Westville impact fees by project type
Westville: Single-Family Impact Fees
Westville has no published impact fee amounts for a new single-family home (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Westville) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Westville impact fee schedule
- Water Connection Fee (Westville)Requires confirmationTown of WestvilleThe Town of Westville operates water/sewer as a utility (per its own FY2023 financials), so a connection charge very likely exists, but the Town publishes no fee schedule and the amount is not publicly available.
- Sewer Connection Fee (Westville)$0.00Town of WestvilleThe Town of Westville does not operate a sanitary sewer system, so there is no sewer connection fee. State wastewater facility records for Holmes County list treatment facilities only at Bonifay, Ponce de Leon, Noma and a school, with none in Westville. New homes in Westville are served by on-site septic systems.
- City Impact Fee (Westville)$0.00Town of WestvilleThe Town of Westville levies no municipal development impact fees.
- County Impact Fee (Westville)$0.00Holmes CountyHolmes County levies no county development impact fees applicable in the Town of Westville.
Where in Holmes County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westville: Multifamily Impact Fees
Westville has no published impact fee amounts for a new multifamily unit (rates sourced July 13, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Westville, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Westville impact fee schedule
- Water Connection Fee (Westville, MF)Requires confirmationTown of WestvilleThe Town of Westville operates water/sewer as a utility (per its own FY2023 financials), so a connection charge very likely exists, but the Town publishes no fee schedule and no per-unit multifamily basis is available.
- Sewer Connection Fee (Westville, MF)$0.00Town of WestvilleThe Town of Westville does not operate a sanitary sewer system, so there is no sewer connection fee for multifamily or any other development. State wastewater facility records for Holmes County list treatment facilities only at Bonifay, Ponce de Leon, Noma and a school, with none in Westville. Development in Westville is served by on-site septic systems.
- City Impact Fee (Westville, MF)$0.00Town of WestvilleThe Town of Westville levies no municipal development impact fees.
- County Impact Fee (Westville, MF)$0.00Holmes CountyHolmes County levies no county development impact fees applicable in the Town of Westville.
Where in Holmes County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westville: Commercial Impact Fees
Commercial development in Westville pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Connection Fee (Town of Westville) and Sewer Connection Fee (Town of Westville) are set by the utility and not published online. City Impact Fee (Town of Westville, Commercial) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Westville impact fee schedule
- Water Connection Fee (Town of Westville)Requires confirmationTown of Westville
- Sewer Connection Fee (Town of Westville)Requires confirmationTown of Westville
- City Impact Fee (Town of Westville, Commercial) — none foundRequires confirmationTown of Westville
- $0.00
Where in Holmes County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westville: Industrial Impact Fees
Industrial development in Westville pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Connection Fee (Town of Westville) and Sewer Connection Fee (Town of Westville) are set by the utility and not published online. City Impact Fee (Town of Westville, Industrial) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Westville impact fee schedule
- Water Connection Fee (Town of Westville)Requires confirmationTown of Westville
- Sewer Connection Fee (Town of Westville)Requires confirmationTown of Westville
- City Impact Fee (Town of Westville, Industrial) — none foundRequires confirmationTown of Westville
- $0.00
Where in Holmes County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westville: Office Impact Fees
Office development in Westville pays no per-square-foot impact fees (rates sourced July 13, 2026).
Water Connection Fee (Town of Westville) and Sewer Connection Fee (Town of Westville) are set by the utility and not published online. City Impact Fee (Town of Westville, Office) — none found is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Westville impact fee schedule
- Water Connection Fee (Town of Westville)Requires confirmationTown of Westville
- Sewer Connection Fee (Town of Westville)Requires confirmationTown of Westville
- City Impact Fee (Town of Westville, Office) — none foundRequires confirmationTown of Westville
- $0.00
Where in Holmes County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Westville impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Westville impact fee FAQs
How much are commercial impact fees in Westville?
Westville does not currently levy impact fees on commercial development.
Does Westville charge its own impact fees?
Yes. Westville levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Westville. The schedule on this page shows every fee that applies to development in Westville.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Holmes County impact fees page.