IMPACTFEES.ORG

Marion County, Florida Impact Fees

Impact fees in Marion County depend on where you build. This page details the rates for unincorporated Marion County: $13,753.00 per single-family unit as of July 14, 2026. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Marion County impact fees by project type

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Marion County: Single-Family Impact Fees

A new single-family home in unincorporated Marion County pays $13,753.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Marion County.

The largest line items are Educational Facilities Impact Fee (Marion County Schools) ($4,307.00), Sewer Connection Fee (Marion County Utilities) ($3,844.00) and Transportation Impact Fee (Marion County - ≤1,500 sf) ($3,072.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,659.00
  • Water Connection Fee (Marion County Utilities)
    Marion County Utilities
    Marion County Utilities Water Capital Charge = $1,659 ($702 transmission + $957 treatment), per the MCU published rate schedule. Verified 7/13/2026 — figure unchanged.
    $1,659.00
Sewer$3,844.00
  • Sewer Connection Fee (Marion County Utilities)
    Marion County Utilities
    Marion County Utilities Wastewater Capital Charge = $3,844 ($660 transmission + $3,184 treatment), per the MCU published rate schedule. Verified 7/13/2026 — figure unchanged.
    $3,844.00
City$0.00
  • City Impact Fees (Marion County — Unincorporated, N/A)
    N/A
    $0 City placeholder — unincorporated Marion County has no municipal government, so no city-level impact fees apply. County overlay fees (Transportation, Fire, EMS, Education) captured in County-type records; utility fees in MCU Water/Sewer records.
    $0.00
County$8,250.00
  • Educational Facilities Impact Fee (Marion County Schools)
    Marion County School Board
    Marion County Educational System Impact Fee, Ord. 2024-06 (adopted 3/5/2024, eff. 7/1/2024), codified at Code Ch. 10 Art. XV §10-431(b). Single Family Detached / Mobile Home on a Lot = $4,307/DU. §10-431(b) imposes the fee on all residential construction countywide, 'both within the unincorporated area and within the municipal boundaries of the cities' — BUT the County's notice states collection within a municipality does not occur until a county–city interlocal agreement is in place (Ocala's own impact-fee page confirms it collects this fee). MF apt tiers: 1-700sf $1,604; 701-900sf $3,847; 901-1,200sf $4,337; >1,200sf $5,525; condos $1,990. Source re-pointed 7/13/2026 from a news-release page to the adopted ordinance.
    $4,307.00
  • Transportation Impact Fee (Marion County - ≤1,500 sf)
    Marion County
    Marion County Transportation Impact Fee, Ord. 25-18 (eff. 10/1/2025). PHASED: 70% (10/1/2025), 80% (10/1/2026), 90% (10/1/2027), 100% (10/1/2028). Current 70% SFR rates: ≤1,500sf $3,072; 1,501-2,499sf $3,723; 2,500+sf $4,099. NEXT STEP 10/1/2026 (80%): $3,510 / $4,254 / $4,684. Applies in unincorporated Marion plus Belleview, Dunnellon, Ocala, Reddick and McIntosh. Verified 7/13/2026 against the adopted schedule.
    $3,072.00
  • Fire Protection Impact Fee (Marion County - ≤1,500 sf)
    Marion County
    Marion County Fire Protection Impact Fee, Ord. 25-17 (eff. 10/1/2025). Per §10-337(b)/§10-340(a) applies in unincorporated Marion County and within Belleview, Dunnellon, Reddick and McIntosh ONLY — expressly NOT within the City of Ocala. SFR: ≤1,500sf $663; 1,501-2,499sf $753; 2,500+sf $829. MF flat $505/DU. Verified 7/13/2026 against the adopted schedule.
    $663.00
  • EMS Impact Fee (Marion County - ≤1,500 sf)
    Marion County
    Marion County EMS Impact Fee, Ord. 25-17 (adopted 5/23/2025, eff. 10/1/2025) at 100%. Per Ord. 25-17 §10-337(a), the EMS fee applies COUNTYWIDE — unincorporated plus all municipal areas, including Ocala. SFR: ≤1,500sf $208; 1,501-2,499sf $238; 2,500+sf $261. MF flat $173/DU. (Fire Protection, by contrast, does NOT apply in Ocala — §10-337(b).) Verified 7/13/2026 against the adopted Fire Rescue & EMS Impact Fee Schedule.
    $208.00
Total (unincorporated Marion County): $13,753.00
Sources last checked July 14, 2026Official fee schedules:Marion County Utilities Marion County School Board Marion County

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Marion County: Multifamily Impact Fees

A new multifamily unit in unincorporated Marion County pays $12,206.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Marion County.

