Cedar Key, Florida Impact Fees

Cedar Key applies its own fee schedule: municipal fees plus the Levy County-levied fees that apply inside city limits. Combined, a new single-family home pays $7,500.00 per unit (rates sourced July 14, 2026). The full breakdown is below.

Cedar Key impact fees by project type

Cedar Key: Single-Family Impact Fees

A new single-family home in Cedar Key pays $7,500.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Cedar Key Water and Sewer District) ($4,020.00) and Sewer Connection Fee (Cedar Key Water and Sewer District) ($3,480.00).

View the full fee schedule
Water$4,020.00
  • Water Connection Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    CONFIRMED 7/12/2026 from CKWSD Codified District Resolutions (version 5.14.2024), read via Google Docs viewer. Water and sewer provided by CKWSD (special district), not the City. Buildup for a new SFR: Sec. 4.04.C Table 1 Capital Facilities Charge — 'Existing and new single family homes with water-conserving plumbing fixtures, per unit' = $720 water (240 gpd max demand); PLUS Sec. 5.04.F Tap Fee for initial water connection = $3,000; PLUS Sec. 5.04.I / Sec. 4.04 Table 2 charge for a new 5/8x3/4 water meter = $300. Total $4,020. (Table 1 row 1, $1,200, applies only to EXISTING homes with conventional non-conserving fixtures — not new construction.) Tap fee is subject to the line-extension rules in Sec. 4.05. History: Resolutions 99-01, 2008-06, 2009-05, 2010-12, 2011-03, 2013-05, 2020-01, 2021-01, 2021-03, 2023-2. Contact: CKWSD, 352-543-5285.
    $4,020.00
Sewer$3,480.00
  • Sewer Connection Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    CONFIRMED 7/12/2026 from CKWSD Codified District Resolutions (version 5.14.2024), read via Google Docs viewer. Buildup for a new SFR: Sec. 4.04.C Table 1 Capital Facilities Charge — 'Existing and new single family homes with water-conserving plumbing fixtures, per unit' = $480 sewer (120 gpd avg demand); PLUS Sec. 5.04.G Tap Fee for initial wastewater connection = $3,000. Total $3,480. (Table 1 row 1, $800, applies only to EXISTING homes with conventional non-conserving fixtures.) Tap fee subject to line-extension rules in Sec. 4.05. Contact: CKWSD, 352-543-5285.
    $3,480.00
City$0.00
  • City Impact Fee (City of Cedar Key)
    City of Cedar Key
    No city-level impact fees found. Cedar Key is a small island city (~700 pop). Water/sewer provided by CKWSD special district, not city. No impact fee chapter found in research. Researched June 2026.
    $0.00
Total (Cedar Key): $7,500.00
Sources last checked July 14, 2026Official fee schedule:Cedar Key Water and Sewer District

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Key: Multifamily Impact Fees

A new multifamily unit in Cedar Key pays $1,500.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Cedar Key Water and Sewer District, MF) ($1,020.00) and Sewer Connection Fee (Cedar Key Water and Sewer District, MF) ($480.00).

View the full fee schedule
Water$1,020.00
  • Water Connection Fee (Cedar Key Water and Sewer District, MF)
    Cedar Key Water and Sewer District
    CONFIRMED 7/12/2026 from CKWSD Codified District Resolutions (v. 5.14.2024), read via Google Docs viewer. PER-UNIT MF basis: Sec. 4.04.C Table 1 has its own multifamily row — 'Multi-family including condominiums, condo-motels, apartments, duplexes; per unit' = $720 water Capital Facilities Charge (240 gpd max demand), which happens to equal the water-conserving SFR rate by design (same demand assumption), NOT a copy of the SFR figure. Sec. 4.04.D.1.a requires a SEPARATE METER for each individual residential unit in an apartment building or condominium, so the $300 new-meter charge (Sec. 5.04.I / Table 2) applies per unit: $720 + $300 = $1,020/unit. NOTE: the $3,000 Sec. 5.04.F water tap fee is charged once per initial connection to the property, not per unit, so it is excluded from the per-unit rate. Sec. 4.04.D.2.b permits a single master meter for multi-family at the owner's option, which would drop the per-unit meter charge. Contact: CKWSD, 352-543-5285.
    $1,020.00
Sewer$480.00
  • Sewer Connection Fee (Cedar Key Water and Sewer District, MF)
    Cedar Key Water and Sewer District
    CONFIRMED 7/12/2026 from CKWSD Codified District Resolutions (v. 5.14.2024). PER-UNIT MF basis: Sec. 4.04.C Table 1 multifamily row — 'Multi-family including condominiums, condo-motels, apartments, duplexes; per unit' = $480 sewer Capital Facilities Charge (120 gpd avg flow). Equals the water-conserving SFR sewer rate by design (identical demand assumption), not a copied figure. The $3,000 Sec. 5.04.G wastewater tap fee is charged once per initial connection to the property, not per unit, so it is excluded from the per-unit rate. Contact: CKWSD, 352-543-5285.
    $480.00
City$0.00
  • City Impact Fee (City of Cedar Key)
    City of Cedar Key
    No city-level impact fees found. Cedar Key is a small island city (~700 pop). Water/sewer by CKWSD (special district). No impact fee chapter found. Researched June 2026.
    $0.00
Total (Cedar Key): $1,500.00
Sources last checked July 14, 2026Official fee schedule:Cedar Key Water and Sewer District

