Chiefland Impact Fees by Project Type
Chiefland: Single-Family Impact Fees
A new single-family home in Chiefland pays $2,836.44 per unit in impact fees (rates sourced October 19, 2026). Of that, Levy County-levied fees account for $869.68 and municipal or utility fees for $1,966.76.
The largest line items are School Impact Fee (Levy County) ($816.60), Law Enforcement Impact Fee (City of Chiefland) ($642.77) and Water Connection Fee (City of Chiefland) ($548.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Chiefland Impact Fee Schedule
- Water Connection Fee (City of Chiefland)$548.003/4" meterCity of ChieflandCity of Chiefland water meter-setting (connection) charge, tiered by meter size (Appendix A, Sec. I; Res. 20-03, eff. Jan 2020): 3/4" $548 (standard residential, shown) / 1" $648 / 1.5" $887 / 2" $1,078 / 3"+ actual cost. No separate water capacity or impact fee. Customers outside city limits pay a 25% surcharge on usage rates.
- Sewer Connection Fee (City of Chiefland)$300.00City of ChieflandCity of Chiefland sewer connection: $300 to locate, connect and inspect, plus cost of materials (Appendix A; Res. 19-10). No separate sewer capacity or impact charge. Out-of-city customers pay a 25% surcharge on usage rates.
- Law Enforcement Impact Fee (City of Chiefland)$642.77City of ChieflandCity of Chiefland law enforcement impact fee: $642.77 per residential dwelling unit (Ordinance 07-08, adopted April 9, 2007). Applies inside city limits and is paid before the certificate of occupancy is issued.
- Fire Rescue Impact Fee (City of Chiefland)$405.18City of ChieflandCity of Chiefland fire rescue impact fee: $405.18 per residential dwelling unit (Ordinance 07-09, adopted April 9, 2007). Applies inside city limits and is paid before the certificate of occupancy is issued.
- Parks and Recreation Impact Fee (City of Chiefland)$70.81City of ChieflandCity of Chiefland parks and recreation facilities impact fee: $70.81 per single-family home (multifamily $58.33 per unit, mobile home $74.59) (Ordinance 07-06, adopted April 9, 2007). Applies inside city limits and is paid before the certificate of occupancy is issued.
- School Impact Fee (Levy County)$816.60Levy CountyLevy County educational system (school) impact fee, imposed countywide including within every municipality (Levy County Code Sec. 47-151, Ord. 2008-01). $816.60 per single-family detached dwelling unit (multifamily $416.40 per unit, mobile home $637.00). Paid before the building permit is issued; collections go to the School Board of Levy County.
- EMS Impact Fee (Levy County)$53.08Levy CountyLevy County emergency medical services impact fee applies within this municipality. $53.08 per dwelling unit (single-family and multifamily). Collected at building-permit issuance.
Where in Levy County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Chiefland: Multifamily Impact Fees
A new multifamily unit in Chiefland pays $2,423.76 per unit in impact fees (rates sourced October 19, 2026). Of that, Levy County-levied fees account for $469.48 and municipal or utility fees for $1,954.28.
The largest line items are Law Enforcement Impact Fee (City of Chiefland, MF) ($642.77), Water Connection Fee (City of Chiefland, MF) ($548.00) and School Impact Fee (Levy County, MF) ($416.40).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Chiefland Impact Fee Schedule
- Water Connection Fee (City of Chiefland, MF)$548.003/4" meterCity of ChieflandCity of Chiefland water meter-setting (connection) charge, tiered by meter size (Appendix A, Sec. I; Res. 20-03, eff. Jan 2020): 3/4" $548 / 1" $648 / 1.5" $887 / 2" $1,078 / 3"+ actual cost. Multifamily meter size scales with the building; the 3/4" rate shown is a floor. No separate water capacity or impact fee. Out-of-city customers pay a 25% surcharge on usage rates.
- Sewer Connection Fee (City of Chiefland)$300.00City of ChieflandCity of Chiefland sewer connection: $300 to locate, connect and inspect, plus cost of materials, per connection (Appendix A; Res. 19-10). No separate sewer capacity or impact charge. Out-of-city customers pay a 25% surcharge on usage rates.
- Law Enforcement Impact Fee (City of Chiefland, MF)$642.77City of ChieflandCity of Chiefland law enforcement impact fee: $642.77 per residential dwelling unit, single-family and multifamily alike (Ordinance 07-08, adopted April 9, 2007). Applies inside city limits and is paid before the certificate of occupancy is issued.
