IMPACTFEES.ORG

Esto, Florida Impact Fees

Esto applies its own fee schedule. Holmes County does not currently add county-level impact fees inside city limits. A new single-family home pays $250.00 per unit (rates sourced July 13, 2026). The full breakdown is below.

Esto impact fees by project type

Esto: Single-Family Impact Fees

A new single-family home in Esto pays $250.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter Installation Fee (Town of Esto) ($250.00).

View the full fee schedule
Water$250.00
  • Water Meter Installation Fee (Town of Esto)
    Town of Esto (Esto Water Works)
    CONFIRMED 7/12/2026 against the Town's posted Water Rates page. Meter Installation Fee $250.00, due at time of service. A separate Tap-In Fee is charged at cost estimate (variable — installation at customer's expense). $150 security deposit is refundable (not an impact fee). No system capacity/impact fee exists. Esto has no sewer system. Rates reviewed annually under the Town's Revenue Plan (FRWA, 2021) — recheck each cycle.
    $250.00
Sewer$0.00
  • Sewer Connection Fee (Town of Esto)
    Town of Esto
    No public sewer system in Town of Esto. Wastewater handled by private septic systems.
    $0.00
City$0.00
  • City Impact Fee (Esto)
    Town of Esto
    No city development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Esto)
    Holmes County
    No county development impact fees.
    $0.00
Total (Esto): $250.00
Sources last checked July 13, 2026Official fee schedule:Town of Esto (Esto Water Works)

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Multifamily Impact Fees

A new multifamily unit in Esto pays $250.00 per unit in impact fees (rates sourced July 13, 2026). Every line item is levied at the municipal or utility level.

Water Meter Installation Fee (Town of Esto, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$250.00
  • Water Meter Installation Fee (Town of Esto, MF)
    Town of Esto (Esto Water Works)
    Source confirmed 7/12/2026 against the Town's posted Water Rates page: Meter Installation Fee $250.00, due at time of service; separate Tap-In Fee charged at cost estimate (variable). No system capacity/impact fee exists; Esto has no sewer. UNCONFIRMED for MF: $250 is per METER, not per dwelling unit — a master-metered apartment building would pay once, and no per-unit MF basis is published. Rates reviewed annually under the Town's Revenue Plan. Call Town Hall: (850) 263-6521.
    $250.00Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Esto, MF)
    Town of Esto
    No public sewer system in Town of Esto. Wastewater handled by private septic systems.
    $0.00
City$0.00
  • City Impact Fee (Esto, MF)
    Town of Esto
    No city development impact fees.
    $0.00
County$0.00
  • County Impact Fee (Esto, MF)
    Holmes County
    No county development impact fees.
    $0.00
Total (Esto): $250.00
Sources last checked July 13, 2026Official fee schedule:Town of Esto (Esto Water Works)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Commercial Impact Fees

Commercial development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

Water Meter Installation Fee (Town of Esto) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$250.00 one-time
  • Water Meter Installation Fee (Town of Esto)
    Town of Esto (Esto Water Works)
    Confirmed 2026-07-13 against the Town's posted Water Rates page (the adopted schedule; rates reviewed annually under the Town's 2021 FRWA Revenue Plan). The page states the water system serves 'all residents and businesses' but publishes ONE Meter Installation Fee of $250.00 with NO meter-size ladder and NO nonresidential differentiation. There is NO system capacity/impact fee. A separate Tap-In Fee is quoted at cost estimate ('Installation at customer's expense') — variable, not enterable. $150 security deposit is refundable (not an impact fee). UNCONFIRMED: because no larger/commercial meter tier is published, a nonres connection above a standard residential meter is likely quoted at cost rather than at $250 — confirm with Esto Town Clerk (850) 263-6521, EstoTownClerk@gmail.com.
    $250.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Esto) — no public sewer system
    Town of Esto
    CONFIRMED $0 — the Town of Esto operates NO public sewer system. Esto Water Works is water-only; the Town's utility pages, ordinance list, and rate schedule contain no wastewater service or connection fee. Nonresidential wastewater in Esto is handled by private on-site septic, permitted through the Holmes County Building Department / FL DOH. Not a data gap: no sewer connection fee exists to collect.
    $0.00
City$0.00
  • City Impact Fee (Town of Esto, Commercial) — none levied
    Town of Esto
    CONFIRMED $0 — the Town of Esto levies NO municipal development impact fee. Proved 2026-07-13 against the Town's complete published ordinance list: Esto's adopted ordinances cover nuisances (01-02, 07-17), smoking/vaping in parks (2025-01), an electric franchise (2025-02), public-infrastructure damage (2025-03), and business tax (2025-04) — there is no impact-fee ordinance of any kind, and no transportation, parks, police, or fire impact fee. The Town has no building department; nonresidential construction in Esto is permitted through the Holmes County Building Department. Esto's water utility fees are recorded separately in the Water Sewer Fees - Nonresidential table.
    $0.00
County$0.00
  • County Impact Fee (Holmes County, Commercial) — none levied
    Holmes County
    CONFIRMED $0 — Holmes County levies NO impact fee of any kind, in the unincorporated area or inside any municipality. Proved 2026-07-13 against the Clerk of Court's COMPLETE county ordinance index (1972–2026, no impact-fee ordinance) and the County LDRs (updated 2009, no impact-fee article). Only county development charges are cost-recovery building permit/inspection fees. No interlocal question arises — there is no county fee to extend into the Town. WATCH: Ord. 26-03 (6/16/2026) data-center moratorium; recheck each cycle.
    $0.00
Total (Esto): $250.00 one-time (≈ $250.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:Town of Esto (Esto Water Works) Town of Esto Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Industrial Impact Fees

