IMPACTFEES.ORG

Jacksonville, Florida Impact Fees

Jacksonville applies its own fee schedule. Duval County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $6,284.00 per unit (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Jacksonville impact fees by project type

Jacksonville: Single-Family Impact Fees

A new single-family home in Jacksonville pays at least $6,284.00 per unit in impact fees (rates sourced July 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (JEA) ($5,114.00) and Water Capacity Fee (JEA) ($1,170.00).

City Mobility Fee (City of Jacksonville / COJ) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,170.00
  • Water Capacity Fee (JEA)
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/11/2026. JEA water plant capacity base fee, ¾in residential meter = $1,170 (250 gpd min, no separate irrigation meter); or $4.68/gal of average daily use, whichever is greater. Base fee table still shows "As of April 1, 2023" on the live JEA Capacity Fee Calculator page. RESOLVED: the Oct 1 2025 JEA rate adjustment (and the Oct 1 2026 adjustment approved by the JEA Board 6/30/2026, ~8% for water/sewer) are MONTHLY USAGE rate changes — they did NOT revise the one-time capacity fee table. JEA's 2026 capacity-fee discussion concerns 'behind the meter' additional charges for existing customers expanding usage; no new residential capacity-fee schedule adopted.
    $1,170.00
Sewer$5,114.00
  • Sewer Capacity Fee (JEA)
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/11/2026. JEA sewer plant capacity base fee, ¾in residential meter = $5,114 (200 gpd min); or $25.57/gal of estimated average daily sewer capacity, whichever is greater. Base fee table still shows "As of April 1, 2023" on the live JEA Capacity Fee Calculator page. RESOLVED: the Oct 1 2025 and Oct 1 2026 JEA rate adjustments are MONTHLY USAGE rate changes, not capacity-fee changes; no new residential capacity-fee schedule adopted.
    $5,114.00
City$0.00
  • City Mobility Fee (City of Jacksonville / COJ)
    City of Jacksonville (COJ)
    UNCONFIRMED — calculator-only fee. COJ Concurrency & Mobility Management System, Ord. Code Ch. 655 Part 5 (§655.503). Formula-based across mobility zones; the per-unit rate varies by zone, land use and VMT factors and is NOT published as a schedule — it is only obtainable from the interactive Mobility Fee Calculator (jaxmobilityfee.coj.net), which per project policy we do not use. Re-checked 7/11/2026: still no published rate table. The 2013 mobility fee waiver (Ord. 2013-0094-E) was a 3-year waiver and has long expired. ⚠️ CMMSO (904) 255-8330 / cmmso@coj.net for the current SFR rate by zone. URL REPOINTED: the stored coj.net link now returns an EMPTY body (dead shell) — city migrated to jacksonville.gov.
    Requires confirmation
County$0.00
Total (Jacksonville): $6,284.00
Sources last checked July 12, 2026Official fee schedules:JEA (Jacksonville Electric Authority) City of Jacksonville (COJ) Duval County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jacksonville: Multifamily Impact Fees

Jacksonville has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Sewer Capacity Fee (JEA, MF) and Water Capacity Fee (JEA, MF) are set by the utility and not published online. City Mobility Fee (City of Jacksonville / COJ, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capacity Fee (JEA, MF)
    JEA (Jacksonville Electric Authority)
    JEA water plant capacity fee = $4.68/gal of average daily flow, or the meter-size base fee, whichever is greater (¾in base = $1,170). Base table re-verified 7/11/2026 on the live JEA Capacity Fee Calculator — still "As of April 1, 2023"; the Oct 2025 and Oct 2026 JEA rate adjustments changed MONTHLY USAGE rates, not capacity fees. MF fee is meter-size / projected-flow based, so the per-unit amount depends on master-meter size and engineer-certified flow. ⚠️ Confirm MF meter size + capacity fee with JEA Engineering (904) 665-5260 opt. 6.
    Requires confirmation
Sewer$0.00
  • Sewer Capacity Fee (JEA, MF)
    JEA (Jacksonville Electric Authority)
    JEA sewer plant capacity fee = $25.57/gal of estimated average daily sewer capacity, or the meter-size base fee, whichever is greater (¾in base = $5,114). Base table re-verified 7/11/2026 on the live JEA Capacity Fee Calculator — still "As of April 1, 2023"; the Oct 2025 and Oct 2026 JEA rate adjustments changed MONTHLY USAGE rates, not capacity fees. MF fee is meter-size / projected-flow based. ⚠️ Confirm MF meter size + capacity fee with JEA Engineering (904) 665-5260 opt. 6.
    Requires confirmation
City$0.00
  • City Mobility Fee (City of Jacksonville / COJ, MF)
    City of Jacksonville (COJ)
    UNCONFIRMED — calculator-only fee. COJ Concurrency & Mobility Management System, Ord. Code Ch. 655 Part 5 (§655.503). Formula-based; MF rate varies by mobility zone, land use and VMT factors and is NOT published as a schedule — obtainable only from the interactive Mobility Fee Calculator, which per project policy we do not use. Re-checked 7/11/2026: still no published rate table. ⚠️ CMMSO (904) 255-8330 / cmmso@coj.net. URL REPOINTED: the stored coj.net link now returns an EMPTY body (dead shell) — city migrated to jacksonville.gov.
    Requires confirmation
County$0.00
Total (Jacksonville): $0.00
Sources last checked July 12, 2026Official fee schedules:JEA (Jacksonville Electric Authority) City of Jacksonville (COJ) Duval County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jacksonville: Commercial Impact Fees

