00Duval County (consolidated with City of Jacksonville)
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Industrial Impact Fees
Industrial development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $8,668.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) — 1" water connection ($6,764.00 one-time) and Water System Development Charge (City of Atlantic Beach) — 1" meter ($1,904.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full Atlantic Beach impact fee schedule
- Water System Development Charge (City of Atlantic Beach) — 1" meter$1,904.00 one-timeCity of Atlantic BeachWater system development charge set by meter size (City of Atlantic Beach, Ord. 80-08-76). One schedule applies to all customer classes. Meter and tap installation are charged separately at actual cost. See the other meter sizes for the full ladder.
- Sewer System Development Charge (City of Atlantic Beach) — 1" water connection$6,764.00 one-timeCity of Atlantic BeachSewer system development charge set by the size of the water connection (City of Atlantic Beach, Ord. 80-08-76). One schedule applies to all customer classes. Sewer tap installation is charged separately at actual cost, on top of this charge. Due before building permit issuance. See the other connection sizes for the full ladder.
- City Impact Fees — None applying (City of Atlantic Beach, Industrial)$0.00City of Atlantic Beach
- County Overlay Fees — None applying (Duval County / Atlantic Beach, Industrial)$0.00Duval County (consolidated with City of Jacksonville)
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Office Impact Fees
Office development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $8,668.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) — 1" water connection ($6,764.00 one-time) and Water System Development Charge (City of Atlantic Beach) — 1" meter ($1,904.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full Atlantic Beach impact fee schedule
- Water System Development Charge (City of Atlantic Beach) — 1" meter$1,904.00 one-timeCity of Atlantic BeachWater system development charge set by meter size (City of Atlantic Beach, Ord. 80-08-76). One schedule applies to all customer classes. Meter and tap installation are charged separately at actual cost. See the other meter sizes for the full ladder.
- Sewer System Development Charge (City of Atlantic Beach) — 1" water connection$6,764.00 one-timeCity of Atlantic BeachSewer system development charge set by the size of the water connection (City of Atlantic Beach, Ord. 80-08-76). One schedule applies to all customer classes. Sewer tap installation is charged separately at actual cost, on top of this charge. Due before building permit issuance. See the other connection sizes for the full ladder.
- City Impact Fees — None applying (City of Atlantic Beach, Office)$0.00City of Atlantic Beach
- County Overlay Fees — None applying (Duval County / Atlantic Beach, Office)$0.00Duval County (consolidated with City of Jacksonville)
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Atlantic Beach impact fee FAQs
What are the total impact fees for a single-family home in Atlantic Beach, Florida?
A new single-family home in Atlantic Beach pays $5,190.00 per unit in combined impact fees (rates sourced July 12, 2026).
How much are commercial impact fees in Atlantic Beach?
Commercial development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Atlantic Beach charge its own impact fees?
Yes. Atlantic Beach levies its own municipal impact or utility fees. Duval County does not currently add county-level impact fees inside Atlantic Beach. The schedule on this page shows every fee that applies to development in Atlantic Beach.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Duval County impact fees page.