Atlantic Beach impact fees by project type
Atlantic Beach: Single-Family Impact Fees
A new single-family home in Atlantic Beach pays $5,190.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) ($4,050.00) and Water System Development Charge (City of Atlantic Beach) ($1,140.00).
View the full fee schedule
- Water System Development Charge (City of Atlantic Beach)$1,140.00City of Atlantic BeachCONFIRMED 7/11/2026 against the live code. Code §22-28(1)e (Ord. 80-08-76, 8-25-08), Ch. 22 Art. II Waterworks System — System Development Charge by meter size: ¾in $1,140 / 1in $1,904 / 1½in $3,796 / 2in $6,076 / 3in $11,400 / 4in $19,004 / 6in $37,996 / 8in $60,796. Still the operative adopted schedule (no superseding ordinance). Water tap/meter installation is charged SEPARATELY at actual labor+materials cost per §2-368, in addition to this SDC. NOTE: the previously stored Municode nodeId (PTIICOATBEFLORCO_*) is DEAD — Municode re-keyed Atlantic Beach's nodeIds to the PTIICOOR_* prefix.
- Sewer System Development Charge (City of Atlantic Beach)$4,050.00City of Atlantic BeachCONFIRMED 7/11/2026 against the live code. Code §22-170 (Ch. 22 Art. III Div. 7), Ord. 80-08-76 — System Development Charge by size of WATER connection: ¾in $4,050 / 1in $6,764 / 1½in $13,487 / 2in $21,587 / 3in $40,500 / 4in $67,514 / 6in $134,987 / 8in $215,987. Still the operative adopted schedule. Sewer connection/tap installation charged separately at actual cost (§22-169, §2-368). NOTE: previously stored Municode nodeId (PTIICOATBEFLORCO_*) is DEAD — Municode re-keyed to PTIICOOR_*.
- City Impact Fees (City of Atlantic Beach)$0.00City of Atlantic BeachNo impact fees chapter in Municode; full chapter list reviewed. No city-level development impact fees.
- County Impact Fees (Duval County / Atlantic Beach)$0.00Duval CountyJacksonville is a consolidated city-county; no separate Duval County government collecting county overlay impact fees.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Multifamily Impact Fees
A new multifamily unit in Atlantic Beach pays $5,190.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.
Sewer System Development Charge (City of Atlantic Beach, MF) — ¾in water meter base and Water System Development Charge (City of Atlantic Beach, MF) — ¾in meter base are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water System Development Charge (City of Atlantic Beach, MF) — ¾in meter base$1,140.00Requires confirmationCity of Atlantic BeachAmount SOURCED 7/11/2026 from live code §22-28(1)e (Ord. 80-08-76): SDC by meter size — ¾in $1,140 / 1in $1,904 / 1½in $3,796 / 2in $6,076 / 3in $11,400 / 4in $19,004 / 6in $37,996 / 8in $60,796. Schedule confirmed still operative. Fee is METER-SIZE based, NOT per dwelling unit — an MF master-metered project pays the larger-meter rate. ¾in base entered as representative. ⚠️ Still UNCONFIRMED for MF: confirm master-meter sizing — Public Utilities (904) 247-5800. URL REPOINTED — old Municode nodeId (PTIICOATBEFLORCO_*) is dead; re-keyed to PTIICOOR_*.
- Sewer System Development Charge (City of Atlantic Beach, MF) — ¾in water meter base$4,050.00Requires confirmationCity of Atlantic BeachAmount SOURCED 7/11/2026 from live code §22-170 (Ord. 80-08-76): sewer SDC keyed to the size of the WATER connection — ¾in $4,050 / 1in $6,764 / 1½in $13,487 / 2in $21,587 / 3in $40,500 / 4in $67,514 / 6in $134,987 / 8in $215,987. Schedule confirmed still operative. Fee is METER-SIZE based, NOT per dwelling unit. ¾in base entered as representative. ⚠️ Still UNCONFIRMED for MF: confirm master-meter sizing — Public Utilities (904) 247-5800. URL REPOINTED — old Municode nodeId is dead.
- City Impact Fees (City of Atlantic Beach, MF)$0.00City of Atlantic BeachNo impact fees chapter in Municode; full chapter list reviewed. No city-level development impact fees.
- County Impact Fees (Duval County / Atlantic Beach, MF)$0.00Duval CountyJacksonville is a consolidated city-county; no separate Duval County government collecting county overlay impact fees.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Commercial Impact Fees
Commercial development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $8,668.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) — 1" water connection ($6,764.00 one-time) and Water System Development Charge (City of Atlantic Beach) — 1" meter ($1,904.00 one-time).