Commercial development in Jacksonville pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $7,796.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Plant Capacity Fee (JEA) — 1" meter ($6,392.50 one-time) and Water Plant Capacity Fee (JEA) — 1" meter ($1,404.00 one-time).

City Mobility Fee (City of Jacksonville, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,404.00 one-time
  • Water Plant Capacity Fee (JEA) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. JEA publishes ONE shared base-fee table explicitly titled 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' — meter-size based, no customer-class split, so the nonres fee equals the residential fee at the same meter size (shared-table precedent, cf. Alachua GRU / Macclenny; NOT residential-rate contamination). Canonical 1" meter, water without separate irrigation meter = $1,404 (min ADF 300 gpd). Table effective 'As of April 1, 2023' and still current on the live page. IMPORTANT for nonres: the fee actually charged is the GREATER of this base fee or $4.68 per gallon of average daily water use as estimated/approved by JEA — for most commercial, office and industrial projects the ADF calculation will EXCEED the base fee, so the base fee is a floor, not the expected charge. Meters 2" and greater have NO base fee at all — 'Calculated' from ADF only. ADF per FAC 62-6.008 or an engineer's estimate. Fees summarized from the JEA Water and Sewer Rate Document (jea.com/tariff). Oct 2025 and Oct 2026 JEA rate adjustments are MONTHLY USAGE changes and did not revise the capacity fee table. Separate Meter Set Fee, Standard Tap Fee and line-extension Growth Capacity Charges apply on top. JEA serves Jacksonville + the consolidated county; the 4 independent municipalities run their own utilities.
    $1,404.00 one-time
Sewer$6,392.50 one-time
  • Sewer Plant Capacity Fee (JEA) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. From JEA's shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table — meter-size based, no customer-class split, so nonres = residential at the same meter size (shared-table precedent, not contamination). Canonical 1" meter sewer base fee = $6,392.50 (min ADF 250 gpd). IMPORTANT for nonres: the fee charged is the GREATER of this base fee or $25.57 per gallon of estimated average daily sewer capacity — for most commercial/office/industrial projects the ADF calculation will EXCEED the base fee, so treat the base fee as a floor. Meters 2" and greater: no base fee, 'Calculated' from ADF only. Table effective 'As of April 1, 2023', still current on the live page; summarized from the JEA Water and Sewer Rate Document (jea.com/tariff). Oct 2025/Oct 2026 JEA adjustments were monthly usage rates, not capacity fees.
    $6,392.50 one-time
City$0.00
  • City Mobility Fee (City of Jacksonville, Commercial)
    City of Jacksonville (COJ) — Concurrency & Mobility Management System Office
    UNCONFIRMED — no published nonres rate schedule. COJ Mobility Fee, Ordinance Code Ch. 655 Part 5, §655.503(e) (Ord. 2011-536-E), read in full on Municode 7/12/2026: the fee is formula-based — Fee = A (Cost per VMT) x B (Average VMT per Development Area) x (C Development Daily Vehicle Trips − Trip Reduction Adjustments − Existing Use Trips). C comes from ITE Trip Generation (so a commercial/retail rate exists in principle), but A and B are set outside the code and are NOT published in the code or on the city site. The only source of a dollar figure is the interactive Mobility Fee Calculator (jaxmobilityfee.coj.net); project policy excludes calculators. CMMSO FAQ page re-read 7/12/2026: confirms the calculator is informal/non-binding and a formal application ($500, or $100 expedited) is required for a certified amount. 10 mobility zones x 5 development areas, so no single citywide rate. No other COJ nonres impact fee (fire/parks/police/school) exists. Mobility fee is due before approval of final construction/engineering plans. ⚠️ Contact CMMSO (904) 255-8330 / CMMSO@coj.net for the current commercial rate by mobility zone.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County / Jacksonville, Commercial)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee exists anywhere in Duval County. Duval County and the City of Jacksonville have been a CONSOLIDATED city-county government since 1968; there is no separate Duval County commission levying county impact fees, and the county's official website is jacksonville.gov ('Official City of Jacksonville and Duval County Government Website', re-checked 7/12/2026). The only transportation-type development fee in the consolidated jurisdiction is the COJ Mobility Fee (Ord. Code Ch. 655 Pt. 5) — a CITY fee, recorded separately as Fee Type = City. Documented $0, not a data gap.
    $0.00
Total (Jacksonville): $7,796.50 one-time (≈ $7,796.50 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jacksonville: Industrial Impact Fees

