Jacksonville Impact Fees by Project Type
Jacksonville: Single-Family Impact Fees
A new single-family home in Jacksonville pays $22,049.00 per unit in impact fees (rates sourced October 17, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (JEA) ($8,330.00), Sewer Capacity Fee (JEA) ($5,114.00) and Line Extension Growth Capacity Charge (JEA) ($1,695.00).
City Mobility Fee (City of Jacksonville / COJ) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Jacksonville Impact Fee Schedule
- Line Extension Growth Capacity Charge (JEA)$1,695.003/4in meterJEA (Jacksonville Electric Authority)JEA line extension growth capacity charge, paid on every new residential water connection in addition to the water plant capacity fee: $1,695 for a standard 3/4-inch residential meter (in effect since January 1, 2006). JEA splits it between its water and sewer line systems.
- Water Tap Fee (JEA)$1,360.003/4in meterJEA (Jacksonville Electric Authority)JEA tap fee for a new 3/4-inch water service, collected when the service application or plumbing permit is received. JEA charges it when JEA taps the main and installs the service; where the developer builds the service lines to JEA standards and dedicates them, no tap fee applies (see the developer-installed option).
- Water Capacity Fee (JEA)$1,170.003/4in meterJEA (Jacksonville Electric Authority)JEA water plant capacity fee for a standard 3/4-inch residential meter, effective April 1, 2023 (still current). Charged as the greater of the $1,170 base fee or $4.68 per gallon of average daily flow (250 gpd minimum; no separate irrigation meter). JEA's October 2025 and October 2026 rate adjustments changed monthly usage rates only, not this one-time capacity fee.
- Water Meter Set Fee (JEA)$300.003/4in meterJEA (Jacksonville Electric Authority)JEA meter set fee for a new 3/4-inch water meter, collected when the service application or plumbing permit is received. A separate tap fee applies when JEA installs the service tap.
- Sewer Tap Fee (JEA)$8,330.006in connectionJEA (Jacksonville Electric Authority)JEA sewer tap charge for a standard 6-inch connection, paid in advance. Larger connections, and connections where there is no unpaved parkway, are billed at JEA's cost, at least $8,330. Where the developer builds the sewer laterals to JEA standards and dedicates them, no tap charge applies (see the developer-installed option).
- Sewer Capacity Fee (JEA)$5,114.003/4in meterJEA (Jacksonville Electric Authority)JEA sewer plant capacity fee for a standard 3/4-inch residential meter, effective April 1, 2023 (still current). Charged as the greater of the $5,114 base fee or $25.57 per gallon of estimated average daily sewer capacity (200 gpd minimum). JEA's October 2025 and October 2026 rate adjustments changed monthly usage rates only, not this one-time capacity fee.
- City Mobility Fee (City of Jacksonville / COJ)$4,080.00Requires confirmationCity of Jacksonville (COJ)City of Jacksonville mobility fee, assessed on new development under the consolidated city's mobility fee code (Ordinance Code Sec. 655.503). It is calculated per project from a formula (cost per vehicle-mile traveled x trip length x daily trips x internal travel factor) across 10 mobility zones and 5 development-area types, not a flat per-home rate. The cost per vehicle-mile traveled is indexed every October 1. The amount shown ($4,080) is the highest of the zone and area combinations for a single-family home (Mobility Zone 6, Rural area) at the rates in effect from October 1, 2026; the other combinations range from about $900 to $3,700 per home depending on location. Applies only within the City of Jacksonville, not in Atlantic Beach, Neptune Beach, Jacksonville Beach or Baldwin.
- County Impact Fees (Duval County / Jacksonville)$0.00Duval CountyJacksonville and Duval County are a consolidated government, so there is no separate county overlay impact fee.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jacksonville: Multifamily Impact Fees
A new multifamily unit in Jacksonville pays $19,971.00 per unit in impact fees (rates sourced October 17, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (JEA, MF) ($8,330.00), Sewer Capacity Fee (JEA, MF) ($5,114.00) and Line Extension Growth Capacity Charge (JEA, MF) ($1,695.00).
