Holmes Beach Impact Fees by Project Type
Holmes Beach: Single-Family Impact Fees
A new single-family home in Holmes Beach pays $13,837.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Manatee County-levied fees account for $13,337.00 and municipal or utility fees for $500.00.
The largest line items are County Educational Facilities Impact Fee (Manatee County) ($8,424.00), Wastewater Facility Investment Fee (Manatee County Utilities) ($3,175.00) and Potable Water Facility Investment Fee (Manatee County Utilities) ($1,738.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Holmes Beach Impact Fee Schedule
- Potable Water Facility Investment Fee (Manatee County Utilities)$1,738.005/8" x 3/4"Manatee County UtilitiesHolmes Beach is served by Manatee County Utilities. Potable-water Facility Investment Fee (water capacity/impact fee), effective 10/1/2019; rate shown is for a standard 5/8x3/4" residential meter, larger meters pay more. Paid before the building permit.
- Wastewater Facility Investment Fee (Manatee County Utilities)$3,175.005/8" x 3/4"Manatee County UtilitiesHolmes Beach is served by Manatee County Utilities. Wastewater Facility Investment Fee (sewer capacity/impact fee), effective 10/1/2019; rate shown is for a standard 5/8x3/4" residential meter, larger meters pay more.
- City Impact Fee (City of Holmes Beach)$0.00City of Holmes BeachThe City of Holmes Beach does not levy municipal impact fees. Water and sewer are provided by Manatee County Utilities, and development pays Manatee County's school impact fee.
- County Educational Facilities Impact Fee (Manatee County)$8,424.001,701 sq ft or moreManatee CountyManatee County Educational Facilities (school) impact fee, the one county impact fee charged inside Holmes Beach and every other city as well as unincorporated Manatee (Ord. 24-22). Rates effective 9/9/2026, per dwelling unit, tiered by air-conditioned area and the same for single-family, multifamily and mobile homes: 750 sq ft or less $2,710; 751-1,000 $4,815; 1,001-1,300 $7,055; 1,301-1,700 $7,814; 1,701 sq ft or more $8,424. This row is the 1,701 sq ft or more tier (canonical home). Scheduled step on 9/9/2027, smallest to largest tier: $2,957, $5,253, $7,055, $8,377, $9,190. The county's other impact fees apply only in unincorporated Manatee. Paid before the certificate of occupancy.
- Fire Impact Fee (West Manatee Fire & Rescue District)$500.00West Manatee Fire & Rescue DistrictNew residential construction in Holmes Beach pays the West Manatee Fire & Rescue District fire impact fee of $500 per living unit. The district serves Anna Maria, Holmes Beach, Bradenton Beach and western unincorporated Manatee County and collects the fee itself.
Where in Manatee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Holmes Beach: Multifamily Impact Fees
A new multifamily unit in Holmes Beach pays $8,262.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Manatee County-levied fees account for $7,762.00 and municipal or utility fees for $500.00.
The largest line items are County Educational Facilities Impact Fee (Manatee County) (MF) ($4,815.00), Wastewater Facility Investment Fee (Manatee County Utilities) (MF) ($1,905.00) and Potable Water Facility Investment Fee (Manatee County Utilities) (MF) ($1,042.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Holmes Beach Impact Fee Schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) (MF)$1,042.00per dwelling unit (master-metered)Manatee County UtilitiesHolmes Beach is served by Manatee County Utilities. Potable-water Facility Investment Fee (water capacity/impact fee), effective 10/1/2019, at $1,042 per multifamily dwelling unit (master-metered).
- Wastewater Facility Investment Fee (Manatee County Utilities) (MF)$1,905.00per dwelling unit (master-metered)Manatee County UtilitiesHolmes Beach is served by Manatee County Utilities. Wastewater Facility Investment Fee (sewer capacity/impact fee), effective 10/1/2019, at $1,905 per multifamily dwelling unit (master-metered).
- City Impact Fee (City of Holmes Beach) (MF)$0.00City of Holmes BeachThe City of Holmes Beach does not levy municipal impact fees. Water and sewer are provided by Manatee County Utilities, and development pays Manatee County's school impact fee.
- County Educational Facilities Impact Fee (Manatee County) (MF)$4,815.00751-1,000 sq ftManatee CountyManatee County Educational Facilities (school) impact fee, the one county impact fee charged inside Holmes Beach and every other city as well as unincorporated Manatee (Ord. 24-22). Rates effective 9/9/2026, per dwelling unit, tiered by air-conditioned area and the same for single-family, multifamily and mobile homes: 750 sq ft or less $2,710; 751-1,000 $4,815; 1,001-1,300 $7,055; 1,301-1,700 $7,814; 1,701 sq ft or more $8,424. This row is the 751-1,000 sq ft tier (canonical multifamily unit). Scheduled step on 9/9/2027, smallest to largest tier: $2,957, $5,253, $7,055, $8,377, $9,190. The county's other impact fees apply only in unincorporated Manatee. Paid before the certificate of occupancy.