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Key: Commercial Impact Fees

Commercial development in Cedar Key pays $0.08 per square foot in impact fees, plus $7,500.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $11,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District) ($4,020.00 one-time), Sewer Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District) ($3,480.00 one-time) and Emergency Medical System Impact Fee (Levy County, Commercial) ($0.08/sq ft).

View the full fee schedule
Water$4,020.00 one-time
  • Water Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    Water/sewer in Cedar Key is provided by CKWSD (independent special district), NOT the city. Source: CKWSD Codified Resolutions v. 5.14.2024, read via pdf.js 2026-07-13. NOT meter-size based — CKWSD prices by ESTIMATED DEMAND. Sec. 4.04.C Table 1 row 7 'Retail commercial, no food service': MINIMUM up to 1,000 sq ft = 240 gpd max-day demand = $720.00 water capital facilities charge; ADDITIONAL above 1,000 sq ft = 0.24 gpd/sq ft = $0.72 per sq ft. Plus Sec. 5.04.F Tap Fee for initial water connection $3,000.00 and Sec. 5.04.I new water meter $300.00. Amount entered = the PUBLISHED MINIMUM buildup for a nonres connection ≤ 1,000 sq ft: $720 + $3,000 + $300 = $4,020. Larger buildings add $0.72/sq ft above 1,000 sq ft. Uses NOT in Table 1 (incl. offices and industrial) are charged by District-estimated demand at $3.00 per gallon of estimated maximum day demand. Only other nonres Table 1 rows: motels ($360/room), motels w/ kitchenettes ($480/room), restaurants ($60/seat). Tap fee subject to line-extension rules (Sec. 4.05). Contact: CKWSD, (352) 543-5285.
    $4,020.00 one-time
Sewer$3,480.00 one-time
  • Sewer Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    Source: CKWSD Codified Resolutions v. 5.14.2024 (read via pdf.js 2026-07-13). Demand-based, not meter-based. Sec. 4.04.C Table 1 row 7 'Retail commercial, no food service': MINIMUM up to 1,000 sq ft = 120 gpd average daily flow = $480.00 sewer capital facilities charge; ADDITIONAL above 1,000 sq ft = 0.12 gpd/sq ft = $0.48 per sq ft. Plus Sec. 5.04.G Tap Fee for initial wastewater connection $3,000.00. Amount entered = published MINIMUM: $480 + $3,000 = $3,480 for a nonres connection ≤ 1,000 sq ft; add $0.48/sq ft above 1,000. Uses not in Table 1 (offices, industrial) are charged by District-estimated demand at $4.00 per gallon of estimated average daily flow. Tap fee subject to line-extension rules (Sec. 4.05). Contact: CKWSD, (352) 543-5285.
    $3,480.00 one-time
City$0.00
  • City Impact Fee (City of Cedar Key, Commercial)
    City of Cedar Key
    Confirmed $0 — Cedar Key levies no municipal impact fee. Proved from the city's own Chapter Five (Schedule of Fees, Rates and Charges), read in full 2026-07-13: the word 'impact' does not appear anywhere in it (building permit, zoning, licensing and utility-billing fees only). The city code has six chapters and none is an impact-fee chapter. Water/sewer is provided by Cedar Key Water and Sewer District (special district), not the city.
    $0.00
County$0.08/sq ft
  • Emergency Medical System Impact Fee (Levy County, Commercial)
    Levy County
    County fee collected inside the City of Cedar Key. Levy County Code Ch. 47 Art. III, Sec. 47-49(b) — schedule row 'Commercial $0.08 per square foot'. Countywide per §47-47(a)/§47-49(a) (EMS is exclusively county-provided). Basis: GFA (§47-2). Not indexed.
    $0.08/sq ft
  • Road Impact Fee (Levy County, Commercial)
    Levy County
    Confirmed $0 inside the City of Cedar Key — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)); no municipal interlocal. Unincorporated rates for reference: Commercial $1,710 / Office $1,481 / Industrial $640 per 1,000 sq ft.
    $0.00
Total (Cedar Key): $0.08/sq ft + $7,500.00 one-time (≈ $11,500.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Cedar Key Water and Sewer District City of Cedar Key Levy County