City Mobility Fee (City of Jacksonville / COJ, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Jacksonville Impact Fee Schedule
- Line Extension Growth Capacity Charge (JEA, MF)$1,695.003/4in meterJEA (Jacksonville Electric Authority)JEA line extension growth capacity charge, paid on every new residential water connection in addition to the water plant capacity fee: $1,695 for a 3/4-inch residential meter (in effect since January 1, 2006). Charged per connection; a building on one master meter pays once, at that meter's size.
- Water Tap Fee (JEA, MF)$1,360.003/4in meterJEA (Jacksonville Electric Authority)JEA tap fee for a new 3/4-inch water service, collected when the service application or plumbing permit is received. JEA charges it when JEA taps the main and installs the service; where the developer builds the service lines to JEA standards and dedicates them, no tap fee applies (see the developer-installed option). Modeled per unit; a building on one service pays once.
- Water Capacity Fee (JEA, MF)$1,170.003/4in meterJEA (Jacksonville Electric Authority)JEA water plant capacity fee, charged per new water connection by meter size: $1,170 for a 3/4-inch connection without a separate irrigation meter (effective April 1, 2023), or $4.68 per gallon of estimated average daily water use if greater. JEA has no per-apartment rate; an individually metered unit pays the connection fee, and a building on one master meter pays once for that connection, at the greater of the meter-size minimum or the daily-flow charge.
- Water Meter Set Fee (JEA, MF)$300.003/4in meterJEA (Jacksonville Electric Authority)JEA meter set fee for a new 3/4-inch water meter, collected when the service application or plumbing permit is received. Charged per meter; a building on one master meter pays once, at that meter's size.
- Sewer Tap Fee (JEA, MF)$8,330.006in connectionJEA (Jacksonville Electric Authority)JEA sewer tap charge for a standard 6-inch connection, paid in advance. Larger connections, and connections where there is no unpaved parkway, are billed at JEA's cost, at least $8,330. Where the developer builds the sewer laterals to JEA standards and dedicates them, no tap charge applies (see the developer-installed option). Modeled per unit; a building on one service pays once.
- Sewer Capacity Fee (JEA, MF)$5,114.003/4in meterJEA (Jacksonville Electric Authority)JEA sewer plant capacity fee, charged per new sewer connection by meter size: $5,114 for a 3/4-inch connection (effective April 1, 2023), or $25.57 per gallon of estimated average daily sewer flow if greater. JEA has no per-apartment rate; an individually metered unit pays the connection fee, and a building on one master meter pays once for that connection, at the greater of the meter-size minimum or the daily-flow charge.
- City Mobility Fee (City of Jacksonville / COJ, MF)$2,002.00Requires confirmationCity of Jacksonville (COJ)City of Jacksonville mobility fee for multifamily development, assessed under the consolidated city's mobility fee code (Ordinance Code Sec. 655.503). It is calculated per project from a formula (cost per vehicle-mile traveled x trip length x daily trips x internal travel factor) across 10 mobility zones and 5 development-area types, not a flat per-unit rate; the cost per vehicle-mile traveled is indexed every October 1. The amount shown ($2,002 per unit) is the highest of the zone and area combinations for a mid-rise multifamily unit (Mobility Zone 6, Rural area) at the rates in effect from October 1, 2026; the other combinations range from about $450 to $1,800 per unit depending on location. Applies only within the City of Jacksonville, not in Atlantic Beach, Neptune Beach, Jacksonville Beach or Baldwin.
- County Impact Fees (Duval County / Jacksonville, MF)$0.00Duval CountyJacksonville and Duval County are a consolidated government, so there is no separate county overlay impact fee.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jacksonville: Commercial Impact Fees
Commercial development in Jacksonville pays $13.65 per square foot in impact fees, plus $20,306.50 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 50,000 sq ft building, that comes to about $702,617.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (JEA) — 6" connection ($8,330.00 one-time), Sewer Plant Capacity Fee (JEA) — 1" meter ($6,392.50 one-time) and Line Extension Growth Capacity Charge (JEA) — 1" meter ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Mobility Fee (City of Jacksonville, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Jacksonville Impact Fee Schedule
- Line Extension Growth Capacity Charge (JEA) — 1" meter$2,500.00 one-timeJEA (Jacksonville Electric Authority)JEA line extension growth capacity charge, paid on every new commercial water connection in addition to the water and sewer plant capacity fees: $2,500 for a 1-inch meter (in effect since January 1, 2006).
