Palmetto impact fees by project type
Palmetto: Single-Family Impact Fees
A new single-family home in Palmetto pays $14,231.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Manatee County-levied fees account for $7,658.00 and municipal or utility fees for $6,573.00.
The largest line items are County Educational Facilities Impact Fee (Manatee County) ($7,658.00), City Impact Fees - General Govt + Police + Parks + Roads (City of Palmetto) ($4,871.00) and Sewer Impact Fee (City of Palmetto) ($1,389.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (City of Palmetto)$313.00City of PalmettoCONFIRMED 7/13/2026 from the CODE, not the Rates & Fees page. Code Ch. 29 (Utilities) Art. III — Impact Fees, Sec. 29-82(a): water impact fee $313.00 per family dwelling unit (Ord. 2016-15, 11/7/2016). If the unit exceeds 21 plumbing fixture units, add $14.90 per FU over 21 — a canonical 3BR/2BA SFR (~15 FU) is under the threshold, so $313 flat. Collected before the initial building permit (Sec. 29-84). SEPARATE from the Ch. 29 Art. I Sec. 29-31 water CONNECTION charge (meter-size based, set by the city; not published on the Rates & Fees page — (941) 723-4570), which a developer also pays. Prior $0 placeholder was wrong: the city's Rates & Fees web page shows only monthly rates + the $3,500 fire-sprinkler fee, but the impact fee is codified.
- Sewer Impact Fee (City of Palmetto)$1,389.00City of PalmettoCONFIRMED 7/13/2026 from the CODE. Code Ch. 29 Art. III — Impact Fees, Sec. 29-83(a): sewer impact fee $1,389.00 per family dwelling unit (Ord. 2016-15, 11/7/2016). Add $66.14 per plumbing fixture unit above 21 FU — a canonical 3BR/2BA SFR (~15 FU) is under the threshold, so $1,389 flat. Collected before the initial building permit (Sec. 29-84). SEPARATE from the Sec. 29-31 sewer CONNECTION charge (not published; (941) 723-4570). Prior $0 placeholder was wrong.
- City Impact Fees - General Govt + Police + Parks + Roads (City of Palmetto)$4,871.00City of PalmettoCONFIRMED 7/13/2026 — Palmetto DOES levy non-utility city impact fees. Code Ch. 7 (Buildings) Art. IV, Div. 2, Sec. 7-75 (Ord. 2025-02, adopted 3/24/2025) sets a 4-year phased schedule. CURRENT period 7/1/2026-6/30/2027, single family: General Government $537 + Police $521 + Parks & Recreation $2,320 + Roads $1,493 = $4,871/dwelling unit. Prior year (7/1/2025-6/30/2026) was $4,458. STEPS UP: 7/1/2027-6/30/2028 = $5,284; 7/1/2028 = $5,697 — update each July 1. Sec. 7-75(a): this schedule does NOT include water/sewer connection or impact fees (those are Ch. 29, entered separately). Prior $0 'no municipal impact fee schedule published' was wrong — the schedule is codified, not posted as a PDF.
- County Educational Facilities Impact Fee (Manatee County)$7,658.00Manatee CountyCONFIRMED 7/13/2026. The Educational Facilities (school) impact fee is the ONE county impact fee assessed COUNTYWIDE and collected inside the municipalities — the county's Educational Facilities Impact Fee Invoice lists Anna Maria, Bradenton, Bradenton Beach, Holmes Beach, Longboat Key, Palmetto and Unincorporated Manatee, and directs city permits to be paid at the city/town building dept. that issues the permit. Ord. 25-15 schedule eff 9/9/2025 tiered by A/C sq ft and the SAME rate for SFR, MF and mobile home: <=750 $2,464 | 751-1,000 $4,377 | 1,001-1,300 $7,055 | 1,301-1,700 $7,252 | 1,701+ $7,658. Amount = canonical SFR tier (1,701+ sq ft). The county's OTHER impact fees (Alt Transportation, Parks & Natural Resources, Public Safety, Law Enforcement, Libraries, Admin surcharge) are collected in the UNINCORPORATED area only. Invoice valid for permits issued 9/9/2025-9/8/2026; Ord. 24-22 sets annual education increases through 2027 — recheck after 9/9/2026.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palmetto: Multifamily Impact Fees
A new multifamily unit in Palmetto pays $9,698.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Manatee County-levied fees account for $4,377.00 and municipal or utility fees for $5,321.00.