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Key: Industrial Impact Fees

Industrial development in Cedar Key pays $0.08 per square foot in impact fees, plus $7,500.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $11,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District) ($4,020.00 one-time) and Sewer Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District) ($3,480.00 one-time).

Emergency Medical System Impact Fee (Levy County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$4,020.00 one-time
  • Water Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    Water/sewer in Cedar Key is provided by CKWSD (independent special district), NOT the city. Source: CKWSD Codified Resolutions v. 5.14.2024, read via pdf.js 2026-07-13. NOT meter-size based — CKWSD prices by ESTIMATED DEMAND. Sec. 4.04.C Table 1 row 7 'Retail commercial, no food service': MINIMUM up to 1,000 sq ft = 240 gpd max-day demand = $720.00 water capital facilities charge; ADDITIONAL above 1,000 sq ft = 0.24 gpd/sq ft = $0.72 per sq ft. Plus Sec. 5.04.F Tap Fee for initial water connection $3,000.00 and Sec. 5.04.I new water meter $300.00. Amount entered = the PUBLISHED MINIMUM buildup for a nonres connection ≤ 1,000 sq ft: $720 + $3,000 + $300 = $4,020. Larger buildings add $0.72/sq ft above 1,000 sq ft. Uses NOT in Table 1 (incl. offices and industrial) are charged by District-estimated demand at $3.00 per gallon of estimated maximum day demand. Only other nonres Table 1 rows: motels ($360/room), motels w/ kitchenettes ($480/room), restaurants ($60/seat). Tap fee subject to line-extension rules (Sec. 4.05). Contact: CKWSD, (352) 543-5285.
    $4,020.00 one-time
Sewer$3,480.00 one-time
  • Sewer Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    Source: CKWSD Codified Resolutions v. 5.14.2024 (read via pdf.js 2026-07-13). Demand-based, not meter-based. Sec. 4.04.C Table 1 row 7 'Retail commercial, no food service': MINIMUM up to 1,000 sq ft = 120 gpd average daily flow = $480.00 sewer capital facilities charge; ADDITIONAL above 1,000 sq ft = 0.12 gpd/sq ft = $0.48 per sq ft. Plus Sec. 5.04.G Tap Fee for initial wastewater connection $3,000.00. Amount entered = published MINIMUM: $480 + $3,000 = $3,480 for a nonres connection ≤ 1,000 sq ft; add $0.48/sq ft above 1,000. Uses not in Table 1 (offices, industrial) are charged by District-estimated demand at $4.00 per gallon of estimated average daily flow. Tap fee subject to line-extension rules (Sec. 4.05). Contact: CKWSD, (352) 543-5285.
    $3,480.00 one-time
City$0.00
  • City Impact Fee (City of Cedar Key, Industrial)
    City of Cedar Key
    Confirmed $0 — Cedar Key levies no municipal impact fee. Proved from the city's Chapter Five (Schedule of Fees, Rates and Charges), read in full 2026-07-13: no occurrence of 'impact' anywhere in the schedule.
    $0.00
County$0.08/sq ft
  • Emergency Medical System Impact Fee (Levy County, Industrial)
    Levy County
    UNCONFIRMED (applicability). County fee collected inside the City of Cedar Key. §47-49(b) has no Industrial row; manufacturing is priced by the county manager under §47-53(a). $0.08/sq ft (Commercial/nearest analog) entered pending confirmation. Confirm with Levy County Development Dept., (352) 486-5203.
    $0.08/sq ftRequires confirmation
  • Road Impact Fee (Levy County, Industrial)
    Levy County
    Confirmed $0 inside the City of Cedar Key — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)). Unincorporated Industrial rate for reference: $640 per 1,000 sq ft.
    $0.00
Total (Cedar Key): $0.08/sq ft + $7,500.00 one-time (≈ $11,500.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Cedar Key Water and Sewer District City of Cedar Key Levy County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Key: Office Impact Fees

Office development in Cedar Key pays $0.08 per square foot in impact fees, plus $7,500.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $9,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District) ($4,020.00 one-time), Sewer Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District) ($3,480.00 one-time) and Emergency Medical System Impact Fee (Levy County, Office) ($0.08/sq ft).