- Fire Impact Fee (West Manatee Fire & Rescue District, MF)$500.00West Manatee Fire & Rescue DistrictNew residential construction in Holmes Beach pays the West Manatee Fire & Rescue District fire impact fee of $500 per living unit, so each multifamily unit pays $500. The district serves Anna Maria, Holmes Beach, Bradenton Beach and western unincorporated Manatee County and collects the fee itself.
Where in Manatee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Holmes Beach: Commercial Impact Fees
Commercial development in Holmes Beach pays $0.25 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 50,000 sq ft building, that comes to at least $26,622.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter ($9,127.00 one-time), Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter ($4,995.00 one-time) and Fire Impact Fee (West Manatee Fire Rescue District, Commercial) ($0.25/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Facility Investment Fee (Manatee County Utilities) — over 6" meter and Potable Water Facility Investment Fee (Manatee County Utilities) — over 6" meter are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Holmes Beach Impact Fee Schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter$4,995.00 one-timeManatee County UtilitiesManatee County Utilities facility investment fee, set by water-meter size (commercial schedule); effective 10/1/2019. Meters over 6 inches are priced per gallon of daily reserve capacity.
- Potable Water Facility Investment Fee (Manatee County Utilities) — over 6" meterContact jurisdiction/utility to verifyManatee County UtilitiesCommercial meters over 6 in. pay a Manatee County Utilities potable water facility investment fee of $6.9526 per gallon per day of reserve capacity (schedule effective 10/1/2019). The total depends on the project's demand, so it is not added to the estimate.
- Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter$9,127.00 one-timeManatee County UtilitiesManatee County Utilities facility investment fee, set by water-meter size (commercial schedule); effective 10/1/2019. Meters over 6 inches are priced per gallon of daily reserve capacity.
- Wastewater Facility Investment Fee (Manatee County Utilities) — over 6" meterContact jurisdiction/utility to verifyManatee County UtilitiesCommercial meters over 6 in. pay a Manatee County Utilities wastewater facility investment fee of $17.162 per gallon per day of reserve capacity (schedule effective 10/1/2019). The total depends on the project's demand, so it is not added to the estimate.
- City Impact Fee (City of Holmes Beach, Commercial)$0.00City of Holmes BeachHolmes Beach levies no municipal impact fee on commercial construction. Its code sets none, and Sec. 2-162 confirms Manatee County's impact fees do not apply in the city.
- Fire Impact Fee (West Manatee Fire Rescue District, Commercial)$0.25/sq ftWest Manatee Fire Rescue DistrictWest Manatee Fire & Rescue District impact fee for new nonresidential construction in Holmes Beach: $980 for the first 5,000 sq ft of building plus $0.25 per sq ft above 5,000, measured as total area under roof. The district collects the fee itself.
- County Impact Fees (Manatee County, Commercial)$0.00Manatee CountyManatee County's impact fees (Ord. 25-15) apply only in unincorporated Manatee County, and Holmes Beach Code Sec. 2-162 excludes the city, so commercial construction there pays no county impact fee.
Where in Manatee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Holmes Beach: Industrial Impact Fees
Industrial development in Holmes Beach pays $0.25 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 50,000 sq ft building, that comes to at least $26,622.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter ($9,127.00 one-time), Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter ($4,995.00 one-time) and Fire Impact Fee (West Manatee Fire Rescue District, Industrial) ($0.25/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Facility Investment Fee (Manatee County Utilities) — over 6" meter and Potable Water Facility Investment Fee (Manatee County Utilities) — over 6" meter are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Holmes Beach Impact Fee Schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter$4,995.00 one-timeManatee County UtilitiesManatee County Utilities facility investment fee, set by water-meter size (commercial schedule); effective 10/1/2019. Meters over 6 inches are priced per gallon of daily reserve capacity.
- Potable Water Facility Investment Fee (Manatee County Utilities) — over 6" meterContact jurisdiction/utility to verifyManatee County UtilitiesCommercial meters over 6 in. pay a Manatee County Utilities potable water facility investment fee of $6.9526 per gallon per day of reserve capacity (schedule effective 10/1/2019). The total depends on the project's demand, so it is not added to the estimate.
- Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter$9,127.00 one-timeManatee County UtilitiesManatee County Utilities facility investment fee, set by water-meter size (commercial schedule); effective 10/1/2019. Meters over 6 inches are priced per gallon of daily reserve capacity.
