Bonifay Impact Fees by Project Type
Bonifay: Single-Family Impact Fees
A new single-family home in Bonifay pays $5,525.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Impact Fee (City of Bonifay) ($3,600.00), Water System Impact Fee (City of Bonifay) ($1,125.00) and Water Tap Fee (City of Bonifay) ($400.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bonifay Impact Fee Schedule
- Water System Impact Fee (City of Bonifay)$1,125.005/8" x 3/4"City of BonifayWater system impact fee of $1,125.00 per ERC, charged by meter size; a single-family home on a standard 5/8" x 3/4" meter is 1 ERC. Larger meters pay more (see the meter options). Adopted by Ordinance 2006-350, effective November 13, 2006; a proposed update (Ordinance 399) has not been adopted. Applies to new connections anywhere the City of Bonifay water system serves, and is charged in addition to the tap-in fee.
- Water Tap Fee (City of Bonifay)$400.00City of BonifayCity of Bonifay water tap-in fee of $400 per tap inside the city limits ($800 outside), set by Ordinance 338 (2005). Charged in addition to the city's water system impact fee.
- Sewer System Impact Fee (City of Bonifay)$3,600.005/8" x 3/4"City of BonifaySewer system impact fee of $3,600.00 per ERC, charged by meter size; a single-family home on a standard 5/8" x 3/4" meter is 1 ERC. Larger meters pay more (see the meter options). A sewer-only connection with no meter is priced from the per-ERC rate and the Florida Department of Health estimated wastewater flow for the use. Adopted by Ordinance 2006-350, effective November 13, 2006; a proposed update (Ordinance 399) has not been adopted. Charged in addition to the tap-in fee.
- Sewer Tap Fee (City of Bonifay)$400.00City of BonifayCity of Bonifay sewer tap-in fee of $400 per tap inside the city limits ($800 outside), set by Ordinance 338 (2005). Charged in addition to the city's sewer system impact fee.
- City Impact Fee (Bonifay)$0.00City of BonifayThe City of Bonifay levies no transportation, parks, police, fire or other general impact fees. Its water and sewer tap-in fees and system impact fees are listed separately.
- County Impact Fee (Bonifay)$0.00Holmes CountyHolmes County levies no development impact fees, including no school impact fee, in the City of Bonifay.
Where in Holmes County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonifay: Multifamily Impact Fees
A new multifamily unit in Bonifay pays $5,525.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer System Impact Fee (City of Bonifay, MF) ($3,600.00), Water System Impact Fee (City of Bonifay, MF) ($1,125.00) and Sewer Tap Fee (City of Bonifay, MF) ($400.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bonifay Impact Fee Schedule
- Water System Impact Fee (City of Bonifay, MF)$1,125.005/8" x 3/4"City of BonifayWater system impact fee of $1,125.00 per ERC, charged by meter size rather than per dwelling unit. The amount shown is the 5/8" x 3/4" meter (1 ERC); a building on a larger master meter pays the larger meter's fee (see the meter options). Adopted by Ordinance 2006-350, effective November 13, 2006; a proposed update (Ordinance 399) has not been adopted. Charged in addition to the tap-in fee.
- Water Tap Fee (City of Bonifay, MF)$400.00City of BonifayCity of Bonifay water tap-in fee of $400 per tap inside the city limits ($800 outside), set by Ordinance 338 (2005). Commercial tap-ins, which can include larger multifamily projects, are priced case by case by the City Council. Charged in addition to the water system impact fee.
- Sewer System Impact Fee (City of Bonifay, MF)$3,600.005/8" x 3/4"City of BonifaySewer system impact fee of $3,600.00 per ERC, charged by meter size rather than per dwelling unit. The amount shown is the 5/8" x 3/4" meter (1 ERC); a building on a larger master meter pays the larger meter's fee (see the meter options). A sewer-only connection is priced from the per-ERC rate and the Florida Department of Health estimated wastewater flow. Adopted by Ordinance 2006-350, effective November 13, 2006; a proposed update (Ordinance 399) has not been adopted.
- Sewer Tap Fee (City of Bonifay, MF)$400.00City of BonifayCity of Bonifay sewer tap-in fee of $400 per tap inside the city limits ($800 outside), set by Ordinance 338 (2005). Commercial tap-ins, which can include larger multifamily projects, are priced case by case by the City Council. Charged in addition to the sewer system impact fee.
- City Impact Fee (Bonifay, MF)$0.00City of BonifayThe City of Bonifay levies no transportation, parks, police, fire or other general impact fees. Its water and sewer tap-in fees and system impact fees are listed separately.
- County Impact Fee (Bonifay, MF)$0.00Holmes CountyHolmes County levies no development impact fees, including no school impact fee, on multifamily development in the City of Bonifay.