View the full fee schedule
Water$4,020.00 one-time
  • Water Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    Water/sewer in Cedar Key is provided by CKWSD (independent special district), NOT the city. Source: CKWSD Codified Resolutions v. 5.14.2024, read via pdf.js 2026-07-13. NOT meter-size based — CKWSD prices by ESTIMATED DEMAND. Sec. 4.04.C Table 1 row 7 'Retail commercial, no food service': MINIMUM up to 1,000 sq ft = 240 gpd max-day demand = $720.00 water capital facilities charge; ADDITIONAL above 1,000 sq ft = 0.24 gpd/sq ft = $0.72 per sq ft. Plus Sec. 5.04.F Tap Fee for initial water connection $3,000.00 and Sec. 5.04.I new water meter $300.00. Amount entered = the PUBLISHED MINIMUM buildup for a nonres connection ≤ 1,000 sq ft: $720 + $3,000 + $300 = $4,020. Larger buildings add $0.72/sq ft above 1,000 sq ft. Uses NOT in Table 1 (incl. offices and industrial) are charged by District-estimated demand at $3.00 per gallon of estimated maximum day demand. Only other nonres Table 1 rows: motels ($360/room), motels w/ kitchenettes ($480/room), restaurants ($60/seat). Tap fee subject to line-extension rules (Sec. 4.05). Contact: CKWSD, (352) 543-5285.
    $4,020.00 one-time
Sewer$3,480.00 one-time
  • Sewer Capital Facilities Charge + Tap Fee (Cedar Key Water and Sewer District)
    Cedar Key Water and Sewer District
    Source: CKWSD Codified Resolutions v. 5.14.2024 (read via pdf.js 2026-07-13). Demand-based, not meter-based. Sec. 4.04.C Table 1 row 7 'Retail commercial, no food service': MINIMUM up to 1,000 sq ft = 120 gpd average daily flow = $480.00 sewer capital facilities charge; ADDITIONAL above 1,000 sq ft = 0.12 gpd/sq ft = $0.48 per sq ft. Plus Sec. 5.04.G Tap Fee for initial wastewater connection $3,000.00. Amount entered = published MINIMUM: $480 + $3,000 = $3,480 for a nonres connection ≤ 1,000 sq ft; add $0.48/sq ft above 1,000. Uses not in Table 1 (offices, industrial) are charged by District-estimated demand at $4.00 per gallon of estimated average daily flow. Tap fee subject to line-extension rules (Sec. 4.05). Contact: CKWSD, (352) 543-5285.
    $3,480.00 one-time
City$0.00
  • City Impact Fee (City of Cedar Key, Office)
    City of Cedar Key
    Confirmed $0 — Cedar Key levies no municipal impact fee. Proved from the city's Chapter Five (Schedule of Fees, Rates and Charges), read in full 2026-07-13: no occurrence of 'impact' anywhere in the schedule.
    $0.00
County$0.08/sq ft
  • Emergency Medical System Impact Fee (Levy County, Office)
    Levy County
    County fee collected inside the City of Cedar Key. No separate Office row — offices fall in the Commercial row ($0.08/sq ft) per §47-46's Commercial definition. Countywide. Basis: GFA.
    $0.08/sq ft
  • Road Impact Fee (Levy County, Office)
    Levy County
    Confirmed $0 inside the City of Cedar Key — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)). Unincorporated Office rate for reference: $1,481 per 1,000 sq ft.
    $0.00
Total (Cedar Key): $0.08/sq ft + $7,500.00 one-time (≈ $9,500.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Cedar Key Water and Sewer District City of Cedar Key Levy County

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Cedar Key

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Cedar Key, Florida?

A new single-family home in Cedar Key pays $7,500.00 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Cedar Key?

Commercial development in Cedar Key pays $0.08 per square foot in impact fees, plus $7,500.00 in one-time water and sewer connection fees, about $11,500.00 for a 50,000 sq ft building.

Does Cedar Key charge its own impact fees?

Yes. Cedar Key levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cedar Key, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Levy County impact fees page.