- Water Plant Capacity Fee (JEA) — 1" meter$1,404.00 one-timeJEA (Jacksonville Electric Authority)Water plant capacity fee, effective April 1, 2023 (JEA, which serves the City of Jacksonville and the consolidated county). The amount shown is the base fee for a 1-inch meter; JEA charges the greater of the base fee or a per-gallon rate applied to estimated average daily flow, so many nonresidential projects pay more. Meters 2 inches and larger have no base fee and are sized entirely from average daily flow. Separate meter-set and tap fees apply. See the other meter sizes for the full ladder.
- Water Tap Fee (JEA) — 1" meter$1,360.00 one-timeJEA (Jacksonville Electric Authority)JEA tap fee for a new 1-inch water service, collected when the service application or plumbing permit is received. JEA charges it when JEA taps the main and installs the service; where the developer builds the service lines to JEA standards and dedicates them, no tap fee applies (see the developer-installed option).
- Water Meter Set Fee (JEA) — 1" meter$320.00 one-timeJEA (Jacksonville Electric Authority)JEA meter set fee for a new 1-inch water meter, collected when the service application or plumbing permit is received. Meters larger than 2 inches are charged at JEA's installation cost, at least $1,150.
- Sewer Tap Fee (JEA) — 6" connection$8,330.00 one-timeJEA (Jacksonville Electric Authority)JEA sewer tap charge for a standard 6-inch connection, paid in advance. Larger connections, and connections where there is no unpaved parkway, are billed at JEA's cost, at least $8,330. Where the developer builds the sewer laterals to JEA standards and dedicates them, no tap charge applies (see the developer-installed option).
- Sewer Plant Capacity Fee (JEA) — 1" meter$6,392.50 one-timeJEA (Jacksonville Electric Authority)Sewer plant capacity fee, effective April 1, 2023 (JEA). The amount shown is the base fee for a 1-inch meter; JEA charges the greater of the base fee or a per-gallon rate applied to estimated average daily sewer capacity, so many nonresidential projects pay more. Meters 2 inches and larger have no base fee and are calculated from average daily flow. See the other meter sizes for the full ladder.
- City Mobility Fee (City of Jacksonville, Commercial)$13.65/sq ftRequires confirmationCity of Jacksonville (COJ) — Concurrency & Mobility Management System OfficeCity of Jacksonville mobility fee, assessed on new development under the consolidated city's mobility fee code (Ordinance Code Sec. 655.503). The fee is calculated per project from a formula (cost per vehicle-mile traveled x trip length x net new daily trips x internal travel factor) across 10 mobility zones and 5 development-area types; the cost per vehicle-mile traveled is indexed every October 1. The amount shown ($13,646.22 per 1,000 sq ft) is the highest zone and area combination (Mobility Zone 6, Rural area) for a 40,000 to 150,000 sq ft shopping plaza at the rates in effect from October 1, 2026, after the City's pass-by and diverted-trip reductions; other locations run as low as about $3,060 per 1,000 sq ft. Trips from an existing use on the site are credited outside downtown. Applies only within the City of Jacksonville, not in Atlantic Beach, Neptune Beach, Jacksonville Beach or Baldwin.
- County Overlay Fees — None applying (Duval County / Jacksonville, Commercial)$0.00Duval County (consolidated with City of Jacksonville)Duval County and the City of Jacksonville are one consolidated government, so no separate county impact fee applies to commercial development. Development in Jacksonville pays the City mobility fee and JEA water and sewer charges, shown on their own rows.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jacksonville: Industrial Impact Fees
Industrial development in Jacksonville pays $1.62 per square foot in impact fees, plus $20,306.50 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 50,000 sq ft building, that comes to about $101,102.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (JEA) — 6" connection ($8,330.00 one-time), Sewer Plant Capacity Fee (JEA) — 1" meter ($6,392.50 one-time) and Line Extension Growth Capacity Charge (JEA) — 1" meter ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Mobility Fee (City of Jacksonville, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Jacksonville Impact Fee Schedule
- Line Extension Growth Capacity Charge (JEA) — 1" meter$2,500.00 one-timeJEA (Jacksonville Electric Authority)JEA line extension growth capacity charge, paid on every new commercial water connection in addition to the water and sewer plant capacity fees: $2,500 for a 1-inch meter (in effect since January 1, 2006).
