Inglis impact fees by project type
Inglis: Single-Family Impact Fees
A new single-family home in Inglis pays $520.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Town of Inglis) ($520.00).
View the full fee schedule
- Water Connection Fee (Town of Inglis)$520.00Town of InglisMeter/check valve installation starts at $520; additional fees may apply based on installation costs per Public Works Supervisor. From Town of Inglis Water Service Information (updated Feb 2024). Town has no sewer system.
- Sewer Connection Fee (Town of Inglis)$0.00N/ANo municipal sewer. Town is water-only. As of 2026, centralized sewer still being explored. Source: townofinglis.org/public-works/
- City Impact Fee (Town of Inglis)$0.00Town of InglisNo city-level impact fees found. Small town. Source: Research June 2026.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Multifamily Impact Fees
A new multifamily unit in Inglis pays $520.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Town of Inglis) ($520.00).
View the full fee schedule
- Water Connection Fee (Town of Inglis)$520.00Town of InglisMeter/check valve installation starts at $520 per connection; additional fees possible based on installation costs. From Town of Inglis Water Service Information (updated Feb 2024). Town has no sewer system.
- Sewer Connection Fee (Town of Inglis)$0.00N/ANo municipal sewer. Town is water-only. Researched June 2026.
- City Impact Fee (Town of Inglis)$0.00Town of InglisNo city-level impact fees found. Small town. Researched June 2026.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Commercial Impact Fees
Commercial development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $4,520.00. The calculator below adjusts to your exact square footage.
The largest line items are Emergency Medical System Impact Fee (Levy County, Commercial) ($0.08/sq ft).
Water Meter / Check Valve Installation Charge (Town of Inglis) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Meter / Check Valve Installation Charge (Town of Inglis)$520.00 one-timeRequires confirmationTown of InglisUNCONFIRMED (published FLOOR only, not a fixed fee). Source: Town of Inglis 'Water Service Information' sheet, rev. Feb 2024 — it has a dedicated COMMERCIAL section reading: 'THE METER/CHECK VALVE INSTALLATION FOR COMMERCIAL SERVICES BEGINS AT $520.00. ADDITIONAL FEES MAY BE ASSESSED DUE TO INSTALLATION COSTS. THIS CHARGE WILL BE CALCULATED BY THE PUBLIC WORKS SUPERVISOR.' Same starting figure as residential. No meter-size ladder and no capacity/impact charge is published; the actual amount is set case-by-case by the Public Works Supervisor. Inglis Code Ch. 70 (Utilities) carries monthly rate tables but no connection-fee dollar figure. Contact: Town of Inglis, (352) 447-2203, 135 Hwy 40 W, Inglis FL 34449.
- Sewer Connection Fee (Town of Inglis)$0.00N/A — no municipal sewerConfirmed $0 — the Town of Inglis has NO sewer system. It is water-only; all properties, nonresidential included, are on septic. Centralized sewer is still only being explored as of 2026. Source: townofinglis.org/public-works and Inglis Code Ch. 70 (Utilities), which regulates the waterworks system only.
- City Impact Fee (Town of Inglis, Commercial)$0.00Town of InglisConfirmed $0 — Inglis levies no municipal impact fee. Full Part II chapter index read 2026-07-13 (Chs. 1, 2, 6, 10, 14, 18, 22, 26, 30, 34 Land Development Regulations, 38, 42, 46, 50 Planning, 54, 58, 62 Taxation, 66, 70 Utilities, 71): no impact-fee chapter. Code current through Ord. 02-25 (9-9-2025).
- Emergency Medical System Impact Fee (Levy County, Commercial)$0.08/sq ftLevy CountyCounty fee collected inside the Town of Inglis. Levy County Code Ch. 47 Art. III, Sec. 47-49(b) — schedule row 'Commercial $0.08 per square foot'. Countywide per §47-47(a)/§47-49(a). Basis: GFA (§47-2). Not indexed.
- Road Impact Fee (Levy County, Commercial)$0.00Levy CountyConfirmed $0 inside the Town of Inglis — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)); no municipal interlocal. Unincorporated rates for reference: Commercial $1,710 / Office $1,481 / Industrial $640 per 1,000 sq ft.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Industrial Impact Fees
Industrial development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $4,520.00. The calculator below adjusts to your exact square footage.
