Bradenton impact fees by project type
Bradenton: Single-Family Impact Fees
A new single-family home in Bradenton pays $16,426.20 per unit in impact fees (rates sourced August 6, 2026). Of that, Manatee County-levied fees account for $7,658.00 and municipal or utility fees for $8,768.20.
The largest line items are County Educational Facilities Impact Fee (Manatee County) ($7,658.00), Sewer Connection + Impact Fee (City of Bradenton) ($2,770.10) and Water Connection + Impact Fee (City of Bradenton) ($2,684.60).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Bradenton impact fee schedule
- Water Connection + Impact Fee (City of Bradenton)$2,684.60City of BradentonCity of Bradenton operates its own water utility. A new single-family home pays a water connection charge ($1,751 for a 3/4" meter, with meter) plus a water impact fee of $62.24 per plumbing fixture-unit valve; the amount shown assumes a 3BR/2BA home at 15 fixture units ($1,751 + $933.60 = $2,684.60). Larger meters cost more. Rates effective 11/1/2025 (Res. 25-85); the annual Oct 1 CPI escalator applies to monthly charges only, not the connection charge.
- Sewer Connection + Impact Fee (City of Bradenton)$2,770.10City of BradentonCity of Bradenton operates its own sewer utility. A new single-family home pays a sewer connection charge ($1,550 for up to 4 bedrooms, +$672 per additional bedroom) plus a sewer impact fee of $81.34 per plumbing fixture-unit valve; the amount shown assumes a 3BR/2BA home at 15 fixture units ($1,550 + $1,220.10 = $2,770.10). Rates effective 11/1/2025 (Res. 25-85); the annual Oct 1 CPI escalator applies to monthly charges only.
- Roads Impact Fee (City of Bradenton)$2,073.503 BRCity of BradentonCity of Bradenton roads impact fee, charged per dwelling unit by bedroom count for a single-family detached home: 0-2 bedrooms $1,677.11; 3 bedrooms $2,073.50; 4 or more bedrooms $2,833.50. Applies within the city limits. The rate shown is the 3-bedroom (canonical) tier.
- Parks and Recreation Impact Fee (City of Bradenton) — $0.36/sq ft × 2,000 sq ft$720.00City of Bradenton parks and recreation impact fee: $0.36 per square foot of new residential floor area. The amount shown assumes a 2,000 sq ft home ($720). Applies within the city limits.
- Public Safety Impact Fee (City of Bradenton) — $0.26/sq ft × 2,000 sq ft$520.00City of Bradenton public safety (police + fire) impact fee: $0.26 per square foot of new residential floor area ($0.155 police + $0.105 fire). The amount shown assumes a 2,000 sq ft home ($520). Applies within the city limits.
- County Educational Facilities Impact Fee (Manatee County)$7,658.001,701 sq ft or moreManatee CountyManatee County Educational Facilities (school) impact fee — the one county impact fee charged inside the municipalities as well as unincorporated Manatee, effective 9/9/2025 (Ord. 25-15). Tiered by air-conditioned area, same rate for single-family, multifamily and mobile homes: <=750 sq ft $2,464; 751-1,000 $4,377; 1,001-1,300 $7,055; 1,301-1,700 $7,252; 1,701 sq ft or more $7,658. Rate shown is the 1,701+ tier (canonical home). The county's other impact fees (transportation, parks, public safety, law enforcement, libraries) apply only in unincorporated Manatee. Collected at the building department that issues the permit. Education component increases annually through 2027.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bradenton: Multifamily Impact Fees
A new multifamily unit in Bradenton pays $8,419.75 per unit in impact fees (rates sourced August 6, 2026). Of that, Manatee County-levied fees account for $4,377.00 and municipal or utility fees for $4,042.75.
