Belleview, Florida Impact Fees

Belleview applies its own fee schedule: municipal fees plus the Marion County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,887.11 per unit (rates sourced ). The full breakdown is below.

Belleview Impact Fees by Project Type

Belleview: Single-Family Impact Fees

A new single-family home in Belleview pays $17,887.11 per unit in impact fees (rates sourced October 21, 2026). Of that, Marion County-levied fees account for $9,552.00 and municipal or utility fees for $8,335.11.

The largest line items are Sewer — City of Belleview — SFR 1,201–2,000sf ($4,884.00), Educational Facilities Impact Fee (Marion County Schools) ($4,307.00) and Transportation Impact Fee (Marion County - 1,501-2,499 sf) ($4,254.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Belleview Impact Fee Schedule
Water$1,597.20
  • Water — City of Belleview — SFR 1,201–2,000sf
    1,201–2,000 sf (330 gpd)
    City
    City of Belleview water System Development Charge, Code §86-82 and Appendix B, Table 3.G. The SDC equals the inside-city rate per gpd times anticipated flow, tiered by unit floor area (≤1,200 sf 290 gpd; 1,201–2,000 sf 330 gpd; >2,000 sf 450 gpd). At the Jan. 1, 2026 inside-city rate of $4.84/gpd, the 1,201–2,000 sf tier is 330 × $4.84 = $1,597.20. Upcoming steps: 1/1/2027 $5.31/gpd, 1/1/2028 $5.78/gpd; outside-city rate capped at 150% of the inside charge. Applies to development served by City of Belleview water.
    $1,597.20
Sewer$4,884.00
  • Sewer — City of Belleview — SFR 1,201–2,000sf
    1,201–2,000 sf (330 gpd)
    City
    City of Belleview sewer System Development Charge, Code §86-82 and Appendix B, Table 3.G. The SDC equals the inside-city rate per gpd times anticipated flow, tiered by unit floor area (≤1,200 sf 290 gpd; 1,201–2,000 sf 330 gpd; >2,000 sf 450 gpd). At the Jan. 1, 2026 inside-city rate of $14.80/gpd, the 1,201–2,000 sf tier is 330 × $14.80 = $4,884.00. Upcoming steps: 1/1/2027 $16.25/gpd, 1/1/2028 $17.70/gpd; outside-city development also pays a system upgrade-zone charge, total capped at 150% of the inside charge. Applies to development served by City of Belleview sewer.
    $4,884.00
City$1,853.91
  • Parks and Recreation Impact Fee (City of Belleview)
    City of Belleview
    City of Belleview parks and recreation impact fee (Code Ch. 58 Art. III, Ord. 2007-04): $1,401.91 per single-family detached home, paid with the building permit. Residential development only; mobile homes pay $1,027.65.
    $1,401.91
  • Police Impact Fee (City of Belleview)
    City of Belleview
    City of Belleview police services impact fee (Code Ch. 50 Art. IV, Ord. 2022-05, effective 2022): $452 per residential unit, paid when the building permit is issued.
    $452.00
County$9,552.00
  • Educational Facilities Impact Fee (Marion County Schools)
    Marion County School Board
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). Flat $4,307 per single-family detached / mobile-home dwelling unit. Applies countywide in all unincorporated and incorporated areas.
    $4,307.00
  • Transportation Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County transportation impact fee (Ord. 25-18, Code Sec. 10-327(b)), charged countywide including inside every city and phased in each October 1. Single-family detached homes are tiered by heated area: 1,500 sq ft or less $3,510; 1,501 to 2,499 sq ft $4,254; 2,500 sq ft or more $4,684 (the 80% step, effective October 1, 2026). Next steps: 90% on October 1, 2027 ($3,949 / $4,786 / $5,270) and 100% on October 1, 2028 ($4,388 / $5,318 / $5,855). Paid before the certificate of occupancy.
    $4,254.00
  • Fire Protection Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County fire protection impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in. Charged in unincorporated Marion County and inside Belleview, Dunnellon, Reddick and McIntosh; not charged in the City of Ocala, which levies its own fire impact fee. Single-family homes are tiered by heated area: 1,500 sq ft or less $663; 1,501 to 2,499 sq ft $753; 2,500 sq ft or more $829. Paid before the certificate of occupancy.
    $753.00
  • EMS Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County EMS impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in. Charged countywide, in unincorporated Marion County and inside every city including Ocala. Single-family homes are tiered by heated area: 1,500 sq ft or less $208; 1,501 to 2,499 sq ft $238; 2,500 sq ft or more $261. Paid before the certificate of occupancy.
    $238.00
Total (Belleview): $17,887.11
Sources last checked Official fee schedules:City City of Belleview Marion County School Board Marion County

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Belleview: Multifamily Impact Fees

A new multifamily unit in Belleview pays at least $14,132.93 per unit in impact fees (rates sourced October 21, 2026). Of that, Marion County-levied fees account for $6,945.00 and municipal or utility fees for $7,187.93.

The largest line items are Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00), Sewer — City of Belleview — MF per unit ($4,292.00) and Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18) ($1,930.00).

