Bradenton applies its own fee schedule: municipal fees plus the Manatee County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,192.20 per unit (rates sourced ). The full breakdown is below.

Bradenton Impact Fees by Project Type

Bradenton: Single-Family Impact Fees

A new single-family home in Bradenton pays $17,192.20 per unit in impact fees (rates sourced October 21, 2026). Of that, Manatee County-levied fees account for $8,424.00 and municipal or utility fees for $8,768.20.

The largest line items are County Educational Facilities Impact Fee (Manatee County) ($8,424.00), Sewer Connection + Impact Fee (City of Bradenton) ($2,770.10) and Water Connection + Impact Fee (City of Bradenton) ($2,684.60).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bradenton Impact Fee Schedule
Water$2,684.60
  • Water Connection + Impact Fee (City of Bradenton)
    City of Bradenton
    City of Bradenton operates its own water utility. A new single-family home pays a water connection charge ($1,751 for a 3/4" meter, with meter) plus a water impact fee of $62.24 per plumbing fixture-unit valve; the amount shown assumes a 3BR/2BA home at 15 fixture units ($1,751 + $933.60 = $2,684.60). Larger meters cost more. Rates effective 11/1/2025 (Res. 25-85); the annual Oct 1 CPI escalator applies to monthly charges only, not the connection charge.
    $2,684.60
Sewer$2,770.10
  • Sewer Connection + Impact Fee (City of Bradenton)
    City of Bradenton
    City of Bradenton operates its own sewer utility. A new single-family home pays a sewer connection charge ($1,550 for up to 4 bedrooms, +$672 per additional bedroom) plus a sewer impact fee of $81.34 per plumbing fixture-unit valve; the amount shown assumes a 3BR/2BA home at 15 fixture units ($1,550 + $1,220.10 = $2,770.10). Rates effective 11/1/2025 (Res. 25-85); the annual Oct 1 CPI escalator applies to monthly charges only.
    $2,770.10
City$3,313.50
County$8,424.00
  • County Educational Facilities Impact Fee (Manatee County)
    1,701 sq ft or more
    Manatee County
    Manatee County Educational Facilities (school) impact fee, the one county impact fee charged inside Bradenton and every other city as well as unincorporated Manatee (Ord. 24-22). Rates effective 9/9/2026, per dwelling unit, tiered by air-conditioned area and the same for single-family, multifamily and mobile homes: 750 sq ft or less $2,710; 751-1,000 $4,815; 1,001-1,300 $7,055; 1,301-1,700 $7,814; 1,701 sq ft or more $8,424. This row is the 1,701 sq ft or more tier (canonical home). Scheduled step on 9/9/2027, smallest to largest tier: $2,957, $5,253, $7,055, $8,377, $9,190. The county's other impact fees apply only in unincorporated Manatee. Paid before the certificate of occupancy.
    $8,424.00
Total (Bradenton): $17,192.20
Sources last checked Official fee schedules:City of Bradenton Manatee County

Where in Manatee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Multifamily Impact Fees

A new multifamily unit in Bradenton pays $8,857.75 per unit in impact fees (rates sourced October 21, 2026). Of that, Manatee County-levied fees account for $4,815.00 and municipal or utility fees for $4,042.75.

The largest line items are County Educational Facilities Impact Fee (Manatee County) (MF) ($4,815.00), Sewer Connection + Impact Fee (City of Bradenton) (MF) ($1,436.40) and Roads Impact Fee (City of Bradenton) (MF) ($1,363.95).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bradenton Impact Fee Schedule
Water$622.40
  • Water Connection + Impact Fee (City of Bradenton) (MF)
    per dwelling unit (impact fee only)
    City of Bradenton
    City of Bradenton operates its own water utility. For multifamily, the per-unit charge is the water impact fee of $62.24 per plumbing fixture-unit valve; a canonical 2BR/2BA unit at 10 fixture units is $622.40. The building also pays a single meter-size water connection charge for its master meter (e.g., $1,751 for a 3/4" meter, higher for larger meters). Rates effective 11/1/2025 (Res. 25-85).
    $622.40
Sewer$1,436.40
  • Sewer Connection + Impact Fee (City of Bradenton) (MF)
    per additional unit (3rd+)
    City of Bradenton
    City of Bradenton operates its own sewer utility. For multifamily, each unit pays a marginal sewer connection charge (1st unit $1,550, 2nd $672, each additional $623) plus a sewer impact fee of $81.34 per plumbing fixture-unit valve; a canonical 2BR/2BA additional unit at 10 fixture units is $1,436.40 ($623 + $813.40). Rates effective 11/1/2025 (Res. 25-85).
    $1,436.40
City$1,983.95
County$4,815.00
  • County Educational Facilities Impact Fee (Manatee County) (MF)
    751-1,000 sq ft
    Manatee County
    Manatee County Educational Facilities (school) impact fee, the one county impact fee charged inside Bradenton and every other city as well as unincorporated Manatee (Ord. 24-22). Rates effective 9/9/2026, per dwelling unit, tiered by air-conditioned area and the same for single-family, multifamily and mobile homes: 750 sq ft or less $2,710; 751-1,000 $4,815; 1,001-1,300 $7,055; 1,301-1,700 $7,814; 1,701 sq ft or more $8,424. This row is the 751-1,000 sq ft tier (canonical multifamily unit). Scheduled step on 9/9/2027, smallest to largest tier: $2,957, $5,253, $7,055, $8,377, $9,190. The county's other impact fees apply only in unincorporated Manatee. Paid before the certificate of occupancy.
    $4,815.00
Total (Bradenton): $8,857.75
Sources last checked Official fee schedules:City of Bradenton Manatee County

