Anna Maria impact fees by project type
Anna Maria: Single-Family Impact Fees
A new single-family home in Anna Maria pays $12,571.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Manatee County.
The largest line items are County Educational Facilities Impact Fee (Manatee County) ($7,658.00), Wastewater Facility Investment Fee (Manatee County Utilities) ($3,175.00) and Potable Water Facility Investment Fee (Manatee County Utilities) ($1,738.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Potable Water Facility Investment Fee (Manatee County Utilities)$1,738.00Manatee County UtilitiesAnna Maria served by Manatee County Utilities (retail water). Potable Water FIF SFR 5/8x3/4" meter, eff 10/1/2019.
- Wastewater Facility Investment Fee (Manatee County Utilities)$3,175.00Manatee County UtilitiesAnna Maria retail wastewater by Manatee County Utilities. Wastewater FIF SFR 5/8x3/4" meter, eff 10/1/2019.
- City Impact Fee (City of Anna Maria)$0.00City of Anna MariaSmall barrier-island city; no municipal impact fees found (water/sewer provided by Manatee County). Placeholder documents check.
- County Educational Facilities Impact Fee (Manatee County)$7,658.00Manatee CountyCONFIRMED 7/13/2026. Educational Facilities (school) impact fee is assessed COUNTYWIDE and collected inside Anna Maria (listed on the county's Educational Facilities Impact Fee Invoice; payable at the Manatee County Historic Courthouse cashier for the island cities). Ord. 25-15 eff 9/9/2025; tiered by A/C sq ft, same rate for SFR/MF/mobile home: <=750 $2,464 | 751-1,000 $4,377 | 1,001-1,300 $7,055 | 1,301-1,700 $7,252 | 1,701+ $7,658. Amount = canonical SFR tier (1,701+). County's other impact fees are UNINCORPORATED-only. Invoice valid 9/9/2025-9/8/2026; Ord. 24-22 annual education increases through 2027 — recheck after 9/9/2026.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anna Maria: Multifamily Impact Fees
A new multifamily unit in Anna Maria pays $7,324.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Manatee County.
The largest line items are County Educational Facilities Impact Fee (Manatee County) (MF) ($4,377.00), Wastewater Facility Investment Fee (Manatee County Utilities) (MF) ($1,905.00) and Potable Water Facility Investment Fee (Manatee County Utilities) (MF) ($1,042.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) (MF)$1,042.00Manatee County UtilitiesAnna Maria served by Manatee County Utilities. Potable Water FIF multifamily = $1,042/dwelling unit, eff 10/1/2019.
- Wastewater Facility Investment Fee (Manatee County Utilities) (MF)$1,905.00Manatee County UtilitiesAnna Maria wastewater by Manatee County Utilities. Wastewater FIF multifamily = $1,905/dwelling unit, eff 10/1/2019.
- City Impact Fee (City of Anna Maria) (MF)$0.00City of Anna MariaSmall barrier-island city; no municipal impact fees found (water/sewer by Manatee County). Placeholder documents check.
- County Educational Facilities Impact Fee (Manatee County) (MF)$4,377.00Manatee CountyCONFIRMED 7/13/2026. Educational Facilities (school) impact fee is the ONE county impact fee assessed COUNTYWIDE and collected inside Anna Maria (the county's Educational Facilities Impact Fee Invoice lists all 6 municipalities + unincorporated; one invoice PER DWELLING UNIT). Ord. 25-15 eff 9/9/2025. Tiered by A/C sq ft and the SAME rate for SFR, MF and mobile home: <=750 $2,464 | 751-1,000 $4,377 | 1,001-1,300 $7,055 | 1,301-1,700 $7,252 | 1,701+ $7,658. Amount = canonical MF unit (1,000 sq ft) -> 751-1,000 tier. NOT a copy of the SFR rate: the SFR record sits in the 1,701+ tier ($7,658). County's OTHER impact fees are UNINCORPORATED-only. Invoice valid 9/9/2025-9/8/2026; Ord. 24-22 annual education increases through 2027 - recheck after 9/9/2026.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anna Maria: Commercial Impact Fees
Commercial development in Anna Maria pays $0.78 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $53,122.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter ($9,127.00 one-time), Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter ($4,995.00 one-time) and Roads and Mobility Impact Fee (City of Anna Maria, Commercial) ($0.73/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter$4,995.00 one-timeManatee County UtilitiesAnna Maria is served by Manatee County Utilities (retail water) — the city runs no utility. MCU Facility Investment Fee, COMMERCIAL meter-size table (separate from and ~15% above the residential table), eff. 10/1/2019 per F.S. 153.31801. Paid prior to building permit. Canonical 1" default. A separate Fire Service FIF applies by line size. Verified 2026-07-14.
- Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter$9,127.00 one-timeManatee County UtilitiesAnna Maria retail wastewater is provided by Manatee County Utilities. MCU Facility Investment Fee, COMMERCIAL meter-size table (separate from residential), eff. 10/1/2019. Paid prior to building permit. Canonical 1" default. Verified 2026-07-14.
