Ponce de Leon, Florida Impact Fees

Ponce de Leon applies its own fee schedule. Holmes County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The full breakdown is below.

Ponce de Leon impact fees by project type

Ponce de Leon: Single-Family Impact Fees

Ponce de Leon has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Sewer Connection Fee (Ponce de Leon) and Water Connection Fee (Ponce de Leon) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Ponce de Leon)
    Town of Ponce de Leon
    Town operates its own water system (contract-operated). No connection/impact fee schedule published — the Town has no municipal website and no codifier. Re-searched 7/12/2026, still nothing posted. Call Town Hall: (850) 836-4361.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Ponce de Leon)
    Town of Ponce de Leon
    Town operates its own sewer system (contract-operated). No connection/impact fee schedule published — the Town has no municipal website and no codifier. CDBG grant application submitted for sewer treatment plant capacity expansion — watch for a new fee on completion. Re-searched 7/12/2026, still nothing posted. Call Town Hall: (850) 836-4361.
    Requires confirmation
City$0.00
  • City Impact Fee (Ponce de Leon)
    Town of Ponce de Leon
    No city development impact fees found.
    $0.00
County$0.00
  • County Impact Fee (Ponce de Leon)
    Holmes County
    No county development impact fees.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked July 13, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Multifamily Impact Fees

Ponce de Leon has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Water Connection Fee (Ponce de Leon, MF) and Sewer Connection Fee (Ponce de Leon, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Ponce de Leon, MF)
    Town of Ponce de Leon
    Town operates its own water system (contract-operated). No connection/impact fee schedule published — no municipal website, no codifier. Re-searched 7/12/2026, still nothing posted. No per-unit MF basis known. Call Town Hall: (850) 836-4361.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Ponce de Leon, MF)
    Town of Ponce de Leon
    Town operates its own sewer system (contract-operated). No connection/impact fee schedule published — no municipal website, no codifier. CDBG grant application submitted for sewer plant capacity expansion — capacity is the binding constraint for any MF project; watch for a new fee on completion. Re-searched 7/12/2026, still nothing posted. Call Town Hall: (850) 836-4361.
    Requires confirmation
City$0.00
  • City Impact Fee (Ponce de Leon, MF)
    Town of Ponce de Leon
    No city development impact fees found.
    $0.00
County$0.00
  • County Impact Fee (Ponce de Leon, MF)
    Holmes County
    No county development impact fees.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked July 13, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Commercial Impact Fees

Commercial development in Ponce de Leon pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Ponce de Leon) and Sewer Connection Fee (Town of Ponce de Leon) are set by the utility and not published online. City Impact Fee (Town of Ponce de Leon, Commercial) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    $0 PLACEHOLDER — amount unknown, not confirmed absent. The Town operates its own water system (contract-operated) and therefore almost certainly charges a connection/tap fee, but NO fee schedule is published anywhere: the Town has no municipal website, is on no codifier (not Municode/American Legal/eCode360), and posts no ordinances. Re-searched 2026-07-13 for a nonresidential/commercial meter schedule — nothing found. Call Ponce de Leon Town Hall: (850) 836-4361, and ask for the commercial water connection/tap fee and any meter-size ladder.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    $0 PLACEHOLDER — amount unknown, not confirmed absent. The Town operates its own sewer system (contract-operated). NO connection/impact fee schedule is published: no municipal website, no codifier, no posted ordinances. A CDBG grant application was submitted for sewer treatment plant capacity expansion — a new or revised capacity fee may follow completion; recheck each cycle. Re-searched 2026-07-13, still nothing posted. Call Ponce de Leon Town Hall: (850) 836-4361.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponce de Leon, Commercial) — none found
    Town of Ponce de Leon
    $0 PLACEHOLDER — no municipal impact fee found, but absence could NOT be proved. The Town of Ponce de Leon has NO municipal website, is on NO codifier (not Municode / American Legal / eCode360), and publishes no ordinances or fee schedule anywhere. Evidence supporting $0: the Town has no building or planning department and nonresidential construction is permitted through the Holmes County Building Department, which indicates the Town does not administer development fees. Because no adopted ordinance corpus exists to search, this $0 is UNVERIFIED. Re-searched 2026-07-13. Confirm with Ponce de Leon Town Hall: (850) 836-4361.
    Requires confirmation
County$0.00
  • County Impact Fee (Holmes County, Commercial) — none levied
    Holmes County
    CONFIRMED $0 — Holmes County levies NO impact fee of any kind, in the unincorporated area or inside any municipality. Proved 2026-07-13 against the Clerk of Court's COMPLETE county ordinance index (1972–2026, no impact-fee ordinance) and the County LDRs (updated 2009, no impact-fee article). Only county development charges are cost-recovery building permit/inspection fees. WATCH: Ord. 26-03 (6/16/2026) data-center moratorium; recheck each cycle.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked July 13, 2026Official fee schedule:Holmes County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Industrial Impact Fees