The largest line items are County Educational Facilities Impact Fee (Manatee County) (MF) ($4,377.00), City Impact Fees - General Govt + Police + Parks + Roads (City of Palmetto) (MF) ($3,619.00) and Sewer Impact Fee (City of Palmetto) (MF) ($1,389.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (City of Palmetto) (MF)$313.00City of PalmettoCONFIRMED 7/13/2026 from the CODE. Sec. 29-82(a): water impact fee $313.00 PER FAMILY DWELLING UNIT (Ord. 2016-15). Sec. 29-81 defines a family dwelling unit as any set of rooms arranged as a complete living facility for one family - i.e. each apartment/condo unit. MF = SFR here BY DESIGN (per-unit basis, not per-meter) - do NOT 'fix' this as a copy error. Add $14.90/FU above 21 fixture units per unit; a canonical 2BR/2BA MF unit (~10 FU) is well under. Sec. 29-84(c) allows an impact fee agreement for MF projects of 4+ attached units (timing only, never a lower rate). SEPARATE Sec. 29-31 connection charge also applies (not published; (941) 723-4570).
- Sewer Impact Fee (City of Palmetto) (MF)$1,389.00City of PalmettoCONFIRMED 7/13/2026 from the CODE. Sec. 29-83(a): sewer impact fee $1,389.00 PER FAMILY DWELLING UNIT (Ord. 2016-15). Per Sec. 29-81 each apartment/condo is a family dwelling unit, so MF = SFR BY DESIGN (per-unit basis) - not a copy error. Add $66.14/FU above 21 fixture units per unit; canonical 2BR/2BA MF unit (~10 FU) is under. Sec. 29-84(c) impact fee agreements available for 4+ attached-unit projects (timing only). SEPARATE Sec. 29-31 connection charge also applies.
- City Impact Fees - General Govt + Police + Parks + Roads (City of Palmetto) (MF)$3,619.00City of PalmettoCONFIRMED 7/13/2026 - Palmetto DOES levy non-utility city impact fees. Code Ch. 7 Art. IV Div. 2 Sec. 7-75 (Ord. 2025-02, adopted 3/24/2025). CURRENT period 7/1/2026-6/30/2027, MULTI-FAMILY: General Government $391 + Police $406 + Parks & Recreation $1,763 + Roads $1,059 = $3,619 PER DWELLING UNIT. (Prior year $3,513.) MF is a separate column from single family ($4,871) - not a copy. STEPS UP: 7/1/2027-6/30/2028 = $3,725; 7/1/2028 = $3,829 - update each July 1. Excludes W/S connection and impact fees (Ch. 29, separate records). Prior $0 placeholder was wrong.
- County Educational Facilities Impact Fee (Manatee County) (MF)$4,377.00Manatee CountyCONFIRMED 7/13/2026. Educational Facilities (school) impact fee is assessed COUNTYWIDE and collected inside the City of Palmetto (the city hosts the county's Educational Facilities Impact Fee Invoice in its own Document Center; paid at the city building dept. issuing the permit, one invoice PER DWELLING UNIT). Ord. 25-15 eff 9/9/2025. Tiered by A/C sq ft, SAME rate for SFR/MF/mobile home: <=750 $2,464 | 751-1,000 $4,377 | 1,001-1,300 $7,055 | 1,301-1,700 $7,252 | 1,701+ $7,658. Amount = canonical MF unit (1,000 sq ft) -> 751-1,000 tier. County's OTHER impact fees are UNINCORPORATED-only. Invoice valid 9/9/2025-9/8/2026; recheck after 9/9/2026.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palmetto: Commercial Impact Fees
Commercial development in Palmetto pays $0.51 per square foot in impact fees, plus $1,702.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $27,052.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Palmetto) ($1,389.00 one-time), Water Impact Fee (City of Palmetto) ($313.00 one-time) and General Government Impact Fee (City of Palmetto, Commercial) ($0.27/sq ft).