The largest line items are Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00), Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18) ($1,688.00) and Fire Protection Impact Fee (MF - Ord. 25-17) ($505.00).

Water Connection Fee (MF - Marion County Utilities) and Sewer Connection Fee (MF - Marion County Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,659.00
  • Water Connection Fee (MF - Marion County Utilities)
    Marion County Utilities
    Marion County Utilities Water Capital Charge = $1,659 ($702 transmission + $957 treatment). FLAGGED UNCONFIRMED 7/13/2026: the MCU published rate schedule states a SINGLE water capital charge with no meter-size or ERU breakdown and no stated multifamily/per-dwelling-unit basis. The $1,659 here is therefore the SFR figure carried across, which may overstate the true per-unit MF charge if MCU assesses it per ERU (an apartment unit is typically <1.0 ERU). Confirm the MF basis with Marion County Utilities Customer Service, (352) 307-6000, before relying on this figure.
    $1,659.00Requires confirmation
Sewer$3,844.00
  • Sewer Connection Fee (MF - Marion County Utilities)
    Marion County Utilities
    Marion County Utilities Wastewater Capital Charge = $3,844 ($660 transmission + $3,184 treatment). FLAGGED UNCONFIRMED 7/13/2026: the MCU published rate schedule states a SINGLE wastewater capital charge with no meter-size or ERU breakdown and no stated multifamily/per-dwelling-unit basis. The $3,844 here is the SFR figure carried across, which may overstate the true per-unit MF charge if assessed per ERU. Confirm the MF basis with Marion County Utilities Customer Service, (352) 307-6000.
    $3,844.00Requires confirmation
City$0.00
  • City Impact Fees (Marion County — Unincorporated, MF, N/A)
    N/A
    $0 City placeholder — unincorporated Marion County has no municipal government, so no city-level impact fees apply. County overlay fees (Transportation, Fire, EMS, Education) are captured in the County-type records; utility fees in the Marion County Utilities Water/Sewer records. Confirmed $0, not unverified.
    $0.00
County$6,703.00
  • Educational System Impact Fee (MF Apt 901-1200 sf)
    Marion County School Board
    Marion County Educational System Impact Fee, Ord. 2024-06 (eff. 7/1/2024), Code §10-431(b). Multi-Family Apartment 901-1,200 sq ft = $4,337/DU. DEFAULT MF tier — the canonical 1,000 sq ft unit falls in this bracket. Other tiers: 1-700sf $1,604; 701-900sf $3,847; >1,200sf $5,525; Condominiums $1,990 (separate land-use category, not a size tier). Source re-pointed 7/13/2026 from a news-release page to the adopted ordinance.
    $4,337.00
  • Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)
    Marion County
    Marion County Transportation Impact Fee, Ord. 25-18, eff. 10/1/2025. ITE 221/222 MF Mid/High-Rise (4+ floors) = $1,688/DU at the current 70% phase. DEFAULT MF tier (canonical unit is 4 stories). PHASED: 80% eff. 10/1/2026 = $1,930; 90% 10/1/2027 = $2,171; 100% 10/1/2028 = $2,412. Verified 7/13/2026.
    $1,688.00
  • Fire Protection Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County Fire Protection Impact Fee, Ord. 25-17, eff. 10/1/2025. Multi-Family (ITE 220/221/222) = $505/DU, flat. Imposed in the unincorporated area and within Belleview, Dunnellon, Reddick and McIntosh — NOT Ocala (§10-337(b)). Verified 7/13/2026.
    $505.00
  • EMS Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County EMS Impact Fee, Ord. 25-17, eff. 10/1/2025. Multi-Family = $173/DU, flat. §10-337(a): imposed countywide including all municipal areas. Verified 7/13/2026.
    $173.00
Total (unincorporated Marion County): $12,206.00
Sources last checked July 14, 2026Official fee schedules:Marion County Utilities Marion County School Board Marion County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Marion County: Commercial Impact Fees

