Bradenton, Florida Impact Fees

Bradenton applies its own fee schedule: municipal fees plus the Manatee County-levied fees that apply inside city limits. Combined, a new single-family home pays $16,426.20 per unit (rates sourced ). The full breakdown is below.

Bradenton impact fees by project type

Bradenton: Single-Family Impact Fees

A new single-family home in Bradenton pays $16,426.20 per unit in impact fees (rates sourced August 6, 2026). Of that, Manatee County-levied fees account for $7,658.00 and municipal or utility fees for $8,768.20.

The largest line items are County Educational Facilities Impact Fee (Manatee County) ($7,658.00), Sewer Connection + Impact Fee (City of Bradenton) ($2,770.10) and Water Connection + Impact Fee (City of Bradenton) ($2,684.60).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Bradenton impact fee schedule
Water$2,684.60
  • Water Connection + Impact Fee (City of Bradenton)
    City of Bradenton
    City of Bradenton operates its own water utility. A new single-family home pays a water connection charge ($1,751 for a 3/4" meter, with meter) plus a water impact fee of $62.24 per plumbing fixture-unit valve; the amount shown assumes a 3BR/2BA home at 15 fixture units ($1,751 + $933.60 = $2,684.60). Larger meters cost more. Rates effective 11/1/2025 (Res. 25-85); the annual Oct 1 CPI escalator applies to monthly charges only, not the connection charge.
    $2,684.60
Sewer$2,770.10
  • Sewer Connection + Impact Fee (City of Bradenton)
    City of Bradenton
    City of Bradenton operates its own sewer utility. A new single-family home pays a sewer connection charge ($1,550 for up to 4 bedrooms, +$672 per additional bedroom) plus a sewer impact fee of $81.34 per plumbing fixture-unit valve; the amount shown assumes a 3BR/2BA home at 15 fixture units ($1,550 + $1,220.10 = $2,770.10). Rates effective 11/1/2025 (Res. 25-85); the annual Oct 1 CPI escalator applies to monthly charges only.
    $2,770.10
City$3,313.50
County$7,658.00
  • County Educational Facilities Impact Fee (Manatee County)
    1,701 sq ft or more
    Manatee County
    Manatee County Educational Facilities (school) impact fee — the one county impact fee charged inside the municipalities as well as unincorporated Manatee, effective 9/9/2025 (Ord. 25-15). Tiered by air-conditioned area, same rate for single-family, multifamily and mobile homes: <=750 sq ft $2,464; 751-1,000 $4,377; 1,001-1,300 $7,055; 1,301-1,700 $7,252; 1,701 sq ft or more $7,658. Rate shown is the 1,701+ tier (canonical home). The county's other impact fees (transportation, parks, public safety, law enforcement, libraries) apply only in unincorporated Manatee. Collected at the building department that issues the permit. Education component increases annually through 2027.
    $7,658.00
Total (Bradenton): $16,426.20
Sources last checked Official fee schedules:City of Bradenton Manatee County

Where in Manatee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Multifamily Impact Fees

A new multifamily unit in Bradenton pays $8,419.75 per unit in impact fees (rates sourced August 6, 2026). Of that, Manatee County-levied fees account for $4,377.00 and municipal or utility fees for $4,042.75.

The largest line items are County Educational Facilities Impact Fee (Manatee County) (MF) ($4,377.00), Sewer Connection + Impact Fee (City of Bradenton) (MF) ($1,436.40) and Roads Impact Fee (City of Bradenton) (MF) ($1,363.95).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Bradenton impact fee schedule
Water$622.40
  • Water Connection + Impact Fee (City of Bradenton) (MF)
    per dwelling unit (impact fee only)
    City of Bradenton
    City of Bradenton operates its own water utility. For multifamily, the per-unit charge is the water impact fee of $62.24 per plumbing fixture-unit valve; a canonical 2BR/2BA unit at 10 fixture units is $622.40. The building also pays a single meter-size water connection charge for its master meter (e.g., $1,751 for a 3/4" meter, higher for larger meters). Rates effective 11/1/2025 (Res. 25-85).
    $622.40
Sewer$1,436.40
  • Sewer Connection + Impact Fee (City of Bradenton) (MF)
    per additional unit (3rd+)
    City of Bradenton
    City of Bradenton operates its own sewer utility. For multifamily, each unit pays a marginal sewer connection charge (1st unit $1,550, 2nd $672, each additional $623) plus a sewer impact fee of $81.34 per plumbing fixture-unit valve; a canonical 2BR/2BA additional unit at 10 fixture units is $1,436.40 ($623 + $813.40). Rates effective 11/1/2025 (Res. 25-85).
    $1,436.40
City$1,983.95
County$4,377.00
  • County Educational Facilities Impact Fee (Manatee County) (MF)
    751-1,000 sq ft
    Manatee County
    Manatee County Educational Facilities (school) impact fee — the one county impact fee charged inside the municipalities as well as unincorporated Manatee, effective 9/9/2025 (Ord. 25-15). Tiered by air-conditioned area, same rate for single-family, multifamily and mobile homes: <=750 sq ft $2,464; 751-1,000 $4,377; 1,001-1,300 $7,055; 1,301-1,700 $7,252; 1,701+ $7,658. Rate shown is the 751-1,000 sq ft tier (canonical multifamily unit) and is charged per dwelling unit. The county's other impact fees apply only in unincorporated Manatee. Education component increases annually through 2027.
    $4,377.00
Total (Bradenton): $8,419.75
Sources last checked Official fee schedules:City of Bradenton Manatee County

Where in Manatee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Commercial Impact Fees

Commercial development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).

For a 50,000 sq ft building, that comes to at least $1,866.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. City Impact Fee (City of Bradenton, Commercial) and Fire Impact Fee (City of Bradenton, Commercial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Bradenton impact fee schedule
Water$1,866.00 one-time
Sewer$0.00
City$0.00
County$0.00
Total (Bradenton): $1,866.00 one-time (≈ $1,866.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bradenton Manatee County City of Bradenton Fire Department
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Manatee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Industrial Impact Fees

Industrial development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).

For a 50,000 sq ft building, that comes to at least $1,866.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. Fire Impact Fee (City of Bradenton, Industrial) and City Impact Fee (City of Bradenton, Industrial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Bradenton impact fee schedule
Water$1,866.00 one-time
Sewer$0.00
City$0.00
County$0.00
Total (Bradenton): $1,866.00 one-time (≈ $1,866.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bradenton Manatee County City of Bradenton Fire Department
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Manatee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Office Impact Fees

Office development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).

For a 25,000 sq ft building, that comes to at least $1,866.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. City Impact Fee (City of Bradenton, Office) and Fire Impact Fee (City of Bradenton, Office) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Bradenton impact fee schedule
Water$1,866.00 one-time
Sewer$0.00
City$0.00
County$0.00
Total (Bradenton): $1,866.00 one-time (≈ $1,866.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Bradenton Manatee County City of Bradenton Fire Department
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Manatee County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Bradenton impact fee FAQs

What are the total impact fees for a single-family home in Bradenton, Florida?

A new single-family home in Bradenton pays $16,426.20 per unit in combined impact fees (rates sourced August 6, 2026).

How much are commercial impact fees in Bradenton?

Commercial development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Bradenton charge its own impact fees?

Yes. Bradenton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bradenton, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Manatee County impact fees page.