Road Impact Fee (City of Palmetto, Commercial) — per PM peak trip is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (City of Palmetto)$313.00 one-timeCity of PalmettoCode Ch. 29 (Utilities) Art. III — Impact Fees, Sec. 29-82(b) (Ord. 2016-15, 11-7-2016). NONRESIDENTIAL basis is per UNIT + fixture units, NOT meter size: '$313.00 per each unit to be used for purposes other than a family dwelling unit,' plus $14.90 per plumbing fixture unit for every fixture unit above 21 per unit. Amount entered = the published base ($313); the fixture-unit adder is project-specific. Collected before the initial building permit (Sec. 29-84); commercial projects may enter a payment agreement with council concurrence (Sec. 29-84(c)). Credit given for fixture units in a demolished structure (Sec. 29-82(c)). SEPARATE from the Sec. 29-31 water CONNECTION charge (meter-size based, set administratively, not published — call (941) 723-4570). Verified 2026-07-14.
- Sewer Impact Fee (City of Palmetto)$1,389.00 one-timeCity of PalmettoCode Ch. 29 Art. III, Sec. 29-83(b) (Ord. 2016-15, 11-7-2016). NONRESIDENTIAL basis is per UNIT + fixture units, NOT meter size: '$1,389.00 per each unit to be used for purposes other than a family dwelling unit,' plus $66.14 per plumbing fixture unit above 21 per unit. Amount entered = the published base ($1,389); the fixture-unit adder is project-specific. Collected before the initial building permit (Sec. 29-84). SEPARATE from the Sec. 29-31 sewer CONNECTION charge (not published — call (941) 723-4570). Verified 2026-07-14.
- General Government Impact Fee (City of Palmetto, Commercial)$0.27/sq ftCity of PalmettoCode Ch. 7 Art. IV Div. 2, Sec. 7-75(b) (Ord. 2025-02, adopted 3-24-2025). Schedule row: 'Non-Residential' — a SINGLE nonres rate with no land-use category split, so the same rate is entered for Commercial, Office and Industrial. CURRENT period 7/12/2026–6/30/2027 = $265.00 per 1,000 sq ft. Prior period (7/12/2025–6/30/2026) was $250.00. FLAT thereafter: $265 for 7/12/2027–6/30/2028 and from 7/1/2028. Sec. 7-75(a): this schedule excludes water and sewer connection/impact fees (Ch. 29, entered separately). Total Palmetto nonres = $265 GenGov + $242 Police per 1,000 sf, plus $1,451 per PM peak trip (Roads). Verified 2026-07-14.
- Police Impact Fee (City of Palmetto, Commercial)$0.24/sq ftCity of PalmettoCode Sec. 7-75(c) (Ord. 2025-02, 3-24-2025). Schedule row: 'Non-Residential' — single nonres rate, no category split. CURRENT period 7/1/2026–6/30/2027 = $242.00 per 1,000 sq ft. STEPS UP: 7/1/2027–6/30/2028 = $259; from 7/1/2028 = $275. Re-read each July 1. Verified 2026-07-14.
- Parks and Recreation Impact Fee (City of Palmetto, Commercial)$0.00City of Palmetto$0 CONFIRMED. Code Sec. 7-75(d) (Ord. 2025-02): the parks and recreation impact fee table has rows for Single Family, Multi-Family and Mobile Home ONLY — there is NO Non-Residential row, and the fee is expressly 'per dwelling unit.' The Sec. 7-75(f) totals table likewise shows nonres paying only General Government + Police (per 1,000 sf) and Roads (per PM peak trip). Verified 2026-07-14.