Commercial development in unincorporated Marion County pays $6.22 per square foot in impact fees, plus $5,503.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $316,303.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capital Charge (Marion County Utilities) — 1.0 ERC ($3,844.00 one-time), Water Capital Charge (Marion County Utilities) — 1.0 ERC ($1,659.00 one-time) and Transportation Impact Fee (Marion County, Commercial) ($4.50/sq ft).

View the full fee schedule
Water$1,659.00 one-time
  • Water Capital Charge (Marion County Utilities) — 1.0 ERC
    Marion County Utilities
    ⚠ NO METER LADDER PUBLISHED — ERC-based. Code §19-187(a) Table I (rate set 4/17/2018, still current; reconfirmed on the Utilities rate page 7/2026): water capital charge = $1,659.00 per ERC ($702 transmission + $957 treatment). §19-187 defines the water ERC as an LOS of 400 gpd maximum-day flow; a single-family residence = 1.0 ERC; 'ERC values for all other non-residential customers are calculated based upon the estimated flow rates by establishment as identified in section 6.14.4 of the Marion County LDC, table 6.14-1' — assumed gallons for all fixture units are summed and divided by 400 gpd. Entered here: the published 1.0-ERC charge (the nonres floor). Multiply by the LDC Table 6.14-1 flow-derived ERC count for a specific use. MCU's meter-size ladders (5/8"–8") apply to MONTHLY base charges only, not to the capital charge. Also serves parts of Reddick/McIntosh area via county mains. Rate is not indexed — unchanged since 2018.
    $1,659.00 one-time
Sewer$3,844.00 one-time
  • Wastewater Capital Charge (Marion County Utilities) — 1.0 ERC
    Marion County Utilities
    ⚠ NO METER LADDER PUBLISHED — ERC-based. Code §19-187(a) Table I (rate set 4/17/2018, still current): wastewater capital charge = $3,844.00 per ERC ($660 transmission + $3,184 treatment). §19-187 defines the wastewater ERC as an LOS of 200 gpd average daily flow; SFR = 1.0 ERC, each MF unit = 0.80; nonres ERC counts come from Marion County LDC §6.14.4 Table 6.14-1 estimated flow rates by establishment (fixture-unit gallons summed ÷ 200 gpd). Entered here: the published 1.0-ERC charge (nonres floor). Combined water + wastewater at 1.0 ERC = $5,503. Rate unchanged since 2018 — not indexed.
    $3,844.00 one-time
City$0.00
  • City Impact Fees (Marion County - Unincorporated, Commercial)
    N/A — unincorporated area
    CONFIRMED $0 — N/A. No municipal government exists in the unincorporated area, so no City-level impact fee is possible. County fees are recorded on the County-type records.
    $0.00
County$6.22/sq ft
  • Transportation Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Ord. No. 25-18. Marion County Transportation Impact Fee Rates, eff. 10/1/2025 (70% phase). Schedule row: ITE 821 Retail 40,001 to 150,000 sfgla, $4,505 per 1,000 sfgla — the tier containing 50,000 sf GFA. Basis = sfgla (gross leasable area) for retail rows. Phase-in: 80% eff. 10/1/2026 ($5,148), 90% eff. 10/1/2027 ($5,792), 100% eff. 10/1/2028 ($6,435). NEXT STEP-UP 10/1/2026 — re-read then. Applies countywide: unincorporated Marion plus Belleview, Dunnellon, Ocala, Reddick and McIntosh.
    $4.50/sq ft
  • Fire Protection Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 821 Retail 40,001 to 150,000 sfgla, Fire Protection column $1,306 per 1,000 sfgla. Applies in the unincorporated area and in Belleview, Dunnellon, Reddick and McIntosh — NOT in Ocala.
    $1.31/sq ft
  • EMS Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Ord. No. 25-17 (Marion County Fire Protection & EMS Impact Fee Rates), eff. 10/1/2025. Schedule row: ITE 821 Retail 40,001 to 150,000 sfgla, EMS column $405 per 1,000 sfgla. Single rate, no phase-in published. EMS applies in the unincorporated area and all 5 municipalities.
    $0.41/sq ft
Total (unincorporated Marion County): $6.22/sq ft + $5,503.00 one-time (≈ $316,303.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Marion County Utilities Marion County Board of County Commissioners