The largest line items are County Educational Facilities Impact Fee (Manatee County) (MF) ($4,377.00), Sewer Connection + Impact Fee (City of Bradenton) (MF) ($1,436.40) and Roads Impact Fee (City of Bradenton) (MF) ($1,363.95).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Bradenton impact fee schedule
- Water Connection + Impact Fee (City of Bradenton) (MF)$622.40per dwelling unit (impact fee only)City of BradentonCity of Bradenton operates its own water utility. For multifamily, the per-unit charge is the water impact fee of $62.24 per plumbing fixture-unit valve; a canonical 2BR/2BA unit at 10 fixture units is $622.40. The building also pays a single meter-size water connection charge for its master meter (e.g., $1,751 for a 3/4" meter, higher for larger meters). Rates effective 11/1/2025 (Res. 25-85).
- Sewer Connection + Impact Fee (City of Bradenton) (MF)$1,436.40per additional unit (3rd+)City of BradentonCity of Bradenton operates its own sewer utility. For multifamily, each unit pays a marginal sewer connection charge (1st unit $1,550, 2nd $672, each additional $623) plus a sewer impact fee of $81.34 per plumbing fixture-unit valve; a canonical 2BR/2BA additional unit at 10 fixture units is $1,436.40 ($623 + $813.40). Rates effective 11/1/2025 (Res. 25-85).
- Roads Impact Fee (City of Bradenton) (MF)$1,363.952 BRCity of BradentonCity of Bradenton roads impact fee, charged per multifamily dwelling unit by bedroom count: 0-1 bedroom $1,253.67; 2 bedrooms $1,363.95; 3 or more bedrooms $2,386.65. Applies within the city limits. The rate shown is the 2-bedroom (canonical) tier.
- Parks and Recreation Impact Fee (City of Bradenton) (MF) — $0.36/sq ft × 1,000 sq ft$360.00City of Bradenton parks and recreation impact fee: $0.36 per square foot of new residential floor area. The amount shown assumes a 1,000 sq ft multifamily unit ($360). Applies within the city limits.
- Public Safety Impact Fee (City of Bradenton) (MF) — $0.26/sq ft × 1,000 sq ft$260.00City of Bradenton public safety (police + fire) impact fee: $0.26 per square foot of new residential floor area ($0.155 police + $0.105 fire). The amount shown assumes a 1,000 sq ft multifamily unit ($260). Applies within the city limits.
- County Educational Facilities Impact Fee (Manatee County) (MF)$4,377.00751-1,000 sq ftManatee CountyManatee County Educational Facilities (school) impact fee — the one county impact fee charged inside the municipalities as well as unincorporated Manatee, effective 9/9/2025 (Ord. 25-15). Tiered by air-conditioned area, same rate for single-family, multifamily and mobile homes: <=750 sq ft $2,464; 751-1,000 $4,377; 1,001-1,300 $7,055; 1,301-1,700 $7,252; 1,701+ $7,658. Rate shown is the 751-1,000 sq ft tier (canonical multifamily unit) and is charged per dwelling unit. The county's other impact fees apply only in unincorporated Manatee. Education component increases annually through 2027.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bradenton: Commercial Impact Fees
Commercial development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).
For a 50,000 sq ft building, that comes to at least $1,866.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. City Impact Fee (City of Bradenton, Commercial) and Fire Impact Fee (City of Bradenton, Commercial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bradenton impact fee schedule
- Water Connection Charge (City of Bradenton) — 1" meter$1,866.00 one-timeCity of BradentonWater connection charge set by meter size; effective 11/1/2025 (Res. 25-85). One shared ladder for all customer classes. A separate $62.24 per-fixture-unit water impact fee also applies. Meters over 10 inches are priced at cost plus 25%.
- Water Impact Fee (City of Bradenton) — per fixture-unit valveContact jurisdiction/utility to verifyCity of BradentonCharged per fixture-unit valve (project-specific count). In addition to the meter-size water connection charge.
- Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ftContact jurisdiction/utility to verifyCity of BradentonCharged per 3,000 sq ft of nonresidential floor area; effective 11/1/2025 (Res. 25-85). A separate $81.34 per-fixture-unit sewer impact fee also applies. High-flow or high-strength users are quoted by the Public Works Director.
- Sewer Impact Fee (City of Bradenton) — per fixture-unit valveContact jurisdiction/utility to verifyCity of BradentonCharged per fixture-unit valve (project-specific count). In addition to the sewer connection charge.
