IMPACTFEES.ORG

Ponce de Leon, Florida Impact Fees

Ponce de Leon applies its own fee schedule. Holmes County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced ). The full breakdown is below.

Ponce de Leon impact fees by project type

Ponce de Leon: Single-Family Impact Fees

Ponce de Leon has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Sewer Connection Fee (Ponce de Leon) and Water Connection Fee (Ponce de Leon) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Ponce de Leon impact fee schedule
Water$0.00
  • Water Connection Fee (Ponce de Leon)
    Town of Ponce de Leon
    The Town of Ponce de Leon operates its own (contract-operated) water system. The Town publishes no connection or impact fee schedule; a connection charge likely exists but its amount is not publicly posted.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Ponce de Leon)
    Town of Ponce de Leon
    The Town of Ponce de Leon operates its own (contract-operated) sewer system. No connection or impact fee schedule is published. A CDBG grant for sewer-plant capacity expansion is pending; a new fee may follow on completion.
    Requires confirmation
City$0.00
  • City Impact Fee (Ponce de Leon)
    Town of Ponce de Leon
    The Town of Ponce de Leon levies no municipal development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Ponce de Leon)
    Holmes County
    Holmes County levies no county development impact fees applicable in the Town of Ponce de Leon.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked Official fee schedule:Town of Ponce de Leon
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Multifamily Impact Fees

Ponce de Leon has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.

Water Connection Fee (Ponce de Leon, MF) and Sewer Connection Fee (Ponce de Leon, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Ponce de Leon impact fee schedule
Water$0.00
  • Water Connection Fee (Ponce de Leon, MF)
    Town of Ponce de Leon
    The Town of Ponce de Leon operates its own (contract-operated) water system. The Town publishes no connection or impact fee schedule, and no per-unit multifamily basis is known.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Ponce de Leon, MF)
    Town of Ponce de Leon
    The Town of Ponce de Leon operates its own (contract-operated) sewer system. No connection or impact fee schedule is published. A CDBG grant for sewer-plant capacity expansion is pending; capacity is the binding constraint for a multifamily project, and a new fee may follow on completion.
    Requires confirmation
City$0.00
  • City Impact Fee (Ponce de Leon, MF)
    Town of Ponce de Leon
    The Town of Ponce de Leon levies no municipal development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Ponce de Leon, MF)
    Holmes County
    Holmes County levies no county development impact fees applicable in the Town of Ponce de Leon.
    $0.00
Total (Ponce de Leon): $0.00
Sources last checked Official fee schedule:Town of Ponce de Leon
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Commercial Impact Fees

Commercial development in Ponce de Leon pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Ponce de Leon) and Sewer Connection Fee (Town of Ponce de Leon) are set by the utility and not published online. City Impact Fee (Town of Ponce de Leon, Commercial) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Ponce de Leon impact fee schedule
Water$0.00
  • Water Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponce de Leon, Commercial) — none found
    Town of Ponce de Leon
    Requires confirmation
Total (Ponce de Leon): $0.00
Sources last checked Official fee schedule:Holmes County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Industrial Impact Fees

Industrial development in Ponce de Leon pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Ponce de Leon) and Sewer Connection Fee (Town of Ponce de Leon) are set by the utility and not published online. City Impact Fee (Town of Ponce de Leon, Industrial) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Ponce de Leon impact fee schedule
Water$0.00
  • Water Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponce de Leon, Industrial) — none found
    Town of Ponce de Leon
    Requires confirmation
Total (Ponce de Leon): $0.00
Sources last checked Official fee schedule:Holmes County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon: Office Impact Fees

Office development in Ponce de Leon pays no per-square-foot impact fees (rates sourced July 13, 2026).

Water Connection Fee (Town of Ponce de Leon) and Sewer Connection Fee (Town of Ponce de Leon) are set by the utility and not published online. City Impact Fee (Town of Ponce de Leon, Office) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Ponce de Leon impact fee schedule
Water$0.00
  • Water Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Ponce de Leon)
    Town of Ponce de Leon
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Ponce de Leon, Office) — none found
    Town of Ponce de Leon
    Requires confirmation
Total (Ponce de Leon): $0.00
Sources last checked Official fee schedule:Holmes County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce de Leon impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Ponce de Leon impact fee FAQs

How much are commercial impact fees in Ponce de Leon?

Ponce de Leon does not currently levy impact fees on commercial development.

Does Ponce de Leon charge its own impact fees?

Yes. Ponce de Leon levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Ponce de Leon. The schedule on this page shows every fee that applies to development in Ponce de Leon.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Holmes County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000