- Water Plant Capacity Fee (JEA) — 1" meter$1,404.00 one-timeJEA (Jacksonville Electric Authority)Water plant capacity fee, effective April 1, 2023 (JEA, which serves the City of Jacksonville and the consolidated county). The amount shown is the base fee for a 1-inch meter; JEA charges the greater of the base fee or a per-gallon rate applied to estimated average daily flow, so many nonresidential projects pay more. Meters 2 inches and larger have no base fee and are sized entirely from average daily flow. Separate meter-set and tap fees apply. See the other meter sizes for the full ladder.
- Water Tap Fee (JEA) — 1" meter$1,360.00 one-timeJEA (Jacksonville Electric Authority)JEA tap fee for a new 1-inch water service, collected when the service application or plumbing permit is received. JEA charges it when JEA taps the main and installs the service; where the developer builds the service lines to JEA standards and dedicates them, no tap fee applies (see the developer-installed option).
- Water Meter Set Fee (JEA) — 1" meter$320.00 one-timeJEA (Jacksonville Electric Authority)JEA meter set fee for a new 1-inch water meter, collected when the service application or plumbing permit is received. Meters larger than 2 inches are charged at JEA's installation cost, at least $1,150.
- Sewer Tap Fee (JEA) — 6" connection$8,330.00 one-timeJEA (Jacksonville Electric Authority)JEA sewer tap charge for a standard 6-inch connection, paid in advance. Larger connections, and connections where there is no unpaved parkway, are billed at JEA's cost, at least $8,330. Where the developer builds the sewer laterals to JEA standards and dedicates them, no tap charge applies (see the developer-installed option).
- Sewer Plant Capacity Fee (JEA) — 1" meter$6,392.50 one-timeJEA (Jacksonville Electric Authority)Sewer plant capacity fee, effective April 1, 2023 (JEA). The amount shown is the base fee for a 1-inch meter; JEA charges the greater of the base fee or a per-gallon rate applied to estimated average daily sewer capacity, so many nonresidential projects pay more. Meters 2 inches and larger have no base fee and are calculated from average daily flow. See the other meter sizes for the full ladder.
- City Mobility Fee (City of Jacksonville, Industrial)$1.62/sq ftRequires confirmationCity of Jacksonville (COJ) — Concurrency & Mobility Management System OfficeCity of Jacksonville mobility fee, assessed on new development under the consolidated city's mobility fee code (Ordinance Code Sec. 655.503). The fee is calculated per project from a formula (cost per vehicle-mile traveled x trip length x net new daily trips x internal travel factor) across 10 mobility zones and 5 development-area types; the cost per vehicle-mile traveled is indexed every October 1. The amount shown ($1,615.91 per 1,000 sq ft) is the highest zone and area combination (Mobility Zone 6, Rural area) for general light industrial space at the rates in effect from October 1, 2026; other locations run as low as about $360 per 1,000 sq ft. Trips from an existing use on the site are credited outside downtown. Applies only within the City of Jacksonville, not in Atlantic Beach, Neptune Beach, Jacksonville Beach or Baldwin.
- County Overlay Fees — None applying (Duval County / Jacksonville, Industrial)$0.00Duval County (consolidated with City of Jacksonville)Duval County and the City of Jacksonville are one consolidated government, so no separate county impact fee applies to industrial development. Development in Jacksonville pays the City mobility fee and JEA water and sewer charges, shown on their own rows.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jacksonville: Office Impact Fees
Office development in Jacksonville pays $3.51 per square foot in impact fees, plus $20,306.50 in one-time water and sewer connection fees (rates sourced October 17, 2026).
For a 25,000 sq ft building, that comes to about $108,171.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (JEA) — 6" connection ($8,330.00 one-time), Sewer Plant Capacity Fee (JEA) — 1" meter ($6,392.50 one-time) and Line Extension Growth Capacity Charge (JEA) — 1" meter ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Mobility Fee (City of Jacksonville, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Jacksonville Impact Fee Schedule
- Line Extension Growth Capacity Charge (JEA) — 1" meter$2,500.00 one-timeJEA (Jacksonville Electric Authority)JEA line extension growth capacity charge, paid on every new commercial water connection in addition to the water and sewer plant capacity fees: $2,500 for a 1-inch meter (in effect since January 1, 2006).