Where in Manatee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Commercial Impact Fees

Commercial development in Bradenton pays $4.19 per square foot in impact fees, plus $1,866.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $211,207.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time), Roads Impact Fee (City of Bradenton, Commercial) ($3.78/sq ft) and Public Safety Impact Fee (City of Bradenton, Commercial) ($0.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Bradenton Impact Fee Schedule
Water$1,866.00 one-time
Sewer$0.00
City$4.19/sq ft
  • Roads Impact Fee (City of Bradenton, Commercial)
    Shopping Center 25,001-100,000 sq ft
    City of Bradenton
    City of Bradenton roads impact fee (Code Sec. 18-262), charged per 1,000 sq ft of gross floor area. Shopping centers pay by center size: 25,000 sq ft or less, 25,001 to 100,000 sq ft (shown), or over 100,000 sq ft. Applies inside city limits; a change of use pays only the net increase.
    $3.78/sq ft
  • Public Safety Impact Fee (City of Bradenton, Commercial)
    City of Bradenton
    City of Bradenton public safety impact fee (Code Sec. 18-261) on new nonresidential buildings and expansions: $0.155 per sq ft for police plus $0.247 per sq ft for fire, $0.402 per sq ft of gross floor area in all. Applies inside city limits, which the city fire department serves.
    $0.40/sq ft
County$0.00
Total (Bradenton): $4.19/sq ft + $1,866.00 one-time (≈ $211,207.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bradenton Manatee County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Manatee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Industrial Impact Fees

Industrial development in Bradenton pays $1.22 per square foot in impact fees, plus $1,866.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $62,749.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time), Roads Impact Fee (City of Bradenton, Industrial) ($0.82/sq ft) and Public Safety Impact Fee (City of Bradenton, Industrial) ($0.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Bradenton Impact Fee Schedule
Water$1,866.00 one-time
Sewer$0.00
City$1.22/sq ft
  • Roads Impact Fee (City of Bradenton, Industrial)
    City of Bradenton
    City of Bradenton roads impact fee (Code Sec. 18-262) for light industrial use, charged per 1,000 sq ft of gross floor area. Applies inside city limits; a change of use pays only the net increase.
    $0.82/sq ft
  • Public Safety Impact Fee (City of Bradenton, Industrial)
    City of Bradenton
    City of Bradenton public safety impact fee (Code Sec. 18-261) on new nonresidential buildings and expansions: $0.155 per sq ft for police plus $0.247 per sq ft for fire, $0.402 per sq ft of gross floor area in all. Applies inside city limits, which the city fire department serves.
    $0.40/sq ft
County$0.00
Total (Bradenton): $1.22/sq ft + $1,866.00 one-time (≈ $62,749.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bradenton Manatee County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Manatee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton: Office Impact Fees

Office development in Bradenton pays $2.54 per square foot in impact fees, plus $1,866.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to at least $65,483.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of Bradenton) — 1" meter ($1,866.00 one-time), Roads Impact Fee (City of Bradenton, Office) ($2.14/sq ft) and Public Safety Impact Fee (City of Bradenton, Office) ($0.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Impact Fee (City of Bradenton) — per fixture-unit valve, Sewer Connection Charge (City of Bradenton) — commercial/industrial, per 3,000 sq ft, and Sewer Impact Fee (City of Bradenton) — per fixture-unit valve are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Bradenton Impact Fee Schedule
Water$1,866.00 one-time
Sewer$0.00
City$2.54/sq ft
  • Roads Impact Fee (City of Bradenton, Office)
    Office 25,000 sq ft or less
    City of Bradenton
    City of Bradenton roads impact fee (Code Sec. 18-262), charged per 1,000 sq ft of gross floor area. Office buildings pay by size: 25,000 sq ft or less (shown), 25,001 to 100,000 sq ft, or over 100,000 sq ft; medical and dental offices have a separate rate. Applies inside city limits; a change of use pays only the net increase.
    $2.14/sq ft
  • Public Safety Impact Fee (City of Bradenton, Office)
    City of Bradenton
    City of Bradenton public safety impact fee (Code Sec. 18-261) on new nonresidential buildings and expansions: $0.155 per sq ft for police plus $0.247 per sq ft for fire, $0.402 per sq ft of gross floor area in all. Applies inside city limits, which the city fire department serves.
    $0.40/sq ft
County$0.00
Total (Bradenton): $2.54/sq ft + $1,866.00 one-time (≈ $65,483.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Bradenton Manatee County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Manatee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bradenton Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Bradenton Impact Fee FAQs

What are the total impact fees for a single-family home in Bradenton, Florida?

A new single-family home in Bradenton pays $17,192.20 per unit in combined impact fees (rates sourced October 21, 2026).

How much are commercial impact fees in Bradenton?

Commercial development in Bradenton pays $4.19 per square foot in impact fees, plus $1,866.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $211,207.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Bradenton charge its own impact fees?

Yes. Bradenton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bradenton, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Manatee County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000