IMPACTFEES.ORG

Chiefland, Florida Impact Fees

Chiefland applies its own fee schedule: municipal fees plus the Levy County-levied fees that apply inside city limits. Combined, a new single-family home pays $848.00 per unit (rates sourced July 14, 2026). The full breakdown is below.

Chiefland impact fees by project type

Chiefland: Single-Family Impact Fees

A new single-family home in Chiefland pays $848.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (City of Chiefland) ($548.00) and Sewer Connection Fee (City of Chiefland) ($300.00).

View the full fee schedule
Water$548.00
  • Water Connection Fee (City of Chiefland)
    City of Chiefland
    Appendix A, Sec. I — Meter Setting Charge. Standard 3/4" meter: $548. Other sizes: 1"=$648, 1.5"=$887, 2"=$1,078, 3"+= actual cost. Per Res. No. 20-03 (effective Jan 2020). Code last codified Nov 2020 — rate may be stale. Verify with city.
    $548.00
Sewer$300.00
  • Sewer Connection Fee (City of Chiefland)
    City of Chiefland
    Appendix A, Sec. II — $300 to locate, connect and inspect, plus cost of materials. Per Res. No. 20-03 (effective Jan 2020). VERIFY CLOSED 7/12/2026: Ch. 74's reference to a Sewer System Development Charge in 'Appendix B' is a dead cross-reference — Appendix B of the Chiefland code is the LICENSE TAX SCHEDULE, and contains no sewer capacity/SDC charge. The only other sewer charge in Appendix A is the $10.00 'Sewer system availability charge' (Sec. III.D), which is a recurring MONTHLY charge, not a one-time development fee. No sewer capacity or impact charge applies in addition to the $300.
    $300.00
City$0.00
  • City Impact Fee (City of Chiefland)
    City of Chiefland
    No city-level impact fees found. Reviewed Chiefland Municode Chapter 74 (Utilities) and full code index. No impact fee chapter identified. Researched June 2026.
    $0.00
Total (Chiefland): $848.00
Sources last checked July 14, 2026Official fee schedule:City of Chiefland

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chiefland: Multifamily Impact Fees

A new multifamily unit in Chiefland pays $848.00 per unit in impact fees (rates sourced July 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (City of Chiefland) ($548.00) and Sewer Connection Fee (City of Chiefland) ($300.00).

View the full fee schedule
Water$548.00
  • Water Connection Fee (City of Chiefland)
    City of Chiefland
    Appendix A, Sec. I — Meter Setting Charge per connection. Standard 3/4" meter: $548. Larger meters: 1"=$648, 1.5"=$887, 2"=$1,078. Per Res. No. 20-03 (Jan 2020). Code last codified Nov 2020 — may be stale. MF units typically require larger meters; confirm with city.
    $548.00
Sewer$300.00
  • Sewer Connection Fee (City of Chiefland)
    City of Chiefland
    Appendix A, Sec. II — $300 to locate, connect and inspect, plus cost of materials, per connection. Per Res. No. 20-03 (Jan 2020). VERIFY CLOSED 7/12/2026: Ch. 74's cross-reference to a Sewer System Development Charge in 'Appendix B' is dead — Chiefland's Appendix B is the LICENSE TAX SCHEDULE and holds no sewer capacity/SDC charge. The only other sewer charge is the $10.00 'Sewer system availability charge' (Appendix A, Sec. III.D), a recurring MONTHLY charge, not a one-time development fee. No additional capacity/impact charge applies.
    $300.00
City$0.00
  • City Impact Fee (City of Chiefland)
    City of Chiefland
    No city-level impact fees found. Reviewed Chiefland Municode full code index. No impact fee chapter. Researched June 2026.
    $0.00
Total (Chiefland): $848.00
Sources last checked July 14, 2026Official fee schedule:City of Chiefland

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chiefland: Commercial Impact Fees