- Roads and Mobility Impact Fee (City of Anna Maria, Commercial)$0.73/sq ftCity of Anna MariaCode Ch. 28 (Impact Fees), Sec. 28-12(c), Ord. No. 20-871 (adopted 8-27-2020): 'The City of Anna Maria roads and mobility impact fees shall be paid for all new development of any kind or any increase in building size and shall be assessed at the rate of $0.73 per square foot of habitable area.' Single rate — no land-use category split in the ordinance, so the same rate is entered for Commercial, Office and Industrial. BASIS: per sq ft of HABITABLE AREA (not GFA/GLA). Adopted by reference the 2020 Raftelis 'City of Anna Maria Municipal Impact Fee Study' (Sec. 28-11). This is the only Anna Maria impact fee reaching nonresidential development; the parks & recreation fee is residential-only (Sec. 28-12(b)). Verified 2026-07-14.
- Parks and Recreation Impact Fee (City of Anna Maria, Commercial)$0.00City of Anna Maria$0 CONFIRMED. Code Sec. 28-12(b), Ord. 20-871: the parks and recreation impact fee ($1.15 per sq ft of habitable area) 'shall only be paid for residential development or increase in size of residential property.' Expressly does not reach nonresidential. Verified 2026-07-14.
- Fire Impact Fee (West Manatee Fire Rescue District, Commercial)$0.05/sq ftWest Manatee Fire Rescue DistrictWest Manatee Fire & Rescue District nonresidential impact fee. Authority: Ch. 2007-282, Laws of Florida (HB 937, approved 6-28-2007), amending Ch. 2000-401, L.O.F., § 14 (Impact Fees) — posted by WMFR on its own Taxes, Fees, Charges and Rates page under 'Current'. Adopted schedule: new NONRESIDENTIAL structure = $200 flat up to 5,000 sq ft; structures 5,000 sq ft or over = $200 + $0.05 per sq ft for each sq ft over 5,000. Entered as the marginal rate, $0.05/sq ft (Rate Type = PSF); add the $200 base for the first 5,000 sq ft. Single nonres rate — no category split in the schedule. District serves Anna Maria, Holmes Beach, Bradenton Beach and west unincorporated Manatee. Nov 2006 referendum authorizes the Board to raise the fee by schedule under F.S. ch. 191; no higher schedule posted as of 2026-07-14. Contact (941) 761-1555. Corrected from $0 on audit 2026-07-14.
- County Impact Fees (Manatee County, Commercial)$0.00Manatee County$0 CONFIRMED. Manatee County's nonresidential impact fees (Alternative Transportation, Public Safety, Law Enforcement, Admin Surcharge) are collected in the UNINCORPORATED area ONLY. The one county impact fee assessed COUNTYWIDE and collected inside the municipalities is the Educational Facilities (school) fee — and the Ord. 25-15 schedule (eff. 9/9/2025) has NO nonresidential rows for it (FL school impact fees are residential-only). Net county overlay on nonres development inside Anna Maria = $0. Verified 2026-07-14.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anna Maria: Industrial Impact Fees
Industrial development in Anna Maria pays $0.78 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $53,122.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter ($9,127.00 one-time), Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter ($4,995.00 one-time) and Roads and Mobility Impact Fee (City of Anna Maria, Industrial) ($0.73/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter$4,995.00 one-timeManatee County UtilitiesAnna Maria is served by Manatee County Utilities (retail water) — the city runs no utility. MCU Facility Investment Fee, COMMERCIAL meter-size table (separate from and ~15% above the residential table), eff. 10/1/2019 per F.S. 153.31801. Paid prior to building permit. Canonical 1" default. A separate Fire Service FIF applies by line size. Verified 2026-07-14.
- Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter$9,127.00 one-timeManatee County UtilitiesAnna Maria retail wastewater is provided by Manatee County Utilities. MCU Facility Investment Fee, COMMERCIAL meter-size table (separate from residential), eff. 10/1/2019. Paid prior to building permit. Canonical 1" default. Verified 2026-07-14.
- Roads and Mobility Impact Fee (City of Anna Maria, Industrial)$0.73/sq ftCity of Anna MariaCode Sec. 28-12(c), Ord. 20-871 (8-27-2020): $0.73 per sq ft of habitable area, payable 'for all new development of any kind.' Single nonres rate — no category split. (Anna Maria is a small barrier-island city with no industrial zoning; the fee would still apply by its own terms.) Verified 2026-07-14.
- Parks and Recreation Impact Fee (City of Anna Maria, Industrial)$0.00City of Anna Maria$0 CONFIRMED. Sec. 28-12(b): the parks & recreation impact fee ($1.15/sf habitable area) is residential-only by its own terms. Verified 2026-07-14.
