IMPACTFEES.ORG

Esto, Florida Impact Fees

Esto applies its own fee schedule. Holmes County does not currently add county-level impact fees inside city limits. A new single-family home pays $250.00 per unit (rates sourced ). The full breakdown is below.

Esto impact fees by project type

Esto: Single-Family Impact Fees

A new single-family home in Esto pays $250.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Installation Fee (Town of Esto) ($250.00).

View the full Esto impact fee schedule
Water$250.00
  • Water Meter Installation Fee (Town of Esto)
    Town of Esto (Esto Water Works)
    The Town of Esto operates its own water system (no municipal sewer). A $250.00 meter installation fee is due at time of service; a separate tap-in fee is charged at estimated cost (installation at the customer's expense). The $150 security deposit is refundable and is not an impact fee. No system capacity/impact fee exists. Rates are reviewed annually.
    $250.00
Sewer$0.00
  • Sewer Connection Fee (Town of Esto)
    Town of Esto
    The Town of Esto has no municipal sewer system; wastewater is handled by private septic. No sewer connection or impact fee applies.
    $0.00
City$0.00
  • City Impact Fee (Esto)
    Town of Esto
    The Town of Esto levies no municipal development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Esto)
    Holmes County
    Holmes County levies no county development impact fees applicable in the Town of Esto.
    $0.00
Total (Esto): $250.00
Sources last checked Official fee schedule:Town of Esto (Esto Water Works)

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Multifamily Impact Fees

A new multifamily unit in Esto pays $250.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Installation Fee (Town of Esto, MF) ($250.00).

View the full Esto impact fee schedule
Water$250.00
  • Water Meter Installation Fee (Town of Esto, MF)
    Town of Esto (Esto Water Works)
    The Town of Esto operates its own water system (no municipal sewer). A $250.00 meter installation fee is charged per meter, due at time of service; a master-metered multifamily building pays once per meter, not per unit. A separate tap-in fee is charged at estimated cost. No system capacity/impact fee exists.
    $250.00
Sewer$0.00
  • Sewer Connection Fee (Town of Esto, MF)
    Town of Esto
    The Town of Esto has no municipal sewer system; wastewater is handled by private septic. No sewer connection or impact fee applies.
    $0.00
City$0.00
  • City Impact Fee (Esto, MF)
    Town of Esto
    The Town of Esto levies no municipal development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Esto, MF)
    Holmes County
    Holmes County levies no county development impact fees applicable in the Town of Esto.
    $0.00
Total (Esto): $250.00
Sources last checked Official fee schedule:Town of Esto (Esto Water Works)

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Commercial Impact Fees

Commercial development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

Water Meter Installation Fee (Town of Esto) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full Esto impact fee schedule
Water$250.00 one-time
Total (Esto): $250.00 one-time (≈ $250.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Esto (Esto Water Works) Town of Esto Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Industrial Impact Fees

Industrial development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

Water Meter Installation Fee (Town of Esto) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full Esto impact fee schedule
Water$250.00 one-time
Total (Esto): $250.00 one-time (≈ $250.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Esto (Esto Water Works) Town of Esto Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Office Impact Fees

Office development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

Water Meter Installation Fee (Town of Esto) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full Esto impact fee schedule
Water$250.00 one-time
Total (Esto): $250.00 one-time (≈ $250.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Esto (Esto Water Works) Town of Esto Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Esto impact fee FAQs

What are the total impact fees for a single-family home in Esto, Florida?

A new single-family home in Esto pays $250.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Esto?

Commercial development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Esto charge its own impact fees?

Yes. Esto levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Esto. The schedule on this page shows every fee that applies to development in Esto.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Holmes County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000