- Road Impact Fee (City of Palmetto, Commercial) — per PM peak tripContact jurisdiction/utility to verifyCity of PalmettoCode Sec. 7-75(e) (Ord. 2025-02, 3-24-2025). NONRESIDENTIAL road impact fee is charged PER PM PEAK TRIP, not per square foot — exotic basis, new Rate Type choice added. Schedule row: 'Non-Residential (1)'; footnote (1): estimated PM peak trips are supplied by the applicant's certified traffic engineer, and the city may require supporting documentation. CURRENT period 7/12/2026–6/30/2027 = $1,451.00 per PM peak trip. STEPS UP: 7/12/2027–6/30/2028 = $1,571; from 7/12/2028 = $1,691. Single nonres rate — no land-use category split. Verified 2026-07-14.
- Fire Impact Fee (City of Palmetto, Commercial)$0.00City of Palmetto Fire RescueConfirmed $0 — the City of Palmetto levies NO fire impact fee. Code Ch. 7, Art. IV, Div. 2, § 7-75 (Ord. 2025-02, § 3(Exh. A), adopted 3-24-25) is the city's complete impact-fee schedule and contains only General Government, Police, Parks & Recreation and Road fees; § 7-52 lists 'police and fire fees' as a category the article may reach, but no fire fee is adopted or scheduled. Fire service is a municipal department (City of Palmetto Fire Rescue), not an independent fire district, so no district fee applies in-city either. Verified against the codified text on audit 2026-07-14; Unconfirmed cleared.
- County Impact Fees (Manatee County, Commercial)$0.00Manatee County$0 CONFIRMED. Manatee County's nonresidential impact fees are collected in the UNINCORPORATED area ONLY. The one county fee assessed countywide inside the municipalities is Educational Facilities (school), which has NO nonresidential rows in the Ord. 25-15 schedule (eff. 9/9/2025). Net county overlay on nonres inside Palmetto = $0. Verified 2026-07-14.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palmetto: Industrial Impact Fees
Industrial development in Palmetto pays $0.51 per square foot in impact fees, plus $1,702.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $27,052.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Palmetto) ($1,389.00 one-time), Water Impact Fee (City of Palmetto) ($313.00 one-time) and General Government Impact Fee (City of Palmetto, Industrial) ($0.27/sq ft).
Road Impact Fee (City of Palmetto, Industrial) — per PM peak trip is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (City of Palmetto)$313.00 one-timeCity of PalmettoCode Ch. 29 (Utilities) Art. III — Impact Fees, Sec. 29-82(b) (Ord. 2016-15, 11-7-2016). NONRESIDENTIAL basis is per UNIT + fixture units, NOT meter size: '$313.00 per each unit to be used for purposes other than a family dwelling unit,' plus $14.90 per plumbing fixture unit for every fixture unit above 21 per unit. Amount entered = the published base ($313); the fixture-unit adder is project-specific. Collected before the initial building permit (Sec. 29-84); commercial projects may enter a payment agreement with council concurrence (Sec. 29-84(c)). Credit given for fixture units in a demolished structure (Sec. 29-82(c)). SEPARATE from the Sec. 29-31 water CONNECTION charge (meter-size based, set administratively, not published — call (941) 723-4570). Verified 2026-07-14.
- Sewer Impact Fee (City of Palmetto)$1,389.00 one-timeCity of PalmettoCode Ch. 29 Art. III, Sec. 29-83(b) (Ord. 2016-15, 11-7-2016). NONRESIDENTIAL basis is per UNIT + fixture units, NOT meter size: '$1,389.00 per each unit to be used for purposes other than a family dwelling unit,' plus $66.14 per plumbing fixture unit above 21 per unit. Amount entered = the published base ($1,389); the fixture-unit adder is project-specific. Collected before the initial building permit (Sec. 29-84). SEPARATE from the Sec. 29-31 sewer CONNECTION charge (not published — call (941) 723-4570). Verified 2026-07-14.