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Marion County: Industrial Impact Fees

Industrial development in unincorporated Marion County pays $1.78 per square foot in impact fees, plus $5,503.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $94,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capital Charge (Marion County Utilities) — 1.0 ERC ($3,844.00 one-time), Water Capital Charge (Marion County Utilities) — 1.0 ERC ($1,659.00 one-time) and Transportation Impact Fee (Marion County, Industrial) ($1.50/sq ft).

View the full fee schedule
Water$1,659.00 one-time
  • Water Capital Charge (Marion County Utilities) — 1.0 ERC
    Marion County Utilities
    ⚠ NO METER LADDER PUBLISHED — ERC-based. Code §19-187(a) Table I (rate set 4/17/2018, still current; reconfirmed on the Utilities rate page 7/2026): water capital charge = $1,659.00 per ERC ($702 transmission + $957 treatment). §19-187 defines the water ERC as an LOS of 400 gpd maximum-day flow; a single-family residence = 1.0 ERC; 'ERC values for all other non-residential customers are calculated based upon the estimated flow rates by establishment as identified in section 6.14.4 of the Marion County LDC, table 6.14-1' — assumed gallons for all fixture units are summed and divided by 400 gpd. Entered here: the published 1.0-ERC charge (the nonres floor). Multiply by the LDC Table 6.14-1 flow-derived ERC count for a specific use. MCU's meter-size ladders (5/8"–8") apply to MONTHLY base charges only, not to the capital charge. Also serves parts of Reddick/McIntosh area via county mains. Rate is not indexed — unchanged since 2018.
    $1,659.00 one-time
Sewer$3,844.00 one-time
  • Wastewater Capital Charge (Marion County Utilities) — 1.0 ERC
    Marion County Utilities
    ⚠ NO METER LADDER PUBLISHED — ERC-based. Code §19-187(a) Table I (rate set 4/17/2018, still current): wastewater capital charge = $3,844.00 per ERC ($660 transmission + $3,184 treatment). §19-187 defines the wastewater ERC as an LOS of 200 gpd average daily flow; SFR = 1.0 ERC, each MF unit = 0.80; nonres ERC counts come from Marion County LDC §6.14.4 Table 6.14-1 estimated flow rates by establishment (fixture-unit gallons summed ÷ 200 gpd). Entered here: the published 1.0-ERC charge (nonres floor). Combined water + wastewater at 1.0 ERC = $5,503. Rate unchanged since 2018 — not indexed.
    $3,844.00 one-time
City$0.00
  • City Impact Fees (Marion County - Unincorporated, Industrial)
    N/A — unincorporated area
    CONFIRMED $0 — N/A. No municipal government exists in the unincorporated area. County fees are recorded on the County-type records.
    $0.00
County$1.78/sq ft
  • Transportation Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Ord. No. 25-18, eff. 10/1/2025 (70% phase). Schedule row: ITE 110 General Light Industrial, $1,502 per 1,000 sf GFA. Phase-in: $1,716 (10/1/2026), $1,931 (10/1/2027), $2,145 (10/1/2028). NEXT STEP-UP 10/1/2026. Applies countywide incl. all 5 municipalities.
    $1.50/sq ft
  • Fire Protection Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 110 General Light Industrial, Fire Protection column $214 per 1,000 sf GFA.
    $0.21/sq ft
  • EMS Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 110 General Light Industrial, EMS column $66 per 1,000 sf GFA.
    $0.07/sq ft
Total (unincorporated Marion County): $1.78/sq ft + $5,503.00 one-time (≈ $94,603.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Marion County Utilities Marion County Board of County Commissioners

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Marion County: Office Impact Fees

Office development in unincorporated Marion County pays $3.93 per square foot in impact fees, plus $5,503.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $103,728.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Capital Charge (Marion County Utilities) — 1.0 ERC ($3,844.00 one-time), Water Capital Charge (Marion County Utilities) — 1.0 ERC ($1,659.00 one-time) and Transportation Impact Fee (Marion County, Office) ($3.34/sq ft).