- Fire Rescue Impact Fee (City of Chiefland, MF)$405.18City of ChieflandCity of Chiefland fire rescue impact fee: $405.18 per residential dwelling unit, single-family and multifamily alike (Ordinance 07-09, adopted April 9, 2007). Applies inside city limits and is paid before the certificate of occupancy is issued.
- Parks and Recreation Impact Fee (City of Chiefland, MF)$58.33City of ChieflandCity of Chiefland parks and recreation facilities impact fee: $58.33 per multifamily dwelling unit (single-family $70.81) (Ordinance 07-06, adopted April 9, 2007). Applies inside city limits and is paid before the certificate of occupancy is issued.
- School Impact Fee (Levy County, MF)$416.40Levy CountyLevy County educational system (school) impact fee, imposed countywide including within every municipality (Levy County Code Sec. 47-151, Ord. 2008-01). $416.40 per multifamily dwelling unit (apartments, townhouses and condominiums); single-family detached $816.60. Paid before the building permit is issued; collections go to the School Board of Levy County.
- EMS Impact Fee (Levy County, MF)$53.08Levy CountyLevy County emergency medical services impact fee applies within this municipality. $53.08 per dwelling unit. Collected at building-permit issuance.
Where in Levy County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Chiefland: Commercial Impact Fees
Commercial development in Chiefland pays $0.73 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (rates sourced October 19, 2026).
For a 50,000 sq ft building, that comes to about $37,198.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Setting Charge (City of Chiefland) — 1" meter ($648.00 one-time), Sewer Connection Fee (City of Chiefland) ($300.00 one-time) and Law Enforcement Impact Fee (City of Chiefland, Commercial) ($0.33/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Chiefland Impact Fee Schedule
- Water Meter Setting Charge (City of Chiefland) — 1" meter$648.00 one-timeCity of ChieflandCity of Chiefland meter-setting charge; one meter-size ladder applies to all customer classes (only the deposit differs by class). 3" meters and larger are quoted at actual cost plus overhead. No separate water capacity/system-development charge applies.
- Sewer Connection Fee (City of Chiefland)$300.00 one-timeCity of ChieflandCity of Chiefland sewer connection charge: $300 to locate, connect and inspect, plus the cost of materials (materials additive and unpublished). No separate sewer capacity/system-development charge applies.
- Law Enforcement Impact Fee (City of Chiefland, Commercial)$0.33/sq ftCity of ChieflandCity of Chiefland law enforcement impact fee for retail store buildings, charged per sq ft (Ordinance 07-08, adopted April 9, 2007). Other commercial uses have their own rates (restaurants and vehicle repair or sales are higher). Paid on application for a certificate of occupancy.
- Fire Rescue Impact Fee (City of Chiefland, Commercial)$0.32/sq ftCity of ChieflandCity of Chiefland fire rescue impact fee, charged per sq ft of new nonresidential building area (Ordinance 07-09, adopted April 9, 2007). Paid on application for a certificate of occupancy.
- Parks and Recreation Impact Fee (City of Chiefland, Commercial)$0.00City of ChieflandThe City of Chiefland's parks and recreation impact fee applies only to new residential dwelling units, so nonresidential development pays no parks fee. The city's fire rescue and law enforcement impact fees apply separately.
- Emergency Medical System Impact Fee (Levy County, Commercial)$0.08/sq ftLevy CountyLevy County Emergency Medical Services (EMS) impact fee. Applies countywide, including within all incorporated municipalities (EMS is a county-provided service). Charged per sq ft of gross floor area.
- Road Impact Fee (Levy County, Commercial)$0.00Levy CountyThe Levy County road impact fee applies only in unincorporated Levy County, so commercial development inside the City of Chiefland does not pay it.
Where in Levy County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Chiefland: Industrial Impact Fees
Industrial development in Chiefland pays $0.45 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (rates sourced October 19, 2026).
For a 50,000 sq ft building, that comes to about $23,448.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Setting Charge (City of Chiefland) — 1" meter ($648.00 one-time), Sewer Connection Fee (City of Chiefland) ($300.00 one-time) and Law Enforcement Impact Fee (City of Chiefland, Industrial) ($0.05/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Fire Rescue Impact Fee (City of Chiefland, Industrial) and Emergency Medical System Impact Fee (Levy County, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Chiefland Impact Fee Schedule
- Water Meter Setting Charge (City of Chiefland) — 1" meter$648.00 one-timeCity of ChieflandCity of Chiefland meter-setting charge; one meter-size ladder applies to all customer classes (only the deposit differs by class). 3" meters and larger are quoted at actual cost plus overhead. No separate water capacity/system-development charge applies.
- Sewer Connection Fee (City of Chiefland)$300.00 one-timeCity of ChieflandCity of Chiefland sewer connection charge: $300 to locate, connect and inspect, plus the cost of materials (materials additive and unpublished). No separate sewer capacity/system-development charge applies.