- General Government Impact Fee (City of Palmetto, Industrial)$0.27/sq ftCity of PalmettoSec. 7-75(b), Ord. 2025-02. Schedule row 'Non-Residential' (single nonres rate). Current 7/12/2026–6/30/2027 = $265.00 per 1,000 sq ft; flat at $265 thereafter. Verified 2026-07-14.
- Police Impact Fee (City of Palmetto, Industrial)$0.24/sq ftCity of PalmettoSec. 7-75(c), Ord. 2025-02. 'Non-Residential' row, single rate. Current 7/1/2026–6/30/2027 = $242.00 per 1,000 sq ft; steps to $259 on 7/1/2027 and $275 on 7/1/2028. Verified 2026-07-14.
- Parks and Recreation Impact Fee (City of Palmetto, Industrial)$0.00City of Palmetto$0 CONFIRMED. Sec. 7-75(d): parks & recreation impact fee is per dwelling unit with no Non-Residential row; the Sec. 7-75(f) totals confirm nonres pays only General Government + Police + Roads. Verified 2026-07-14.
- Road Impact Fee (City of Palmetto, Industrial) — per PM peak tripContact jurisdiction/utility to verifyCity of PalmettoSec. 7-75(e), Ord. 2025-02. Nonres road fee is PER PM PEAK TRIP. Current 7/12/2026–6/30/2027 = $1,451.00; steps to $1,571 on 7/12/2027 and $1,691 on 7/12/2028. Single nonres rate. Verified 2026-07-14.
- County Impact Fees (Manatee County, Industrial)$0.00Manatee County$0 CONFIRMED. County nonres impact fees are unincorporated-only; the countywide Educational Facilities fee has no nonres rows. Net county overlay on nonres inside Palmetto = $0. Verified 2026-07-14.
- Fire Impact Fee (City of Palmetto, Industrial)$0.00City of Palmetto Fire RescueConfirmed $0 — the City of Palmetto levies NO fire impact fee. Code Ch. 7, Art. IV, Div. 2, § 7-75 (Ord. 2025-02, § 3(Exh. A), adopted 3-24-25) is the city's complete impact-fee schedule and contains only General Government, Police, Parks & Recreation and Road fees; § 7-52 lists 'police and fire fees' as a category the article may reach, but no fire fee is adopted or scheduled. Fire service is a municipal department (City of Palmetto Fire Rescue), not an independent fire district, so no district fee applies in-city either. Verified against the codified text on audit 2026-07-14; Unconfirmed cleared.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palmetto: Office Impact Fees
Office development in Palmetto pays $0.51 per square foot in impact fees, plus $1,702.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $14,377.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Palmetto) ($1,389.00 one-time), Water Impact Fee (City of Palmetto) ($313.00 one-time) and General Government Impact Fee (City of Palmetto, Office) ($0.27/sq ft).
Road Impact Fee (City of Palmetto, Office) — per PM peak trip is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (City of Palmetto)$313.00 one-timeCity of PalmettoCode Ch. 29 (Utilities) Art. III — Impact Fees, Sec. 29-82(b) (Ord. 2016-15, 11-7-2016). NONRESIDENTIAL basis is per UNIT + fixture units, NOT meter size: '$313.00 per each unit to be used for purposes other than a family dwelling unit,' plus $14.90 per plumbing fixture unit for every fixture unit above 21 per unit. Amount entered = the published base ($313); the fixture-unit adder is project-specific. Collected before the initial building permit (Sec. 29-84); commercial projects may enter a payment agreement with council concurrence (Sec. 29-84(c)). Credit given for fixture units in a demolished structure (Sec. 29-82(c)). SEPARATE from the Sec. 29-31 water CONNECTION charge (meter-size based, set administratively, not published — call (941) 723-4570). Verified 2026-07-14.