View the full fee schedule
Water$1,659.00 one-time
  • Water Capital Charge (Marion County Utilities) — 1.0 ERC
    Marion County Utilities
    ⚠ NO METER LADDER PUBLISHED — ERC-based. Code §19-187(a) Table I (rate set 4/17/2018, still current; reconfirmed on the Utilities rate page 7/2026): water capital charge = $1,659.00 per ERC ($702 transmission + $957 treatment). §19-187 defines the water ERC as an LOS of 400 gpd maximum-day flow; a single-family residence = 1.0 ERC; 'ERC values for all other non-residential customers are calculated based upon the estimated flow rates by establishment as identified in section 6.14.4 of the Marion County LDC, table 6.14-1' — assumed gallons for all fixture units are summed and divided by 400 gpd. Entered here: the published 1.0-ERC charge (the nonres floor). Multiply by the LDC Table 6.14-1 flow-derived ERC count for a specific use. MCU's meter-size ladders (5/8"–8") apply to MONTHLY base charges only, not to the capital charge. Also serves parts of Reddick/McIntosh area via county mains. Rate is not indexed — unchanged since 2018.
    $1,659.00 one-time
Sewer$3,844.00 one-time
  • Wastewater Capital Charge (Marion County Utilities) — 1.0 ERC
    Marion County Utilities
    ⚠ NO METER LADDER PUBLISHED — ERC-based. Code §19-187(a) Table I (rate set 4/17/2018, still current): wastewater capital charge = $3,844.00 per ERC ($660 transmission + $3,184 treatment). §19-187 defines the wastewater ERC as an LOS of 200 gpd average daily flow; SFR = 1.0 ERC, each MF unit = 0.80; nonres ERC counts come from Marion County LDC §6.14.4 Table 6.14-1 estimated flow rates by establishment (fixture-unit gallons summed ÷ 200 gpd). Entered here: the published 1.0-ERC charge (nonres floor). Combined water + wastewater at 1.0 ERC = $5,503. Rate unchanged since 2018 — not indexed.
    $3,844.00 one-time
City$0.00
  • City Impact Fees (Marion County - Unincorporated, Office)
    N/A — unincorporated area
    CONFIRMED $0 — N/A. No municipal government exists in the unincorporated area. County fees are recorded on the County-type records.
    $0.00
County$3.93/sq ft
  • Transportation Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Ord. No. 25-18, eff. 10/1/2025 (70% phase). Schedule row: ITE 710 Office, $3,336 per 1,000 sf GFA (no size tiers). Phase-in: $3,813 (10/1/2026), $4,289 (10/1/2027), $4,766 (10/1/2028). NEXT STEP-UP 10/1/2026. Applies countywide incl. all 5 municipalities.
    $3.34/sq ft
  • Fire Protection Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 710 Office, Fire Protection column $453 per 1,000 sf GFA.
    $0.45/sq ft
  • EMS Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 710 Office, EMS column $140 per 1,000 sf GFA.
    $0.14/sq ft
Total (unincorporated Marion County): $3.93/sq ft + $5,503.00 one-time (≈ $103,728.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Marion County Utilities Marion County Board of County Commissioners

Estimate your project in Marion County

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are single-family impact fees in Marion County, Florida?

A new single-family home in unincorporated Marion County pays $13,753.00 per unit in impact fees (rates sourced July 14, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Marion County?

Multifamily development in unincorporated Marion County pays $12,206.00 per unit in impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Marion County?

Commercial development in unincorporated Marion County pays $6.22 per square foot in impact fees, plus $5,503.00 in one-time water and sewer connection fees, about $316,303.00 for a 50,000 sq ft building.

Do cities in Marion County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 4 of 5 cities in Marion County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000