Emergency Medical System Impact Fee (Levy County, Industrial) and Water Meter / Check Valve Installation Charge (Town of Inglis) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Meter / Check Valve Installation Charge (Town of Inglis)$520.00 one-timeRequires confirmationTown of InglisUNCONFIRMED (published FLOOR only, not a fixed fee). Source: Town of Inglis 'Water Service Information' sheet, rev. Feb 2024 — it has a dedicated COMMERCIAL section reading: 'THE METER/CHECK VALVE INSTALLATION FOR COMMERCIAL SERVICES BEGINS AT $520.00. ADDITIONAL FEES MAY BE ASSESSED DUE TO INSTALLATION COSTS. THIS CHARGE WILL BE CALCULATED BY THE PUBLIC WORKS SUPERVISOR.' Same starting figure as residential. No meter-size ladder and no capacity/impact charge is published; the actual amount is set case-by-case by the Public Works Supervisor. Inglis Code Ch. 70 (Utilities) carries monthly rate tables but no connection-fee dollar figure. Contact: Town of Inglis, (352) 447-2203, 135 Hwy 40 W, Inglis FL 34449.
- Sewer Connection Fee (Town of Inglis)$0.00N/A — no municipal sewerConfirmed $0 — the Town of Inglis has NO sewer system. It is water-only; all properties, nonresidential included, are on septic. Centralized sewer is still only being explored as of 2026. Source: townofinglis.org/public-works and Inglis Code Ch. 70 (Utilities), which regulates the waterworks system only.
- City Impact Fee (Town of Inglis, Industrial)$0.00Town of InglisConfirmed $0 — Inglis levies no municipal impact fee. Full Part II chapter index read 2026-07-13; no impact-fee chapter. Code current through Ord. 02-25 (9-9-2025).
- Emergency Medical System Impact Fee (Levy County, Industrial)$0.08/sq ftRequires confirmationLevy CountyUNCONFIRMED (applicability). County fee collected inside the Town of Inglis. §47-49(b) has no Industrial row; manufacturing is priced by the county manager under §47-53(a). $0.08/sq ft (nearest analog) entered pending confirmation. Confirm with Levy County Development Dept., (352) 486-5203.
- Road Impact Fee (Levy County, Industrial)$0.00Levy CountyConfirmed $0 inside the Town of Inglis — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)). Unincorporated Industrial rate for reference: $640 per 1,000 sq ft.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Inglis: Office Impact Fees
Office development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $2,520.00. The calculator below adjusts to your exact square footage.
The largest line items are Emergency Medical System Impact Fee (Levy County, Office) ($0.08/sq ft).
Water Meter / Check Valve Installation Charge (Town of Inglis) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Meter / Check Valve Installation Charge (Town of Inglis)$520.00 one-timeRequires confirmationTown of InglisUNCONFIRMED (published FLOOR only, not a fixed fee). Source: Town of Inglis 'Water Service Information' sheet, rev. Feb 2024 — it has a dedicated COMMERCIAL section reading: 'THE METER/CHECK VALVE INSTALLATION FOR COMMERCIAL SERVICES BEGINS AT $520.00. ADDITIONAL FEES MAY BE ASSESSED DUE TO INSTALLATION COSTS. THIS CHARGE WILL BE CALCULATED BY THE PUBLIC WORKS SUPERVISOR.' Same starting figure as residential. No meter-size ladder and no capacity/impact charge is published; the actual amount is set case-by-case by the Public Works Supervisor. Inglis Code Ch. 70 (Utilities) carries monthly rate tables but no connection-fee dollar figure. Contact: Town of Inglis, (352) 447-2203, 135 Hwy 40 W, Inglis FL 34449.
- Sewer Connection Fee (Town of Inglis)$0.00N/A — no municipal sewerConfirmed $0 — the Town of Inglis has NO sewer system. It is water-only; all properties, nonresidential included, are on septic. Centralized sewer is still only being explored as of 2026. Source: townofinglis.org/public-works and Inglis Code Ch. 70 (Utilities), which regulates the waterworks system only.
- City Impact Fee (Town of Inglis, Office)$0.00Town of InglisConfirmed $0 — Inglis levies no municipal impact fee. Full Part II chapter index read 2026-07-13; no impact-fee chapter. Code current through Ord. 02-25 (9-9-2025).
- Emergency Medical System Impact Fee (Levy County, Office)$0.08/sq ftLevy CountyCounty fee collected inside the Town of Inglis. No separate Office row — offices fall in the Commercial row ($0.08/sq ft) per §47-46. Countywide. Basis: GFA.
- Road Impact Fee (Levy County, Office)$0.00Levy CountyConfirmed $0 inside the Town of Inglis — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)). Unincorporated Office rate for reference: $1,481 per 1,000 sq ft.
Where in Levy County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Inglis
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Inglis, Florida?
A new single-family home in Inglis pays $520.00 per unit in combined impact fees (rates sourced July 14, 2026).
How much are commercial impact fees in Inglis?
Commercial development in Inglis pays $0.08 per square foot in impact fees, plus $520.00 in one-time water and sewer connection fees, about $4,520.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Inglis charge its own impact fees?
Yes. Inglis levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Inglis, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Levy County impact fees page.