- City Impact Fee (City of Bradenton, Commercial)Requires confirmationCity of Bradenton
- County Impact Fees (Manatee County, Commercial)$0.00Manatee County
- Fire Impact Fee (City of Bradenton, Commercial)Requires confirmationCity of Bradenton Fire Department
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bradenton: Industrial Impact Fees
Industrial development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).
For a 50,000 sq ft building, that comes to at least $1,866.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. Fire Impact Fee (City of Bradenton, Industrial) and City Impact Fee (City of Bradenton, Industrial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bradenton impact fee schedule
- Water Connection Charge (City of Bradenton) — 1" meter$1,866.00 one-timeCity of BradentonWater connection charge set by meter size; effective 11/1/2025 (Res. 25-85). One shared ladder for all customer classes. A separate $62.24 per-fixture-unit water impact fee also applies. Meters over 10 inches are priced at cost plus 25%.
- Water Impact Fee (City of Bradenton) — per fixture-unit valveContact jurisdiction/utility to verifyCity of BradentonCharged per fixture-unit valve (project-specific count). In addition to the meter-size water connection charge.
- Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ftContact jurisdiction/utility to verifyCity of BradentonCharged per 3,000 sq ft of nonresidential floor area; effective 11/1/2025 (Res. 25-85). A separate $81.34 per-fixture-unit sewer impact fee also applies. High-flow or high-strength users are quoted by the Public Works Director.
- Sewer Impact Fee (City of Bradenton) — per fixture-unit valveContact jurisdiction/utility to verifyCity of BradentonCharged per fixture-unit valve (project-specific count). In addition to the sewer connection charge.
- City Impact Fee (City of Bradenton, Industrial)Requires confirmationCity of Bradenton
- County Impact Fees (Manatee County, Industrial)$0.00Manatee County
- Fire Impact Fee (City of Bradenton, Industrial)Requires confirmationCity of Bradenton Fire Department
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bradenton: Office Impact Fees
Office development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).
For a 25,000 sq ft building, that comes to at least $1,866.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. City Impact Fee (City of Bradenton, Office) and Fire Impact Fee (City of Bradenton, Office) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Bradenton impact fee schedule
- Water Connection Charge (City of Bradenton) — 1" meter$1,866.00 one-timeCity of BradentonWater connection charge set by meter size; effective 11/1/2025 (Res. 25-85). One shared ladder for all customer classes. A separate $62.24 per-fixture-unit water impact fee also applies. Meters over 10 inches are priced at cost plus 25%.
- Water Impact Fee (City of Bradenton) — per fixture-unit valveContact jurisdiction/utility to verifyCity of BradentonCharged per fixture-unit valve (project-specific count). In addition to the meter-size water connection charge.
- Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ftContact jurisdiction/utility to verifyCity of BradentonCharged per 3,000 sq ft of nonresidential floor area; effective 11/1/2025 (Res. 25-85). A separate $81.34 per-fixture-unit sewer impact fee also applies. High-flow or high-strength users are quoted by the Public Works Director.
- Sewer Impact Fee (City of Bradenton) — per fixture-unit valveContact jurisdiction/utility to verifyCity of BradentonCharged per fixture-unit valve (project-specific count). In addition to the sewer connection charge.
- City Impact Fee (City of Bradenton, Office)Requires confirmationCity of Bradenton
- County Impact Fees (Manatee County, Office)$0.00Manatee County
- Fire Impact Fee (City of Bradenton, Office)Requires confirmationCity of Bradenton Fire Department
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bradenton impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Bradenton impact fee FAQs
What are the total impact fees for a single-family home in Bradenton, Florida?
A new single-family home in Bradenton pays $16,426.20 per unit in combined impact fees (rates sourced August 6, 2026).
How much are commercial impact fees in Bradenton?
Commercial development in Bradenton pays no per-square-foot impact fees, but owes $1,866.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Bradenton charge its own impact fees?
Yes. Bradenton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bradenton, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Manatee County impact fees page.