Commercial development in Chiefland pays $0.08 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $4,948.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Setting Charge (City of Chiefland) — 1" meter ($648.00 one-time), Sewer Connection Fee (City of Chiefland) ($300.00 one-time) and Emergency Medical System Impact Fee (Levy County, Commercial) ($0.08/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$648.00 one-time
  • Water Meter Setting Charge (City of Chiefland) — 1" meter
    City of Chiefland
    CANONICAL 1" METER DEFAULT. Chiefland Code Appendix A (Utility Fees), Sec. I.A — Meter Setting Charge: ¾" $548, 1" $648, 1½" $887, 2" $1,078, 3" and above = actual cost plus overhead. Per Res. No. 19-10 (10-28-2019) / Res. No. 20-03. SHARED LADDER: Chiefland publishes ONE meter-setting ladder for all customer classes — only the DEPOSITS differ residential vs. commercial (Sec. I.B), so nonres = SFR at the same meter size (shared-ladder precedent, not residential contamination). No separate capacity/system-development charge exists. Code last codified Nov 2020 — rates may be stale; verify with City Hall, (352) 493-6711.
    $648.00 one-time
Sewer$300.00 one-time
  • Sewer Connection Fee (City of Chiefland)
    City of Chiefland
    Chiefland Code Appendix A, Sec. II — the Commercial sewer block (and the Industrial block, which states 'Same as Commercial') both set the connection charge at '$300.00 to locate, connect and inspect, plus cost of materials.' Same figure as residential — one shared connection charge, not residential contamination. NO capacity / system-development charge exists: the residential pass closed that VERIFY — Ch. 74's cross-reference to a 'Sewer System Development Charge in Appendix B' is dead (Appendix B is the License Tax Schedule), and the only other sewer charge in Appendix A is the $10.00 monthly Sewer System Availability Charge (Sec. III.D), which is recurring, not one-time. Materials cost is additive and unpublished. Res. 19-10 (10-28-2019); code last codified Nov 2020.
    $300.00 one-time
City$0.00
  • City Impact Fee (City of Chiefland, Commercial)
    City of Chiefland
    Confirmed $0 — Chiefland levies no municipal impact fee. Full Chiefland Municode index reviewed (Ch. 74 Utilities + Appendix A Utility Fees + Appendix B License Tax Schedule): no impact-fee chapter and no impact fee anywhere in the adopted fee appendices. Utility connection charges are tracked in the Water Sewer Fees - Nonresidential table.
    $0.00
County$0.08/sq ft
  • Emergency Medical System Impact Fee (Levy County, Commercial)
    Levy County
    County fee collected inside the City of Chiefland. Levy County Code Ch. 47 Art. III, Sec. 47-49(b) — schedule row 'Commercial $0.08 per square foot'. Countywide per §47-47(a)/§47-49(a). Basis: GFA (§47-2). Not indexed.
    $0.08/sq ft
  • Road Impact Fee (Levy County, Commercial)
    Levy County
    Confirmed $0 inside the City of Chiefland — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)); no municipal interlocal. Unincorporated rates for reference: Commercial $1,710 / Office $1,481 / Industrial $640 per 1,000 sq ft.
    $0.00
Total (Chiefland): $0.08/sq ft + $948.00 one-time (≈ $4,948.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Chiefland Levy County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chiefland: Industrial Impact Fees

Industrial development in Chiefland pays $0.08 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $4,948.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Setting Charge (City of Chiefland) — 1" meter ($648.00 one-time) and Sewer Connection Fee (City of Chiefland) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Emergency Medical System Impact Fee (Levy County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$648.00 one-time
  • Water Meter Setting Charge (City of Chiefland) — 1" meter
    City of Chiefland
    CANONICAL 1" METER DEFAULT. Chiefland Code Appendix A (Utility Fees), Sec. I.A — Meter Setting Charge: ¾" $548, 1" $648, 1½" $887, 2" $1,078, 3" and above = actual cost plus overhead. Per Res. No. 19-10 (10-28-2019) / Res. No. 20-03. SHARED LADDER: Chiefland publishes ONE meter-setting ladder for all customer classes — only the DEPOSITS differ residential vs. commercial (Sec. I.B), so nonres = SFR at the same meter size (shared-ladder precedent, not residential contamination). No separate capacity/system-development charge exists. Code last codified Nov 2020 — rates may be stale; verify with City Hall, (352) 493-6711.
    $648.00 one-time
Sewer$300.00 one-time
  • Sewer Connection Fee (City of Chiefland)
    City of Chiefland
    Chiefland Code Appendix A, Sec. II — the Commercial sewer block (and the Industrial block, which states 'Same as Commercial') both set the connection charge at '$300.00 to locate, connect and inspect, plus cost of materials.' Same figure as residential — one shared connection charge, not residential contamination. NO capacity / system-development charge exists: the residential pass closed that VERIFY — Ch. 74's cross-reference to a 'Sewer System Development Charge in Appendix B' is dead (Appendix B is the License Tax Schedule), and the only other sewer charge in Appendix A is the $10.00 monthly Sewer System Availability Charge (Sec. III.D), which is recurring, not one-time. Materials cost is additive and unpublished. Res. 19-10 (10-28-2019); code last codified Nov 2020.
    $300.00 one-time
City$0.00
  • City Impact Fee (City of Chiefland, Industrial)
    City of Chiefland
    Confirmed $0 — Chiefland levies no municipal impact fee. Full Municode index + Appendix A (Utility Fees) and Appendix B (License Tax Schedule) reviewed 2026-07-13; no impact-fee provision.
    $0.00
County$0.08/sq ft
  • Emergency Medical System Impact Fee (Levy County, Industrial)
    Levy County
    UNCONFIRMED (applicability). County fee collected inside the City of Chiefland. §47-49(b) has no Industrial row; manufacturing is priced by the county manager under §47-53(a). $0.08/sq ft (Commercial/nearest analog) entered pending confirmation. Confirm with Levy County Development Dept., (352) 486-5203.
    $0.08/sq ftRequires confirmation
  • Road Impact Fee (Levy County, Industrial)
    Levy County
    Confirmed $0 inside the City of Chiefland — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)). Unincorporated Industrial rate for reference: $640 per 1,000 sq ft.
    $0.00
Total (Chiefland): $0.08/sq ft + $948.00 one-time (≈ $4,948.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Chiefland Levy County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Chiefland: Office Impact Fees