- Water Plant Capacity Fee (JEA) — 1" meter$1,404.00 one-timeJEA (Jacksonville Electric Authority)Water plant capacity fee, effective April 1, 2023 (JEA, which serves the City of Jacksonville and the consolidated county). The amount shown is the base fee for a 1-inch meter; JEA charges the greater of the base fee or a per-gallon rate applied to estimated average daily flow, so many nonresidential projects pay more. Meters 2 inches and larger have no base fee and are sized entirely from average daily flow. Separate meter-set and tap fees apply. See the other meter sizes for the full ladder.
- Water Tap Fee (JEA) — 1" meter$1,360.00 one-timeJEA (Jacksonville Electric Authority)JEA tap fee for a new 1-inch water service, collected when the service application or plumbing permit is received. JEA charges it when JEA taps the main and installs the service; where the developer builds the service lines to JEA standards and dedicates them, no tap fee applies (see the developer-installed option).
- Water Meter Set Fee (JEA) — 1" meter$320.00 one-timeJEA (Jacksonville Electric Authority)JEA meter set fee for a new 1-inch water meter, collected when the service application or plumbing permit is received. Meters larger than 2 inches are charged at JEA's installation cost, at least $1,150.
- Sewer Tap Fee (JEA) — 6" connection$8,330.00 one-timeJEA (Jacksonville Electric Authority)JEA sewer tap charge for a standard 6-inch connection, paid in advance. Larger connections, and connections where there is no unpaved parkway, are billed at JEA's cost, at least $8,330. Where the developer builds the sewer laterals to JEA standards and dedicates them, no tap charge applies (see the developer-installed option).
- Sewer Plant Capacity Fee (JEA) — 1" meter$6,392.50 one-timeJEA (Jacksonville Electric Authority)Sewer plant capacity fee, effective April 1, 2023 (JEA). The amount shown is the base fee for a 1-inch meter; JEA charges the greater of the base fee or a per-gallon rate applied to estimated average daily sewer capacity, so many nonresidential projects pay more. Meters 2 inches and larger have no base fee and are calculated from average daily flow. See the other meter sizes for the full ladder.
- City Mobility Fee (City of Jacksonville, Office)$3.51/sq ftRequires confirmationCity of Jacksonville (COJ) — Concurrency & Mobility Management System OfficeCity of Jacksonville mobility fee, assessed on new development under the consolidated city's mobility fee code (Ordinance Code Sec. 655.503). The fee is calculated per project from a formula (cost per vehicle-mile traveled x trip length x net new daily trips x internal travel factor) across 10 mobility zones and 5 development-area types; the cost per vehicle-mile traveled is indexed every October 1. The amount shown ($3,514.60 per 1,000 sq ft) is the highest zone and area combination (Mobility Zone 6, Rural area) for general office space over 10,000 sq ft at the rates in effect from October 1, 2026; other locations run as low as about $790 per 1,000 sq ft. Trips from an existing use on the site are credited outside downtown. Applies only within the City of Jacksonville, not in Atlantic Beach, Neptune Beach, Jacksonville Beach or Baldwin.
- County Overlay Fees — None applying (Duval County / Jacksonville, Office)$0.00Duval County (consolidated with City of Jacksonville)Duval County and the City of Jacksonville are one consolidated government, so no separate county impact fee applies to office development. Development in Jacksonville pays the City mobility fee and JEA water and sewer charges, shown on their own rows.
Where in Duval County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jacksonville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Jacksonville Impact Fee FAQs
What are the total impact fees for a single-family home in Jacksonville, Florida?
A new single-family home in Jacksonville pays $22,049.00 per unit in combined impact fees (rates sourced October 17, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Jacksonville?
Commercial development in Jacksonville pays $13.65 per square foot in impact fees, plus $20,306.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $702,617.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Jacksonville charge its own impact fees?
Yes. Jacksonville levies its own municipal impact or utility fees. Duval County does not currently add county-level impact fees inside Jacksonville. The schedule on this page shows every fee that applies to development in Jacksonville.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Duval County impact fees page.