Noma, Florida Impact Fees

Noma applies its own fee schedule. Holmes County does not currently add county-level impact fees inside city limits. A new single-family home pays $1,500.00 per unit (rates sourced ). The full breakdown is below.

Noma Impact Fees by Project Type

Noma: Single-Family Impact Fees

A new single-family home in Noma pays $1,500.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Noma) ($750.00) and Sewer Connection Fee (Noma) ($750.00).

View the Full Noma Impact Fee Schedule
Water$750.00
  • Water Connection Fee (Noma)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new water or wastewater connection and may be adjusted to the actual installation cost; whether the base is charged once or separately for each service is not stated. The $150 water deposit is refundable and is not an impact fee. Noma charges no capacity or impact fee.
    $750.00
Sewer$750.00
  • Sewer Connection Fee (Noma)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new wastewater connection and may be adjusted to the actual installation cost; whether the base is charged once or separately for water and wastewater is not stated. Noma charges no capacity or impact fee.
    $750.00
City$0.00
  • City Impact Fee (Noma)
    Town of Noma
    The Town of Noma levies no transportation, parks, police, fire or other development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Noma)
    Holmes County
    Holmes County levies no development impact fees, including no school impact fee, in the Town of Noma.
    $0.00
Total (Noma): $1,500.00
Sources last checked Official fee schedules:Town of Noma (Noma Utility Services) Town of Noma Holmes County

Where in Holmes County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Noma: Multifamily Impact Fees

A new multifamily unit in Noma pays $1,500.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection Fee (Noma, MF) ($750.00) and Water Connection Fee (Noma, MF) ($750.00).

View the Full Noma Impact Fee Schedule
Water$750.00
  • Water Connection Fee (Noma, MF)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to each new water connection and may be adjusted to the actual installation cost. The Town Code requires a separate meter for each residential unit, so each multifamily unit is its own connection. The $150 water deposit is refundable. Noma charges no capacity or impact fee.
    $750.00
Sewer$750.00
  • Sewer Connection Fee (Noma, MF)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to each new wastewater connection and may be adjusted to the actual installation cost. The Town Code requires a separate meter for each residential unit, so each multifamily unit is its own connection. Noma charges no capacity or impact fee.
    $750.00
City$0.00
  • City Impact Fee (Noma, MF)
    Town of Noma
    The Town of Noma levies no transportation, parks, police, fire or other development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Noma, MF)
    Holmes County
    Holmes County levies no development impact fees, including no school impact fee, on multifamily development in the Town of Noma.
    $0.00
Total (Noma): $1,500.00
Sources last checked Official fee schedules:Town of Noma (Noma Utility Services) Town of Noma Holmes County

Where in Holmes County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Noma: Commercial Impact Fees

Commercial development in Noma pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $1,500.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Town of Noma — Noma Utility Services) and Sewer Connection Fee (Town of Noma — Noma Utility Services) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Noma Impact Fee Schedule
Water$750.00 one-time
  • Water Connection Fee (Town of Noma — Noma Utility Services)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new water connection and may be adjusted to the actual installation cost. The Town Code provides for meter connection charges by meter size set by Council resolution, but no larger-meter schedule is published, so a commercial connection on a larger meter can cost more. Whether the base fee is charged once or separately for water and wastewater is not stated. The $150 water deposit is refundable and is not an impact fee. Noma charges no capacity or impact fee.
    $750.00 one-timeRequires confirmation
Sewer$750.00 one-time
  • Sewer Connection Fee (Town of Noma — Noma Utility Services)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new wastewater connection and may be adjusted to the actual installation cost. The Town Code provides for meter connection charges by meter size set by Council resolution, but no larger-meter schedule is published, so a commercial connection can cost more. Whether the base fee is charged once or separately for water and wastewater is not stated. Noma charges no capacity or impact fee.
    $750.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Noma): $1,500.00 one-time (≈ $1,500.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Noma (Noma Utility Services) Town of Noma Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Noma: Industrial Impact Fees

Industrial development in Noma pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $1,500.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Town of Noma — Noma Utility Services) and Sewer Connection Fee (Town of Noma — Noma Utility Services) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Noma Impact Fee Schedule
Water$750.00 one-time
  • Water Connection Fee (Town of Noma — Noma Utility Services)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new water connection and may be adjusted to the actual installation cost. The Town Code provides for meter connection charges by meter size set by Council resolution, but no larger-meter schedule is published, so a commercial connection on a larger meter can cost more. Whether the base fee is charged once or separately for water and wastewater is not stated. The $150 water deposit is refundable and is not an impact fee. Noma charges no capacity or impact fee.
    $750.00 one-timeRequires confirmation
Sewer$750.00 one-time
  • Sewer Connection Fee (Town of Noma — Noma Utility Services)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new wastewater connection and may be adjusted to the actual installation cost. The Town Code provides for meter connection charges by meter size set by Council resolution, but no larger-meter schedule is published, so a commercial connection can cost more. Whether the base fee is charged once or separately for water and wastewater is not stated. Noma charges no capacity or impact fee.
    $750.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Noma): $1,500.00 one-time (≈ $1,500.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Noma (Noma Utility Services) Town of Noma Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Noma: Office Impact Fees

Office development in Noma pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $1,500.00. The calculator below adjusts to your exact square footage.

Water Connection Fee (Town of Noma — Noma Utility Services) and Sewer Connection Fee (Town of Noma — Noma Utility Services) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Noma Impact Fee Schedule
Water$750.00 one-time
  • Water Connection Fee (Town of Noma — Noma Utility Services)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new water connection and may be adjusted to the actual installation cost. The Town Code provides for meter connection charges by meter size set by Council resolution, but no larger-meter schedule is published, so a commercial connection on a larger meter can cost more. Whether the base fee is charged once or separately for water and wastewater is not stated. The $150 water deposit is refundable and is not an impact fee. Noma charges no capacity or impact fee.
    $750.00 one-timeRequires confirmation
Sewer$750.00 one-time
  • Sewer Connection Fee (Town of Noma — Noma Utility Services)
    Town of Noma (Noma Utility Services)
    The Town of Noma operates its own water and wastewater systems. A $750.00 base connection fee applies to a new wastewater connection and may be adjusted to the actual installation cost. The Town Code provides for meter connection charges by meter size set by Council resolution, but no larger-meter schedule is published, so a commercial connection can cost more. Whether the base fee is charged once or separately for water and wastewater is not stated. Noma charges no capacity or impact fee.
    $750.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Noma): $1,500.00 one-time (≈ $1,500.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Noma (Noma Utility Services) Town of Noma Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Noma Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Noma Impact Fee FAQs

What are the total impact fees for a single-family home in Noma, Florida?

A new single-family home in Noma pays $1,500.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Noma?

Commercial development in Noma pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Noma charge its own impact fees?

Yes. Noma levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Noma. The schedule on this page shows every fee that applies to development in Noma.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Holmes County impact fees page.