Industrial development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

Water Meter Installation Fee (Town of Esto) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$250.00 one-time
  • Water Meter Installation Fee (Town of Esto)
    Town of Esto (Esto Water Works)
    Confirmed 2026-07-13 against the Town's posted Water Rates page (the adopted schedule; rates reviewed annually under the Town's 2021 FRWA Revenue Plan). The page states the water system serves 'all residents and businesses' but publishes ONE Meter Installation Fee of $250.00 with NO meter-size ladder and NO nonresidential differentiation. There is NO system capacity/impact fee. A separate Tap-In Fee is quoted at cost estimate ('Installation at customer's expense') — variable, not enterable. $150 security deposit is refundable (not an impact fee). UNCONFIRMED: because no larger/commercial meter tier is published, a nonres connection above a standard residential meter is likely quoted at cost rather than at $250 — confirm with Esto Town Clerk (850) 263-6521, EstoTownClerk@gmail.com.
    $250.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Esto) — no public sewer system
    Town of Esto
    CONFIRMED $0 — the Town of Esto operates NO public sewer system. Esto Water Works is water-only; the Town's utility pages, ordinance list, and rate schedule contain no wastewater service or connection fee. Nonresidential wastewater in Esto is handled by private on-site septic, permitted through the Holmes County Building Department / FL DOH. Not a data gap: no sewer connection fee exists to collect.
    $0.00
City$0.00
  • City Impact Fee (Town of Esto, Industrial) — none levied
    Town of Esto
    CONFIRMED $0 — the Town of Esto levies NO municipal development impact fee. Proved 2026-07-13 against the Town's complete published ordinance list (nuisances, park smoking, electric franchise, infrastructure damage, business tax — no impact-fee ordinance). No building department; nonres construction permitted through the Holmes County Building Department. Water utility fees recorded separately in the W/S table.
    $0.00
County$0.00
  • County Impact Fee (Holmes County, Industrial) — none levied
    Holmes County
    CONFIRMED $0 — Holmes County levies NO impact fee of any kind, in the unincorporated area or inside any municipality. Proved 2026-07-13 against the Clerk of Court's COMPLETE county ordinance index (1972–2026) and the County LDRs (updated 2009). Only county development charges are cost-recovery building permit/inspection fees. WATCH: Ord. 26-03 (6/16/2026) moratorium on large-load customer facilities and data centers — an infrastructure fee could follow; recheck each cycle.
    $0.00
Total (Esto): $250.00 one-time (≈ $250.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:Town of Esto (Esto Water Works) Town of Esto Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Esto: Office Impact Fees

Office development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $250.00. The calculator below adjusts to your exact square footage.

Water Meter Installation Fee (Town of Esto) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$250.00 one-time
  • Water Meter Installation Fee (Town of Esto)
    Town of Esto (Esto Water Works)
    Confirmed 2026-07-13 against the Town's posted Water Rates page (the adopted schedule; rates reviewed annually under the Town's 2021 FRWA Revenue Plan). The page states the water system serves 'all residents and businesses' but publishes ONE Meter Installation Fee of $250.00 with NO meter-size ladder and NO nonresidential differentiation. There is NO system capacity/impact fee. A separate Tap-In Fee is quoted at cost estimate ('Installation at customer's expense') — variable, not enterable. $150 security deposit is refundable (not an impact fee). UNCONFIRMED: because no larger/commercial meter tier is published, a nonres connection above a standard residential meter is likely quoted at cost rather than at $250 — confirm with Esto Town Clerk (850) 263-6521, EstoTownClerk@gmail.com.
    $250.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Esto) — no public sewer system
    Town of Esto
    CONFIRMED $0 — the Town of Esto operates NO public sewer system. Esto Water Works is water-only; the Town's utility pages, ordinance list, and rate schedule contain no wastewater service or connection fee. Nonresidential wastewater in Esto is handled by private on-site septic, permitted through the Holmes County Building Department / FL DOH. Not a data gap: no sewer connection fee exists to collect.
    $0.00
City$0.00
  • City Impact Fee (Town of Esto, Office) — none levied
    Town of Esto
    CONFIRMED $0 — the Town of Esto levies NO municipal development impact fee. Proved 2026-07-13 against the Town's complete published ordinance list (nuisances, park smoking, electric franchise, infrastructure damage, business tax — no impact-fee ordinance). No building department; nonres construction permitted through the Holmes County Building Department. Water utility fees recorded separately in the W/S table.
    $0.00
County$0.00
  • County Impact Fee (Holmes County, Office) — none levied
    Holmes County
    CONFIRMED $0 — Holmes County levies NO impact fee of any kind, in the unincorporated area or inside any municipality. Proved 2026-07-13 against the Clerk of Court's COMPLETE county ordinance index (1972–2026) and the County LDRs (updated 2009). Only county development charges are cost-recovery building permit/inspection fees. WATCH: Ord. 26-03 (6/16/2026) data-center moratorium; recheck each cycle.
    $0.00
Total (Esto): $250.00 one-time (≈ $250.00 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:Town of Esto (Esto Water Works) Town of Esto Holmes County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Holmes County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Esto

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Esto, Florida?

A new single-family home in Esto pays $250.00 per unit in combined impact fees (rates sourced July 13, 2026).

How much are commercial impact fees in Esto?

Commercial development in Esto pays no per-square-foot impact fees, but owes $250.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Esto charge its own impact fees?

Yes. Esto levies its own municipal impact or utility fees. Holmes County does not currently add county-level impact fees inside Esto. The schedule on this page shows every fee that applies to development in Esto.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Holmes County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000