- Wastewater Facility Investment Fee (Manatee County Utilities) — over 6" meterContact jurisdiction/utility to verifyManatee County UtilitiesCommercial meters over 6 in. pay a Manatee County Utilities wastewater facility investment fee of $17.162 per gallon per day of reserve capacity (schedule effective 10/1/2019). The total depends on the project's demand, so it is not added to the estimate.
- City Impact Fee (City of Holmes Beach, Industrial)$0.00City of Holmes BeachHolmes Beach levies no municipal impact fee on industrial construction. Its code sets none, and Sec. 2-162 confirms Manatee County's impact fees do not apply in the city.
- Fire Impact Fee (West Manatee Fire Rescue District, Industrial)$0.25/sq ftWest Manatee Fire Rescue DistrictWest Manatee Fire & Rescue District impact fee for new nonresidential construction in Holmes Beach: $980 for the first 5,000 sq ft of building plus $0.25 per sq ft above 5,000, measured as total area under roof. The district collects the fee itself.
- County Impact Fees (Manatee County, Industrial)$0.00Manatee CountyManatee County's impact fees (Ord. 25-15) apply only in unincorporated Manatee County, and Holmes Beach Code Sec. 2-162 excludes the city, so industrial construction there pays no county impact fee.
Where in Manatee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Holmes Beach: Office Impact Fees
Office development in Holmes Beach pays $0.25 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 25,000 sq ft building, that comes to at least $20,372.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter ($9,127.00 one-time), Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter ($4,995.00 one-time) and Fire Impact Fee (West Manatee Fire Rescue District, Office) ($0.25/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Facility Investment Fee (Manatee County Utilities) — over 6" meter and Potable Water Facility Investment Fee (Manatee County Utilities) — over 6" meter are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Holmes Beach Impact Fee Schedule
- Potable Water Facility Investment Fee (Manatee County Utilities) — 1" meter$4,995.00 one-timeManatee County UtilitiesManatee County Utilities facility investment fee, set by water-meter size (commercial schedule); effective 10/1/2019. Meters over 6 inches are priced per gallon of daily reserve capacity.
- Potable Water Facility Investment Fee (Manatee County Utilities) — over 6" meterContact jurisdiction/utility to verifyManatee County UtilitiesCommercial meters over 6 in. pay a Manatee County Utilities potable water facility investment fee of $6.9526 per gallon per day of reserve capacity (schedule effective 10/1/2019). The total depends on the project's demand, so it is not added to the estimate.
- Wastewater Facility Investment Fee (Manatee County Utilities) — 1" meter$9,127.00 one-timeManatee County UtilitiesManatee County Utilities facility investment fee, set by water-meter size (commercial schedule); effective 10/1/2019. Meters over 6 inches are priced per gallon of daily reserve capacity.
- Wastewater Facility Investment Fee (Manatee County Utilities) — over 6" meterContact jurisdiction/utility to verifyManatee County UtilitiesCommercial meters over 6 in. pay a Manatee County Utilities wastewater facility investment fee of $17.162 per gallon per day of reserve capacity (schedule effective 10/1/2019). The total depends on the project's demand, so it is not added to the estimate.
- City Impact Fee (City of Holmes Beach, Office)$0.00City of Holmes BeachHolmes Beach levies no municipal impact fee on office construction. Its code sets none, and Sec. 2-162 confirms Manatee County's impact fees do not apply in the city.
- Fire Impact Fee (West Manatee Fire Rescue District, Office)$0.25/sq ftWest Manatee Fire Rescue DistrictWest Manatee Fire & Rescue District impact fee for new nonresidential construction in Holmes Beach: $980 for the first 5,000 sq ft of building plus $0.25 per sq ft above 5,000, measured as total area under roof. The district collects the fee itself.
- County Impact Fees (Manatee County, Office)$0.00Manatee CountyManatee County's impact fees (Ord. 25-15) apply only in unincorporated Manatee County, and Holmes Beach Code Sec. 2-162 excludes the city, so office construction there pays no county impact fee.
Where in Manatee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Holmes Beach Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Holmes Beach Impact Fee FAQs
What are the total impact fees for a single-family home in Holmes Beach, Florida?
A new single-family home in Holmes Beach pays $13,837.00 per unit in combined impact fees (rates sourced October 21, 2026).
How much are commercial impact fees in Holmes Beach?
Commercial development in Holmes Beach pays $0.25 per square foot in impact fees, plus $14,122.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $26,622.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Holmes Beach charge its own impact fees?
Yes. Holmes Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Holmes Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Manatee County impact fees page.