Inglis impact fees by project type
Inglis: Single-Family Impact Fees
A new single-family home in Inglis pays $573.08 per unit in impact fees (rates sourced July 24, 2026). Of that, Levy County-levied fees account for $53.08 and municipal or utility fees for $520.00.
The largest line items are Water Connection Fee (Town of Inglis) ($520.00) and EMS Impact Fee (Levy County) ($53.08).
View the full Inglis impact fee schedule
- Water Connection Fee (Town of Inglis)$520.00Town of InglisTown of Inglis water meter/check-valve installation starts at $520; additional cost is possible depending on the installation (Town Water Service Information, Feb 2024). The Town has no sewer system.
- $0.00
- City Impact Fee (Town of Inglis)$0.00Town of Inglis
- EMS Impact Fee (Levy County)$53.08Levy County emergency medical services impact fee applies within this municipality. $53.08 per dwelling unit (single-family and multifamily). Collected at building-permit issuance.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Multifamily Impact Fees
A new multifamily unit in Inglis pays $573.08 per unit in impact fees (rates sourced July 24, 2026). Of that, Levy County-levied fees account for $53.08 and municipal or utility fees for $520.00.
The largest line items are Water Connection Fee (Town of Inglis) ($520.00) and EMS Impact Fee (Levy County, MF) ($53.08).
View the full Inglis impact fee schedule
- Water Connection Fee (Town of Inglis)$520.00Town of InglisTown of Inglis water meter/check-valve installation starts at $520 per connection; additional cost possible depending on the installation (Town Water Service Information, Feb 2024). The Town has no sewer system.
- $0.00
- City Impact Fee (Town of Inglis)$0.00Town of Inglis
- EMS Impact Fee (Levy County, MF)$53.08Levy County emergency medical services impact fee applies within this municipality. $53.08 per dwelling unit. Collected at building-permit issuance.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Commercial Impact Fees
Commercial development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to about $4,520.00. The calculator below adjusts to your exact square footage.
The largest line items are Emergency Medical System Impact Fee (Levy County, Commercial) ($0.08/sq ft).
Water Meter / Check Valve Installation Charge (Town of Inglis) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Inglis impact fee schedule
- $520.00 one-timeRequires confirmation
- Sewer Connection Fee (Town of Inglis)$0.00N/A — no municipal sewer
- City Impact Fee (Town of Inglis, Commercial)$0.00Town of Inglis
- Emergency Medical System Impact Fee (Levy County, Commercial)$0.08/sq ftLevy CountyLevy County Emergency Medical Services (EMS) impact fee. Applies countywide, including within all incorporated municipalities (EMS is a county-provided service). Charged per sq ft of gross floor area.
- Road Impact Fee (Levy County, Commercial)$0.00Levy County
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Industrial Impact Fees
Industrial development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to about $4,520.00. The calculator below adjusts to your exact square footage.
Emergency Medical System Impact Fee (Levy County, Industrial) and Water Meter / Check Valve Installation Charge (Town of Inglis) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full Inglis impact fee schedule
- $520.00 one-timeRequires confirmation
- Sewer Connection Fee (Town of Inglis)$0.00N/A — no municipal sewer
- City Impact Fee (Town of Inglis, Industrial)$0.00Town of Inglis
- $0.08/sq ftRequires confirmation
- Road Impact Fee (Levy County, Industrial)$0.00Levy County
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Office Impact Fees
Office development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 25,000 sq ft building, that comes to about $2,520.00. The calculator below adjusts to your exact square footage.
The largest line items are Emergency Medical System Impact Fee (Levy County, Office) ($0.08/sq ft).
Water Meter / Check Valve Installation Charge (Town of Inglis) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Inglis impact fee schedule
- $520.00 one-timeRequires confirmation
- Sewer Connection Fee (Town of Inglis)$0.00N/A — no municipal sewer
- City Impact Fee (Town of Inglis, Office)$0.00Town of Inglis
- Emergency Medical System Impact Fee (Levy County, Office)$0.08/sq ftLevy CountyLevy County Emergency Medical Services (EMS) impact fee. Applies countywide, including within all incorporated municipalities (EMS is a county-provided service). Charged per sq ft of gross floor area.
- Road Impact Fee (Levy County, Office)$0.00Levy County
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Inglis impact fee FAQs
What are the total impact fees for a single-family home in Inglis, Florida?
A new single-family home in Inglis pays $573.08 per unit in combined impact fees (rates sourced July 24, 2026).
How much are commercial impact fees in Inglis?
Commercial development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees, about $4,520.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Inglis charge its own impact fees?
Yes. Inglis levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Inglis, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Levy County impact fees page.