Industrial development in Ponce de Leon pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Ponce de Leon) and Sewer Connection Fee (Town of Ponce de Leon) are set by the utility and not published online. City Impact Fee (Town of Ponce de Leon, Industrial) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    $0 PLACEHOLDER — amount unknown, not confirmed absent. The Town operates its own water system (contract-operated) and therefore almost certainly charges a connection/tap fee, but NO fee schedule is published anywhere: the Town has no municipal website, is on no codifier (not Municode/American Legal/eCode360), and posts no ordinances. Re-searched 2026-07-13 for a nonresidential/commercial meter schedule — nothing found. Call Ponce de Leon Town Hall: (850) 836-4361, and ask for the commercial water connection/tap fee and any meter-size ladder.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    $0 PLACEHOLDER — amount unknown, not confirmed absent. The Town operates its own sewer system (contract-operated). NO connection/impact fee schedule is published: no municipal website, no codifier, no posted ordinances. A CDBG grant application was submitted for sewer treatment plant capacity expansion — a new or revised capacity fee may follow completion; recheck each cycle. Re-searched 2026-07-13, still nothing posted. Call Ponce de Leon Town Hall: (850) 836-4361.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponce de Leon, Industrial) — none found
    Town of Ponce de Leon
    $0 PLACEHOLDER — no municipal impact fee found, but absence could NOT be proved. The Town of Ponce de Leon has no municipal website, is on no codifier, and publishes no ordinances or fee schedule. Evidence supporting $0: no building/planning department; nonres construction is permitted through the Holmes County Building Department. UNVERIFIED for lack of a published ordinance corpus. Re-searched 2026-07-13. Confirm with Ponce de Leon Town Hall: (850) 836-4361.
    Requires confirmation
County$0.00
  • County Impact Fee (Holmes County, Industrial) — none levied
    Holmes County
    CONFIRMED $0 — Holmes County levies NO impact fee of any kind, in the unincorporated area or inside any municipality. Proved 2026-07-13 against the Clerk of Court's COMPLETE county ordinance index (1972–2026) and the County LDRs (updated 2009). Only county development charges are cost-recovery building permit/inspection fees. WATCH: Ord. 26-03 (6/16/2026) moratorium on large-load customer facilities and data centers — an infrastructure fee could follow; recheck each cycle.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked July 13, 2026Official fee schedule:Holmes County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Office Impact Fees

Office development in Ponce de Leon pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Ponce de Leon) and Sewer Connection Fee (Town of Ponce de Leon) are set by the utility and not published online. City Impact Fee (Town of Ponce de Leon, Office) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    $0 PLACEHOLDER — amount unknown, not confirmed absent. The Town operates its own water system (contract-operated) and therefore almost certainly charges a connection/tap fee, but NO fee schedule is published anywhere: the Town has no municipal website, is on no codifier (not Municode/American Legal/eCode360), and posts no ordinances. Re-searched 2026-07-13 for a nonresidential/commercial meter schedule — nothing found. Call Ponce de Leon Town Hall: (850) 836-4361, and ask for the commercial water connection/tap fee and any meter-size ladder.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    $0 PLACEHOLDER — amount unknown, not confirmed absent. The Town operates its own sewer system (contract-operated). NO connection/impact fee schedule is published: no municipal website, no codifier, no posted ordinances. A CDBG grant application was submitted for sewer treatment plant capacity expansion — a new or revised capacity fee may follow completion; recheck each cycle. Re-searched 2026-07-13, still nothing posted. Call Ponce de Leon Town Hall: (850) 836-4361.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponce de Leon, Office) — none found
    Town of Ponce de Leon
    $0 PLACEHOLDER — no municipal impact fee found, but absence could NOT be proved. The Town of Ponce de Leon has no municipal website, is on no codifier, and publishes no ordinances or fee schedule. Evidence supporting $0: no building/planning department; nonres construction is permitted through the Holmes County Building Department. UNVERIFIED for lack of a published ordinance corpus. Re-searched 2026-07-13. Confirm with Ponce de Leon Town Hall: (850) 836-4361.
    Requires confirmation
County$0.00
  • County Impact Fee (Holmes County, Office) — none levied
    Holmes County
    CONFIRMED $0 — Holmes County levies NO impact fee of any kind, in the unincorporated area or inside any municipality. Proved 2026-07-13 against the Clerk of Court's COMPLETE county ordinance index (1972–2026) and the County LDRs (updated 2009). Only county development charges are cost-recovery building permit/inspection fees. WATCH: Ord. 26-03 (6/16/2026) data-center moratorium; recheck each cycle.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked July 13, 2026Official fee schedule:Holmes County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Ponce de Leon

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Ponce de Leon?

Ponce de Leon does not currently levy impact fees on commercial development.

Does Ponce de Leon charge its own impact fees?

Yes. Ponce de Leon levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Ponce de Leon. The schedule on this page shows every fee that applies to development in Ponce de Leon.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Holmes County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.