View the full fee schedule
- Water System Development Charge (City of Atlantic Beach) — 1" meter$1,904.00 one-timeCity of Atlantic BeachCONFIRMED 7/12/2026 — read directly off the live code via Chrome. Code §22-28(1)e (Ord. 80-08-76, §2, 8-25-08), Ch. 22 Art. II Waterworks System: a SINGLE System Development Charge table set purely by meter size, with NO customer-class split — the same schedule applies to commercial, office and industrial as to residential (shared-table precedent, not residential-rate contamination). Canonical 1" meter = $1,904. Full ladder: 3/4" $1,140 / 1" $1,904 / 1.5" $3,796 / 2" $6,076 / 3" $11,400 / 4" $19,004 / 6" $37,996 / 8" $60,796. Still the operative adopted schedule — no superseding ordinance. Water tap + meter installation is charged SEPARATELY at actual labor+materials cost per §2-368, on top of this SDC; cross-connection control device inspection also applies ($50 for 2" and under, $200 over 2"). SDC due prior to issuance of the building permit and is nontransferable. Note: Municode re-keyed Atlantic Beach nodeIds — the old PTIICOATBEFLORCO_* prefix is dead; PTIICOOR_* is current.
- Sewer System Development Charge (City of Atlantic Beach) — 1" water connection$6,764.00 one-timeCity of Atlantic BeachCONFIRMED 7/12/2026 (verified against the live code 7/11/2026). Code §22-170 (Ch. 22 Art. III Wastewater System, Div. 7), Ord. 80-08-76: Sewer System Development Charge is set by the size of the WATER connection, in a SINGLE table with no customer-class split — the same schedule applies to commercial, office and industrial as to residential (shared-table precedent, not contamination). Canonical 1" water connection = $6,764. Full ladder: 3/4" $4,050 / 1" $6,764 / 1.5" $13,487 / 2" $21,587 / 3" $40,500 / 4" $67,514 / 6" $134,987 / 8" $215,987. Still the operative adopted schedule. Sewer connection/tap installation charged SEPARATELY at actual cost (§22-169, §2-368), on top of this SDC. Due prior to building permit issuance; nontransferable. Municode re-keyed nodeIds — old PTIICOATBEFLORCO_* prefix is dead.
- City Impact Fees — None applying (City of Atlantic Beach, Commercial)$0.00City of Atlantic BeachCONFIRMED $0 — no city nonresidential impact/development fee exists. Full Municode chapter list for Atlantic Beach reviewed 7/12/2026 (also reviewed 7/11/2026 for the residential pass): there is no impact-fee or development-fee chapter, and no separately posted development fee schedule. The city's only one-time development charges are the water and sewer System Development Charges in Code Ch. 22 (§22-28, §22-170) — utility connection fees, entered in the Water/Sewer table, not City impact fees. Documented $0, not a data gap.
- County Overlay Fees — None applying (Duval County / Atlantic Beach, Commercial)$0.00Duval County (consolidated with City of Jacksonville)CONFIRMED $0 — no county overlay impact fee applies in Atlantic Beach. Duval County is a consolidated city-county (since 1968); no separate county government levies impact fees. Atlantic Beach is one of Duval's four independent municipalities and retains its own land development regulations — the COJ Mobility Fee (a City fee) does not reach inside it either. Documented $0, not a data gap.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Industrial Impact Fees
Industrial development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $8,668.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) — 1" water connection ($6,764.00 one-time) and Water System Development Charge (City of Atlantic Beach) — 1" meter ($1,904.00 one-time).
View the full fee schedule
- Water System Development Charge (City of Atlantic Beach) — 1" meter$1,904.00 one-timeCity of Atlantic BeachCONFIRMED 7/12/2026 — read directly off the live code via Chrome. Code §22-28(1)e (Ord. 80-08-76, §2, 8-25-08), Ch. 22 Art. II Waterworks System: a SINGLE System Development Charge table set purely by meter size, with NO customer-class split — the same schedule applies to commercial, office and industrial as to residential (shared-table precedent, not residential-rate contamination). Canonical 1" meter = $1,904. Full ladder: 3/4" $1,140 / 1" $1,904 / 1.5" $3,796 / 2" $6,076 / 3" $11,400 / 4" $19,004 / 6" $37,996 / 8" $60,796. Still the operative adopted schedule — no superseding ordinance. Water tap + meter installation is charged SEPARATELY at actual labor+materials cost per §2-368, on top of this SDC; cross-connection control device inspection also applies ($50 for 2" and under, $200 over 2"). SDC due prior to issuance of the building permit and is nontransferable. Note: Municode re-keyed Atlantic Beach nodeIds — the old PTIICOATBEFLORCO_* prefix is dead; PTIICOOR_* is current.
- Sewer System Development Charge (City of Atlantic Beach) — 1" water connection$6,764.00 one-timeCity of Atlantic BeachCONFIRMED 7/12/2026 (verified against the live code 7/11/2026). Code §22-170 (Ch. 22 Art. III Wastewater System, Div. 7), Ord. 80-08-76: Sewer System Development Charge is set by the size of the WATER connection, in a SINGLE table with no customer-class split — the same schedule applies to commercial, office and industrial as to residential (shared-table precedent, not contamination). Canonical 1" water connection = $6,764. Full ladder: 3/4" $4,050 / 1" $6,764 / 1.5" $13,487 / 2" $21,587 / 3" $40,500 / 4" $67,514 / 6" $134,987 / 8" $215,987. Still the operative adopted schedule. Sewer connection/tap installation charged SEPARATELY at actual cost (§22-169, §2-368), on top of this SDC. Due prior to building permit issuance; nontransferable. Municode re-keyed nodeIds — old PTIICOATBEFLORCO_* prefix is dead.