- Fire Rescue Impact Fee (City of Chiefland, Industrial)$0.32/sq ftRequires confirmationCity of ChieflandCity of Chiefland fire rescue impact fee, charged per sq ft of new nonresidential building area (Ordinance 07-09, adopted April 9, 2007). The schedule has one commercial rate covering business uses. Paid on application for a certificate of occupancy.
- Law Enforcement Impact Fee (City of Chiefland, Industrial)$0.05/sq ftCity of ChieflandCity of Chiefland law enforcement impact fee for industrial and warehouse buildings, charged per sq ft (Ordinance 07-08, adopted April 9, 2007). Paid on application for a certificate of occupancy.
- Parks and Recreation Impact Fee (City of Chiefland, Industrial)$0.00City of ChieflandThe City of Chiefland's parks and recreation impact fee applies only to new residential dwelling units, so nonresidential development pays no parks fee. The city's fire rescue and law enforcement impact fees apply separately.
- Emergency Medical System Impact Fee (Levy County, Industrial)$0.08/sq ftRequires confirmationLevy CountyLevy County emergency medical services impact fee, charged countywide including inside the City of Chiefland. The county schedule has no industrial row; the county prices a use it does not list at its most similar category, shown here at the commercial rate per sq ft of gross floor area.
- Road Impact Fee (Levy County, Industrial)$0.00Levy CountyThe Levy County road impact fee applies only in unincorporated Levy County, so industrial development inside the City of Chiefland does not pay it.
Where in Levy County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Chiefland: Office Impact Fees
Office development in Chiefland pays $0.65 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (rates sourced October 19, 2026).
For a 25,000 sq ft building, that comes to about $17,073.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Setting Charge (City of Chiefland) — 1" meter ($648.00 one-time), Sewer Connection Fee (City of Chiefland) ($300.00 one-time) and Law Enforcement Impact Fee (City of Chiefland, Office) ($0.24/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Fire Rescue Impact Fee (City of Chiefland, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Chiefland Impact Fee Schedule
- Water Meter Setting Charge (City of Chiefland) — 1" meter$648.00 one-timeCity of ChieflandCity of Chiefland meter-setting charge; one meter-size ladder applies to all customer classes (only the deposit differs by class). 3" meters and larger are quoted at actual cost plus overhead. No separate water capacity/system-development charge applies.
- Sewer Connection Fee (City of Chiefland)$300.00 one-timeCity of ChieflandCity of Chiefland sewer connection charge: $300 to locate, connect and inspect, plus the cost of materials (materials additive and unpublished). No separate sewer capacity/system-development charge applies.
- Fire Rescue Impact Fee (City of Chiefland, Office)$0.32/sq ftRequires confirmationCity of ChieflandCity of Chiefland fire rescue impact fee, charged per sq ft of new nonresidential building area (Ordinance 07-09, adopted April 9, 2007). The schedule has one commercial rate covering business uses. Paid on application for a certificate of occupancy.
- Law Enforcement Impact Fee (City of Chiefland, Office)$0.24/sq ftCity of ChieflandCity of Chiefland law enforcement impact fee for general commercial and professional office buildings, charged per sq ft (Ordinance 07-08, adopted April 9, 2007). Paid on application for a certificate of occupancy.
- Parks and Recreation Impact Fee (City of Chiefland, Office)$0.00City of ChieflandThe City of Chiefland's parks and recreation impact fee applies only to new residential dwelling units, so nonresidential development pays no parks fee. The city's fire rescue and law enforcement impact fees apply separately.
- Emergency Medical System Impact Fee (Levy County, Office)$0.08/sq ftLevy CountyLevy County Emergency Medical Services (EMS) impact fee. Applies countywide, including within all incorporated municipalities (EMS is a county-provided service). Charged per sq ft of gross floor area.
- Road Impact Fee (Levy County, Office)$0.00Levy CountyThe Levy County road impact fee applies only in unincorporated Levy County, so office development inside the City of Chiefland does not pay it.
Where in Levy County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Chiefland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Chiefland Impact Fee FAQs
What are the total impact fees for a single-family home in Chiefland, Florida?
A new single-family home in Chiefland pays $2,836.44 per unit in combined impact fees (rates sourced October 19, 2026).
How much are commercial impact fees in Chiefland?
Commercial development in Chiefland pays $0.73 per square foot in impact fees, plus $948.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $37,198.00 for a 50,000 sq ft building.
Does Chiefland charge its own impact fees?
Yes. Chiefland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Chiefland, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Levy County impact fees page.