Where in Holmes County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonifay: Commercial Impact Fees
Commercial development in Bonifay pays no per-square-foot impact fees, but owes $7,888.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $7,888.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Impact Fee (City of Bonifay) — 1" meter ($5,400.00 one-time) and Water System Impact Fee (City of Bonifay) — 1" meter ($1,688.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap-In Fee (City of Bonifay) and Water Tap-In Fee (City of Bonifay) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Bonifay Impact Fee Schedule
- Water System Impact Fee (City of Bonifay) — 1" meter$1,688.00 one-timeCity of BonifayCity of Bonifay water system impact fee, charged by meter size under Ordinance 2006-350 (effective November 13, 2006) at $1,125 per ERC; a 1" meter is the standard nonresidential connection. Compound and turbine meters of the same size are priced differently, and meters over 6" are priced individually by the City. Applies to new connections anywhere the Bonifay water system serves, inside or outside the city limits, and is paid in addition to the tap-in fee. No update to the 2006 schedule has been published.
- Water Tap-In Fee (City of Bonifay)$400.00 one-timeRequires confirmationCity of BonifayCity of Bonifay water tap-in fee, set by Ordinance 338 (2005) as a minimum of $400 per tap inside the city limits ($800 outside). Commercial tap-ins are set by the City Council case by case based on the type, size and impact of the development, so a commercial connection can cost more. Paid in addition to the water system impact fee.
- Sewer System Impact Fee (City of Bonifay) — 1" meter$5,400.00 one-timeCity of BonifayCity of Bonifay sewer system impact fee, charged by meter size under Ordinance 2006-350 (effective November 13, 2006) at $3,600 per ERC; a 1" meter is the standard nonresidential connection. Compound and turbine meters of the same size are priced differently, and meters over 6" are priced individually by the City. A sewer-only connection with no water meter is priced from the per-ERC rate and the Florida Department of Health estimated wastewater flow for the use. Applies to new connections anywhere the Bonifay sewer system serves, inside or outside the city limits, and is paid in addition to the tap-in fee. No update to the 2006 schedule has been published.
- Sewer Tap-In Fee (City of Bonifay)$400.00 one-timeRequires confirmationCity of BonifayCity of Bonifay sewer tap-in fee, set by Ordinance 338 (2005) as a minimum of $400 per tap inside the city limits ($800 outside). Commercial tap-ins are set by the City Council case by case based on the type, size and impact of the development, so a commercial connection can cost more. Paid in addition to the sewer system impact fee.
- City Impact Fee (City of Bonifay, Commercial) — none levied$0.00City of BonifayThe City of Bonifay levies no transportation, parks, police, fire or other general impact fees on nonresidential development. Its water and sewer tap-in fees and system impact fees are listed separately.
- County Impact Fee (Holmes County, Commercial) — none levied$0.00Holmes CountyHolmes County levies no development impact fees on nonresidential development in the City of Bonifay.
Where in Holmes County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonifay: Industrial Impact Fees
Industrial development in Bonifay pays no per-square-foot impact fees, but owes $7,888.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $7,888.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Impact Fee (City of Bonifay) — 1" meter ($5,400.00 one-time) and Water System Impact Fee (City of Bonifay) — 1" meter ($1,688.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap-In Fee (City of Bonifay) and Water Tap-In Fee (City of Bonifay) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Bonifay Impact Fee Schedule
- Water System Impact Fee (City of Bonifay) — 1" meter$1,688.00 one-timeCity of BonifayCity of Bonifay water system impact fee, charged by meter size under Ordinance 2006-350 (effective November 13, 2006) at $1,125 per ERC; a 1" meter is the standard nonresidential connection. Compound and turbine meters of the same size are priced differently, and meters over 6" are priced individually by the City. Applies to new connections anywhere the Bonifay water system serves, inside or outside the city limits, and is paid in addition to the tap-in fee. No update to the 2006 schedule has been published.
- Water Tap-In Fee (City of Bonifay)$400.00 one-timeRequires confirmationCity of BonifayCity of Bonifay water tap-in fee, set by Ordinance 338 (2005) as a minimum of $400 per tap inside the city limits ($800 outside). Commercial tap-ins are set by the City Council case by case based on the type, size and impact of the development, so a commercial connection can cost more. Paid in addition to the water system impact fee.