- Sewer Impact Fee (City of Palmetto)$1,389.00 one-timeCity of PalmettoCode Ch. 29 Art. III, Sec. 29-83(b) (Ord. 2016-15, 11-7-2016). NONRESIDENTIAL basis is per UNIT + fixture units, NOT meter size: '$1,389.00 per each unit to be used for purposes other than a family dwelling unit,' plus $66.14 per plumbing fixture unit above 21 per unit. Amount entered = the published base ($1,389); the fixture-unit adder is project-specific. Collected before the initial building permit (Sec. 29-84). SEPARATE from the Sec. 29-31 sewer CONNECTION charge (not published — call (941) 723-4570). Verified 2026-07-14.
- General Government Impact Fee (City of Palmetto, Office)$0.27/sq ftCity of PalmettoSec. 7-75(b), Ord. 2025-02. Schedule row 'Non-Residential' (single nonres rate, no category split). Current 7/12/2026–6/30/2027 = $265.00 per 1,000 sq ft; flat at $265 thereafter. Verified 2026-07-14.
- Police Impact Fee (City of Palmetto, Office)$0.24/sq ftCity of PalmettoSec. 7-75(c), Ord. 2025-02. 'Non-Residential' row, single rate. Current 7/1/2026–6/30/2027 = $242.00 per 1,000 sq ft; steps to $259 on 7/1/2027 and $275 on 7/1/2028. Verified 2026-07-14.
- Parks and Recreation Impact Fee (City of Palmetto, Office)$0.00City of Palmetto$0 CONFIRMED. Sec. 7-75(d): parks & recreation impact fee is per dwelling unit with no Non-Residential row; the Sec. 7-75(f) totals confirm nonres pays only General Government + Police + Roads. Verified 2026-07-14.
- Road Impact Fee (City of Palmetto, Office) — per PM peak tripContact jurisdiction/utility to verifyCity of PalmettoSec. 7-75(e), Ord. 2025-02. Nonres road fee is PER PM PEAK TRIP (applicant's certified traffic engineer supplies the trip estimate). Current 7/12/2026–6/30/2027 = $1,451.00; steps to $1,571 on 7/12/2027 and $1,691 on 7/12/2028. Single nonres rate. Verified 2026-07-14.
- Fire Impact Fee (City of Palmetto, Office)$0.00City of Palmetto Fire RescueConfirmed $0 — the City of Palmetto levies NO fire impact fee. Code Ch. 7, Art. IV, Div. 2, § 7-75 (Ord. 2025-02, § 3(Exh. A), adopted 3-24-25) is the city's complete impact-fee schedule and contains only General Government, Police, Parks & Recreation and Road fees; § 7-52 lists 'police and fire fees' as a category the article may reach, but no fire fee is adopted or scheduled. Fire service is a municipal department (City of Palmetto Fire Rescue), not an independent fire district, so no district fee applies in-city either. Verified against the codified text on audit 2026-07-14; Unconfirmed cleared.
- County Impact Fees (Manatee County, Office)$0.00Manatee County$0 CONFIRMED. County nonres impact fees are unincorporated-only; the countywide Educational Facilities fee has no nonres rows. Net county overlay on nonres inside Palmetto = $0. Verified 2026-07-14.
Where in Manatee County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Palmetto
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Palmetto, Florida?
A new single-family home in Palmetto pays $14,231.00 per unit in combined impact fees (rates sourced July 14, 2026).
How much are commercial impact fees in Palmetto?
Commercial development in Palmetto pays $0.51 per square foot in impact fees, plus $1,702.00 in one-time water and sewer connection fees, at least $27,052.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Palmetto charge its own impact fees?
Yes. Palmetto levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Palmetto, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Manatee County impact fees page.