- City Impact Fees — None applying (City of Atlantic Beach, Industrial)$0.00City of Atlantic BeachCONFIRMED $0 — no city nonresidential impact/development fee exists. Full Municode chapter list reviewed 7/12/2026: no impact-fee or development-fee chapter, no separately posted development fee schedule. Only one-time development charges are the Ch. 22 water/sewer System Development Charges (utility connection fees — see Water/Sewer table). Documented $0, not a data gap.
- County Overlay Fees — None applying (Duval County / Atlantic Beach, Industrial)$0.00Duval County (consolidated with City of Jacksonville)CONFIRMED $0 — no county overlay impact fee applies in Atlantic Beach. Consolidated city-county since 1968; no separate county government levies impact fees. Atlantic Beach is an independent municipality with its own LDRs; the COJ Mobility Fee does not apply inside it. Documented $0, not a data gap.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Office Impact Fees
Office development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $8,668.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Atlantic Beach) — 1" water connection ($6,764.00 one-time) and Water System Development Charge (City of Atlantic Beach) — 1" meter ($1,904.00 one-time).
View the full fee schedule
- Water System Development Charge (City of Atlantic Beach) — 1" meter$1,904.00 one-timeCity of Atlantic BeachCONFIRMED 7/12/2026 — read directly off the live code via Chrome. Code §22-28(1)e (Ord. 80-08-76, §2, 8-25-08), Ch. 22 Art. II Waterworks System: a SINGLE System Development Charge table set purely by meter size, with NO customer-class split — the same schedule applies to commercial, office and industrial as to residential (shared-table precedent, not residential-rate contamination). Canonical 1" meter = $1,904. Full ladder: 3/4" $1,140 / 1" $1,904 / 1.5" $3,796 / 2" $6,076 / 3" $11,400 / 4" $19,004 / 6" $37,996 / 8" $60,796. Still the operative adopted schedule — no superseding ordinance. Water tap + meter installation is charged SEPARATELY at actual labor+materials cost per §2-368, on top of this SDC; cross-connection control device inspection also applies ($50 for 2" and under, $200 over 2"). SDC due prior to issuance of the building permit and is nontransferable. Note: Municode re-keyed Atlantic Beach nodeIds — the old PTIICOATBEFLORCO_* prefix is dead; PTIICOOR_* is current.
- Sewer System Development Charge (City of Atlantic Beach) — 1" water connection$6,764.00 one-timeCity of Atlantic BeachCONFIRMED 7/12/2026 (verified against the live code 7/11/2026). Code §22-170 (Ch. 22 Art. III Wastewater System, Div. 7), Ord. 80-08-76: Sewer System Development Charge is set by the size of the WATER connection, in a SINGLE table with no customer-class split — the same schedule applies to commercial, office and industrial as to residential (shared-table precedent, not contamination). Canonical 1" water connection = $6,764. Full ladder: 3/4" $4,050 / 1" $6,764 / 1.5" $13,487 / 2" $21,587 / 3" $40,500 / 4" $67,514 / 6" $134,987 / 8" $215,987. Still the operative adopted schedule. Sewer connection/tap installation charged SEPARATELY at actual cost (§22-169, §2-368), on top of this SDC. Due prior to building permit issuance; nontransferable. Municode re-keyed nodeIds — old PTIICOATBEFLORCO_* prefix is dead.
- City Impact Fees — None applying (City of Atlantic Beach, Office)$0.00City of Atlantic BeachCONFIRMED $0 — no city nonresidential impact/development fee exists. Full Municode chapter list reviewed 7/12/2026: no impact-fee or development-fee chapter, no separately posted development fee schedule. Only one-time development charges are the Ch. 22 water/sewer System Development Charges (utility connection fees — see Water/Sewer table). Documented $0, not a data gap.
- County Overlay Fees — None applying (Duval County / Atlantic Beach, Office)$0.00Duval County (consolidated with City of Jacksonville)CONFIRMED $0 — no county overlay impact fee applies in Atlantic Beach. Consolidated city-county since 1968; no separate county government levies impact fees. Atlantic Beach is an independent municipality with its own LDRs; the COJ Mobility Fee does not apply inside it. Documented $0, not a data gap.
Where in Duval County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Atlantic Beach
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Atlantic Beach, Florida?
A new single-family home in Atlantic Beach pays $5,190.00 per unit in combined impact fees (rates sourced July 12, 2026).
How much are commercial impact fees in Atlantic Beach?
Commercial development in Atlantic Beach pays no per-square-foot impact fees, but owes $8,668.00 in one-time water and sewer connection fees.
Does Atlantic Beach charge its own impact fees?
Yes. Atlantic Beach levies its own municipal impact or utility fees. Duval County does not currently add county-level impact fees inside Atlantic Beach. The schedule on this page shows every fee that applies to development in Atlantic Beach.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.