- Sewer System Impact Fee (City of Bonifay) — 1" meter$5,400.00 one-timeCity of BonifayCity of Bonifay sewer system impact fee, charged by meter size under Ordinance 2006-350 (effective November 13, 2006) at $3,600 per ERC; a 1" meter is the standard nonresidential connection. Compound and turbine meters of the same size are priced differently, and meters over 6" are priced individually by the City. A sewer-only connection with no water meter is priced from the per-ERC rate and the Florida Department of Health estimated wastewater flow for the use. Applies to new connections anywhere the Bonifay sewer system serves, inside or outside the city limits, and is paid in addition to the tap-in fee. No update to the 2006 schedule has been published.
- Sewer Tap-In Fee (City of Bonifay)$400.00 one-timeRequires confirmationCity of BonifayCity of Bonifay sewer tap-in fee, set by Ordinance 338 (2005) as a minimum of $400 per tap inside the city limits ($800 outside). Commercial tap-ins are set by the City Council case by case based on the type, size and impact of the development, so a commercial connection can cost more. Paid in addition to the sewer system impact fee.
- City Impact Fee (City of Bonifay, Industrial) — none levied$0.00City of BonifayThe City of Bonifay levies no transportation, parks, police, fire or other general impact fees on nonresidential development. Its water and sewer tap-in fees and system impact fees are listed separately.
- County Impact Fee (Holmes County, Industrial) — none levied$0.00Holmes CountyHolmes County levies no development impact fees on nonresidential development in the City of Bonifay.
Where in Holmes County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonifay: Office Impact Fees
Office development in Bonifay pays no per-square-foot impact fees, but owes $7,888.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 25,000 sq ft building, that comes to about $7,888.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Impact Fee (City of Bonifay) — 1" meter ($5,400.00 one-time) and Water System Impact Fee (City of Bonifay) — 1" meter ($1,688.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap-In Fee (City of Bonifay) and Water Tap-In Fee (City of Bonifay) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Bonifay Impact Fee Schedule
- Water System Impact Fee (City of Bonifay) — 1" meter$1,688.00 one-timeCity of BonifayCity of Bonifay water system impact fee, charged by meter size under Ordinance 2006-350 (effective November 13, 2006) at $1,125 per ERC; a 1" meter is the standard nonresidential connection. Compound and turbine meters of the same size are priced differently, and meters over 6" are priced individually by the City. Applies to new connections anywhere the Bonifay water system serves, inside or outside the city limits, and is paid in addition to the tap-in fee. No update to the 2006 schedule has been published.
- Water Tap-In Fee (City of Bonifay)$400.00 one-timeRequires confirmationCity of BonifayCity of Bonifay water tap-in fee, set by Ordinance 338 (2005) as a minimum of $400 per tap inside the city limits ($800 outside). Commercial tap-ins are set by the City Council case by case based on the type, size and impact of the development, so a commercial connection can cost more. Paid in addition to the water system impact fee.
- Sewer System Impact Fee (City of Bonifay) — 1" meter$5,400.00 one-timeCity of BonifayCity of Bonifay sewer system impact fee, charged by meter size under Ordinance 2006-350 (effective November 13, 2006) at $3,600 per ERC; a 1" meter is the standard nonresidential connection. Compound and turbine meters of the same size are priced differently, and meters over 6" are priced individually by the City. A sewer-only connection with no water meter is priced from the per-ERC rate and the Florida Department of Health estimated wastewater flow for the use. Applies to new connections anywhere the Bonifay sewer system serves, inside or outside the city limits, and is paid in addition to the tap-in fee. No update to the 2006 schedule has been published.
- Sewer Tap-In Fee (City of Bonifay)$400.00 one-timeRequires confirmationCity of BonifayCity of Bonifay sewer tap-in fee, set by Ordinance 338 (2005) as a minimum of $400 per tap inside the city limits ($800 outside). Commercial tap-ins are set by the City Council case by case based on the type, size and impact of the development, so a commercial connection can cost more. Paid in addition to the sewer system impact fee.
- City Impact Fee (City of Bonifay, Office) — none levied$0.00City of BonifayThe City of Bonifay levies no transportation, parks, police, fire or other general impact fees on nonresidential development. Its water and sewer tap-in fees and system impact fees are listed separately.
- County Impact Fee (Holmes County, Office) — none levied$0.00Holmes CountyHolmes County levies no development impact fees on nonresidential development in the City of Bonifay.
Where in Holmes County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bonifay Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bonifay Impact Fee FAQs
What are the total impact fees for a single-family home in Bonifay, Florida?
A new single-family home in Bonifay pays $5,525.00 per unit in combined impact fees (rates sourced July 13, 2026).
How much are commercial impact fees in Bonifay?
Commercial development in Bonifay pays no per-square-foot impact fees, but owes $7,888.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Bonifay charge its own impact fees?
Yes. Bonifay levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Bonifay. The schedule on this page shows every fee that applies to development in Bonifay.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Holmes County impact fees page.