Office development in Chiefland pays $0.08 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $2,948.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Meter Setting Charge (City of Chiefland) — 1" meter ($648.00 one-time), Sewer Connection Fee (City of Chiefland) ($300.00 one-time) and Emergency Medical System Impact Fee (Levy County, Office) ($0.08/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$648.00 one-time
  • Water Meter Setting Charge (City of Chiefland) — 1" meter
    City of Chiefland
    CANONICAL 1" METER DEFAULT. Chiefland Code Appendix A (Utility Fees), Sec. I.A — Meter Setting Charge: ¾" $548, 1" $648, 1½" $887, 2" $1,078, 3" and above = actual cost plus overhead. Per Res. No. 19-10 (10-28-2019) / Res. No. 20-03. SHARED LADDER: Chiefland publishes ONE meter-setting ladder for all customer classes — only the DEPOSITS differ residential vs. commercial (Sec. I.B), so nonres = SFR at the same meter size (shared-ladder precedent, not residential contamination). No separate capacity/system-development charge exists. Code last codified Nov 2020 — rates may be stale; verify with City Hall, (352) 493-6711.
    $648.00 one-time
Sewer$300.00 one-time
  • Sewer Connection Fee (City of Chiefland)
    City of Chiefland
    Chiefland Code Appendix A, Sec. II — the Commercial sewer block (and the Industrial block, which states 'Same as Commercial') both set the connection charge at '$300.00 to locate, connect and inspect, plus cost of materials.' Same figure as residential — one shared connection charge, not residential contamination. NO capacity / system-development charge exists: the residential pass closed that VERIFY — Ch. 74's cross-reference to a 'Sewer System Development Charge in Appendix B' is dead (Appendix B is the License Tax Schedule), and the only other sewer charge in Appendix A is the $10.00 monthly Sewer System Availability Charge (Sec. III.D), which is recurring, not one-time. Materials cost is additive and unpublished. Res. 19-10 (10-28-2019); code last codified Nov 2020.
    $300.00 one-time
City$0.00
  • City Impact Fee (City of Chiefland, Office)
    City of Chiefland
    Confirmed $0 — Chiefland levies no municipal impact fee. Full Municode index + Appendix A (Utility Fees) and Appendix B (License Tax Schedule) reviewed 2026-07-13; no impact-fee provision.
    $0.00
County$0.08/sq ft
  • Emergency Medical System Impact Fee (Levy County, Office)
    Levy County
    County fee collected inside the City of Chiefland. No separate Office row — offices fall in the Commercial row ($0.08/sq ft) per §47-46's Commercial definition. Countywide. Basis: GFA.
    $0.08/sq ft
  • Road Impact Fee (Levy County, Office)
    Levy County
    Confirmed $0 inside the City of Chiefland — county road impact fee is unincorporated-only (§47-67(a), §47-69(a)). Unincorporated Office rate for reference: $1,481 per 1,000 sq ft.
    $0.00
Total (Chiefland): $0.08/sq ft + $948.00 one-time (≈ $2,948.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Chiefland Levy County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Levy County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Chiefland

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Chiefland, Florida?

A new single-family home in Chiefland pays $848.00 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Chiefland?

Commercial development in Chiefland pays $0.08 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $4,948.00 for a 50,000 sq ft building.

Does Chiefland charge its own impact fees?

Yes. Chiefland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Chiefland, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Levy County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000