Industrial development in Jacksonville pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $7,796.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Plant Capacity Fee (JEA) — 1" meter ($6,392.50 one-time) and Water Plant Capacity Fee (JEA) — 1" meter ($1,404.00 one-time).

City Mobility Fee (City of Jacksonville, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,404.00 one-time
  • Water Plant Capacity Fee (JEA) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. JEA publishes ONE shared base-fee table explicitly titled 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' — meter-size based, no customer-class split, so the nonres fee equals the residential fee at the same meter size (shared-table precedent, cf. Alachua GRU / Macclenny; NOT residential-rate contamination). Canonical 1" meter, water without separate irrigation meter = $1,404 (min ADF 300 gpd). Table effective 'As of April 1, 2023' and still current on the live page. IMPORTANT for nonres: the fee actually charged is the GREATER of this base fee or $4.68 per gallon of average daily water use as estimated/approved by JEA — for most commercial, office and industrial projects the ADF calculation will EXCEED the base fee, so the base fee is a floor, not the expected charge. Meters 2" and greater have NO base fee at all — 'Calculated' from ADF only. ADF per FAC 62-6.008 or an engineer's estimate. Fees summarized from the JEA Water and Sewer Rate Document (jea.com/tariff). Oct 2025 and Oct 2026 JEA rate adjustments are MONTHLY USAGE changes and did not revise the capacity fee table. Separate Meter Set Fee, Standard Tap Fee and line-extension Growth Capacity Charges apply on top. JEA serves Jacksonville + the consolidated county; the 4 independent municipalities run their own utilities.
    $1,404.00 one-time
Sewer$6,392.50 one-time
  • Sewer Plant Capacity Fee (JEA) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. From JEA's shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table — meter-size based, no customer-class split, so nonres = residential at the same meter size (shared-table precedent, not contamination). Canonical 1" meter sewer base fee = $6,392.50 (min ADF 250 gpd). IMPORTANT for nonres: the fee charged is the GREATER of this base fee or $25.57 per gallon of estimated average daily sewer capacity — for most commercial/office/industrial projects the ADF calculation will EXCEED the base fee, so treat the base fee as a floor. Meters 2" and greater: no base fee, 'Calculated' from ADF only. Table effective 'As of April 1, 2023', still current on the live page; summarized from the JEA Water and Sewer Rate Document (jea.com/tariff). Oct 2025/Oct 2026 JEA adjustments were monthly usage rates, not capacity fees.
    $6,392.50 one-time
City$0.00
  • City Mobility Fee (City of Jacksonville, Industrial)
    City of Jacksonville (COJ) — Concurrency & Mobility Management System Office
    UNCONFIRMED — no published nonres rate schedule. COJ Mobility Fee, Ordinance Code Ch. 655 Part 5, §655.503(e) (Ord. 2011-536-E), read in full on Municode 7/12/2026: formula-based — Fee = Cost per VMT x Avg VMT per Development Area x (Development Daily Vehicle Trips − trip reductions − existing use trips). ITE Trip Generation supplies the general light industrial trip rate, but Cost per VMT and Avg VMT are set outside the code and are not published. Dollar amounts obtainable only from the interactive Mobility Fee Calculator (jaxmobilityfee.coj.net), excluded by project policy; CMMSO FAQ (re-read 7/12/2026) confirms calculator-only + formal application required. ⚠️ Contact CMMSO (904) 255-8330 / CMMSO@coj.net for the current industrial rate by mobility zone.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County / Jacksonville, Industrial)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee exists in Duval County. Consolidated city-county government since 1968; no separate Duval County government levies impact fees. The only transportation development fee is the COJ Mobility Fee (Ord. Code Ch. 655 Pt. 5), a CITY fee recorded separately. Documented $0, not a data gap.
    $0.00
Total (Jacksonville): $7,796.50 one-time (≈ $7,796.50 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jacksonville: Office Impact Fees

Office development in Jacksonville pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $7,796.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Plant Capacity Fee (JEA) — 1" meter ($6,392.50 one-time) and Water Plant Capacity Fee (JEA) — 1" meter ($1,404.00 one-time).