- Fire Impact Fee (West Manatee Fire Rescue District, Industrial)$0.05/sq ftWest Manatee Fire Rescue DistrictWest Manatee Fire & Rescue District nonresidential impact fee. Authority: Ch. 2007-282, Laws of Florida (HB 937, approved 6-28-2007), amending Ch. 2000-401, L.O.F., § 14 (Impact Fees) — posted by WMFR on its own Taxes, Fees, Charges and Rates page under 'Current'. Adopted schedule: new NONRESIDENTIAL structure = $200 flat up to 5,000 sq ft; structures 5,000 sq ft or over = $200 + $0.05 per sq ft for each sq ft over 5,000. Entered as the marginal rate, $0.05/sq ft (Rate Type = PSF); add the $200 base for the first 5,000 sq ft. Single nonres rate — no category split in the schedule. District serves Anna Maria, Holmes Beach, Bradenton Beach and west unincorporated Manatee. Nov 2006 referendum authorizes the Board to raise the fee by schedule under F.S. ch. 191; no higher schedule posted as of 2026-07-14. Contact (941) 761-1555. Corrected from $0 on audit 2026-07-14.
- County Impact Fees (Manatee County, Industrial)$0.00Manatee County$0 CONFIRMED. County nonres impact fees are unincorporated-only; the one countywide county fee (Educational Facilities) has no nonresidential rows in the Ord. 25-15 schedule. Net county overlay on nonres inside Anna Maria = $0. Verified 2026-07-14.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Anna Maria: Office Impact Fees
Office development in Anna Maria pays $0.78 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $33,622.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter ($9,127.00 one-time), Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter ($4,995.00 one-time) and Roads and Mobility Impact Fee (City of Anna Maria, Office) ($0.73/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter$4,995.00 one-timeManatee County UtilitiesAnna Maria is served by Manatee County Utilities (retail water) — the city runs no utility. MCU Facility Investment Fee, COMMERCIAL meter-size table (separate from and ~15% above the residential table), eff. 10/1/2019 per F.S. 153.31801. Paid prior to building permit. Canonical 1" default. A separate Fire Service FIF applies by line size. Verified 2026-07-14.
- Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter$9,127.00 one-timeManatee County UtilitiesAnna Maria retail wastewater is provided by Manatee County Utilities. MCU Facility Investment Fee, COMMERCIAL meter-size table (separate from residential), eff. 10/1/2019. Paid prior to building permit. Canonical 1" default. Verified 2026-07-14.
- Roads and Mobility Impact Fee (City of Anna Maria, Office)$0.73/sq ftCity of Anna MariaCode Sec. 28-12(c), Ord. 20-871 (8-27-2020): $0.73 per sq ft of habitable area, payable 'for all new development of any kind.' Single nonres rate — no category split in the schedule. Verified 2026-07-14.
- Parks and Recreation Impact Fee (City of Anna Maria, Office)$0.00City of Anna Maria$0 CONFIRMED. Sec. 28-12(b): the parks & recreation impact fee ($1.15/sf habitable area) is residential-only by its own terms. Verified 2026-07-14.
- Fire Impact Fee (West Manatee Fire Rescue District, Office)$0.05/sq ftWest Manatee Fire Rescue DistrictWest Manatee Fire & Rescue District nonresidential impact fee. Authority: Ch. 2007-282, Laws of Florida (HB 937, approved 6-28-2007), amending Ch. 2000-401, L.O.F., § 14 (Impact Fees) — posted by WMFR on its own Taxes, Fees, Charges and Rates page under 'Current'. Adopted schedule: new NONRESIDENTIAL structure = $200 flat up to 5,000 sq ft; structures 5,000 sq ft or over = $200 + $0.05 per sq ft for each sq ft over 5,000. Entered as the marginal rate, $0.05/sq ft (Rate Type = PSF); add the $200 base for the first 5,000 sq ft. Single nonres rate — no category split in the schedule. District serves Anna Maria, Holmes Beach, Bradenton Beach and west unincorporated Manatee. Nov 2006 referendum authorizes the Board to raise the fee by schedule under F.S. ch. 191; no higher schedule posted as of 2026-07-14. Contact (941) 761-1555. Corrected from $0 on audit 2026-07-14.
- County Impact Fees (Manatee County, Office)$0.00Manatee County$0 CONFIRMED. County nonres impact fees are unincorporated-only; the one countywide county fee (Educational Facilities) has no nonresidential rows in the Ord. 25-15 schedule. Net county overlay on nonres inside Anna Maria = $0. Verified 2026-07-14.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Anna Maria
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Anna Maria, Florida?
A new single-family home in Anna Maria pays $12,571.00 per unit in combined impact fees (rates sourced July 14, 2026).
How much are commercial impact fees in Anna Maria?
Commercial development in Anna Maria pays $0.78 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $53,122.00 for a 50,000 sq ft building.
Does Anna Maria charge its own impact fees?
Yes. Anna Maria levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Anna Maria, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Manatee County impact fees page.