City Mobility Fee (City of Jacksonville, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,404.00 one-time
  • Water Plant Capacity Fee (JEA) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. JEA publishes ONE shared base-fee table explicitly titled 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' — meter-size based, no customer-class split, so the nonres fee equals the residential fee at the same meter size (shared-table precedent, cf. Alachua GRU / Macclenny; NOT residential-rate contamination). Canonical 1" meter, water without separate irrigation meter = $1,404 (min ADF 300 gpd). Table effective 'As of April 1, 2023' and still current on the live page. IMPORTANT for nonres: the fee actually charged is the GREATER of this base fee or $4.68 per gallon of average daily water use as estimated/approved by JEA — for most commercial, office and industrial projects the ADF calculation will EXCEED the base fee, so the base fee is a floor, not the expected charge. Meters 2" and greater have NO base fee at all — 'Calculated' from ADF only. ADF per FAC 62-6.008 or an engineer's estimate. Fees summarized from the JEA Water and Sewer Rate Document (jea.com/tariff). Oct 2025 and Oct 2026 JEA rate adjustments are MONTHLY USAGE changes and did not revise the capacity fee table. Separate Meter Set Fee, Standard Tap Fee and line-extension Growth Capacity Charges apply on top. JEA serves Jacksonville + the consolidated county; the 4 independent municipalities run their own utilities.
    $1,404.00 one-time
Sewer$6,392.50 one-time
  • Sewer Plant Capacity Fee (JEA) — 1" meter
    JEA (Jacksonville Electric Authority)
    CONFIRMED 7/12/2026. From JEA's shared 'Water & Sewer Capacity Base Fees for Residential & Commercial Customers' table — meter-size based, no customer-class split, so nonres = residential at the same meter size (shared-table precedent, not contamination). Canonical 1" meter sewer base fee = $6,392.50 (min ADF 250 gpd). IMPORTANT for nonres: the fee charged is the GREATER of this base fee or $25.57 per gallon of estimated average daily sewer capacity — for most commercial/office/industrial projects the ADF calculation will EXCEED the base fee, so treat the base fee as a floor. Meters 2" and greater: no base fee, 'Calculated' from ADF only. Table effective 'As of April 1, 2023', still current on the live page; summarized from the JEA Water and Sewer Rate Document (jea.com/tariff). Oct 2025/Oct 2026 JEA adjustments were monthly usage rates, not capacity fees.
    $6,392.50 one-time
City$0.00
  • City Mobility Fee (City of Jacksonville, Office)
    City of Jacksonville (COJ) — Concurrency & Mobility Management System Office
    UNCONFIRMED — no published nonres rate schedule. COJ Mobility Fee, Ordinance Code Ch. 655 Part 5, §655.503(e) (Ord. 2011-536-E), read in full on Municode 7/12/2026: formula-based — Fee = Cost per VMT x Avg VMT per Development Area x (Development Daily Vehicle Trips − trip reductions − existing use trips). ITE Trip Generation supplies the general-office trip rate, but Cost per VMT and Avg VMT are set outside the code and are not published. Dollar amounts obtainable only from the interactive Mobility Fee Calculator (jaxmobilityfee.coj.net), excluded by project policy; CMMSO FAQ (re-read 7/12/2026) confirms calculator-only + formal application required. ⚠️ Contact CMMSO (904) 255-8330 / CMMSO@coj.net for the current office rate by mobility zone.
    Requires confirmation
County$0.00
  • County Overlay Fees — None applying (Duval County / Jacksonville, Office)
    Duval County (consolidated with City of Jacksonville)
    CONFIRMED $0 — no county overlay impact fee exists in Duval County. Consolidated city-county government since 1968; no separate Duval County government levies impact fees. The only transportation development fee is the COJ Mobility Fee (Ord. Code Ch. 655 Pt. 5), a CITY fee recorded separately. Documented $0, not a data gap.
    $0.00
Total (Jacksonville): $7,796.50 one-time (≈ $7,796.50 at 25,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Duval County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Jacksonville

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Jacksonville, Florida?

A new single-family home in Jacksonville pays at least $6,284.00 per unit in combined impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Jacksonville?

Commercial development in Jacksonville pays no per-square-foot impact fees, but owes $7,796.50 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Jacksonville charge its own impact fees?

Yes. Jacksonville levies its own municipal impact or utility fees. Duval County does not currently add county-level impact fees inside Jacksonville. The schedule on this page shows every fee that applies to development in Jacksonville.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Duval County impact fees page.