City Impact Fees (City of Belleview, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Belleview Impact Fee Schedule
Water$1,403.60
  • Water — City of Belleview — MF per unit
    ≤1,200 sf unit (290 gpd)
    City of Belleview
    City of Belleview water System Development Charge, Code §86-82 and Appendix B, Table 3.G. The §86-82(e) flow chart covers residential units (single or multifamily) per dwelling unit, tiered by unit floor area; a canonical ~1,000 sf MF unit falls in the ≤1,200 sf / 290 gpd bracket. At the Jan. 1, 2026 inside-city rate of $4.84/gpd, that is 290 × $4.84 = $1,403.60 per unit. Upcoming step 1/1/2027 to $5.31/gpd ($1,539.90). Applies to development served by City of Belleview water.
    $1,403.60
Sewer$4,292.00
  • Sewer — City of Belleview — MF per unit
    ≤1,200 sf unit (290 gpd)
    City of Belleview
    City of Belleview sewer System Development Charge, Code §86-82 and Appendix B, Table 3.G. The §86-82(e) flow chart covers residential units (single or multifamily) per dwelling unit, tiered by unit floor area; a canonical ~1,000 sf MF unit falls in the ≤1,200 sf / 290 gpd bracket. At the Jan. 1, 2026 inside-city rate of $14.80/gpd, that is 290 × $14.80 = $4,292.00 per unit. Upcoming step 1/1/2027 to $16.25/gpd ($4,712.50). Applies to development served by City of Belleview sewer.
    $4,292.00
City$1,492.33
  • Parks and Recreation Impact Fee (City of Belleview, MF)
    City of Belleview
    City of Belleview parks and recreation impact fee (Code Ch. 58 Art. III, Ord. 2007-04): $1,040.33 per multifamily dwelling unit (apartments, duplexes, condominiums and townhomes), paid with the building permit.
    $1,040.33
  • Police Impact Fee (City of Belleview, MF)
    City of Belleview
    City of Belleview police services impact fee (Code Ch. 50 Art. IV, Ord. 2022-05): $452 per residential unit, with each apartment or condominium unit counted as a unit, paid when the building permit is issued.
    $452.00
  • City Impact Fees (City of Belleview, MF)
    City of Belleview
    Belleview levies its own police impact fee (Code Ch. 50 Art. IV) and parks and recreation impact fee (Code Ch. 58 Art. III) on new multifamily units, listed as separate fees. Water and sewer system development charges are recorded separately, and the Marion County transportation, fire protection, EMS and school impact fees also apply inside the city.
    Requires confirmation
County$6,945.00
  • Educational System Impact Fee (MF Apt 901-1200 sf)
    Marion County School Board
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). MF apartments tiered by unit heated area: 1–700 sf $1,604; 701–900 sf $3,847; 901–1,200 sf $4,337 (default tier for a canonical ~1,000 sf unit); >1,200 sf $5,525; condominiums $1,990 (a separate land-use category, not a size tier). This record is the 901–1,200 sf tier at $4,337. Applies countywide in the unincorporated area and within municipal boundaries.
    $4,337.00
  • Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)
    Mid/High-Rise (4+ Floors)
    Marion County
    Marion County transportation impact fee (Ord. 25-18, Code Sec. 10-327(b)), charged countywide including inside every city and phased in each October 1. Multifamily is tiered by building height: Low-Rise (1 to 3 floors) $2,872 per unit and Mid/High-Rise (4 or more floors) $1,930 per unit (the 80% step, effective October 1, 2026). Next steps: 90% on October 1, 2027 ($3,231 / $2,171) and 100% on October 1, 2028 ($3,590 / $2,412). Paid before the certificate of occupancy.
    $1,930.00
  • Fire Protection Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County fire protection impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in: a flat $505 per multifamily unit at any building height. Charged in unincorporated Marion County and inside Belleview, Dunnellon, Reddick and McIntosh; not charged in the City of Ocala, which levies its own fire impact fee. Paid before the certificate of occupancy.
    $505.00
  • EMS Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County EMS impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in: a flat $173 per multifamily unit at any building height. Charged countywide, in unincorporated Marion County and inside every city including Ocala. Paid before the certificate of occupancy.
    $173.00
Total (Belleview): $14,132.93
Sources last checked Official fee schedules:City of Belleview Marion County School Board Marion County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Belleview: Commercial Impact Fees

Commercial development in Belleview pays $7.55 per square foot in impact fees, plus $2,946.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $380,596.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Belleview) — 150 gpd commercial minimum × $14.80/gpd ($2,220.00 one-time), Water System Development Charge (City of Belleview) — 150 gpd commercial minimum × $4.84/gpd ($726.00 one-time) and Transportation Impact Fee (Marion County, Commercial) ($5.15/sq ft).

View the Full Belleview Impact Fee Schedule
Water$726.00 one-time
Sewer$2,220.00 one-time
City$0.69/sq ft
  • Police Impact Fee (City of Belleview, Commercial)
    City of Belleview
    City of Belleview police services impact fee (City Code Ch. 50 Art. IV, Ord. 2022-05, effective 2022), charged per 1,000 sq ft of commercial floor area and paid when the building permit is issued. Alterations that add no floor area and do not change the use are exempt.
    $0.69/sq ft
County$6.86/sq ft
  • Transportation Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. Retail of 40,001 to 150,000 sq ft pays per 1,000 sq ft of gross leasable area: $4,505 (70%, October 1, 2025), $5,148 (80%, October 1, 2026), $5,792 (90%, October 1, 2027) and $6,435 (100%, October 1, 2028). Smaller and larger retail centers pay different rates.
    $5.15/sq ft
  • Fire Protection Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
    $1.31/sq ft
  • EMS Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.41/sq ft
Total (Belleview): $7.55/sq ft + $2,946.00 one-time (≈ $380,596.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Belleview Public Works City of Belleview Marion County Board of County Commissioners

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Belleview: Industrial Impact Fees

Industrial development in Belleview pays $2.03 per square foot in impact fees, plus $2,946.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $104,446.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Belleview) — 150 gpd commercial minimum × $14.80/gpd ($2,220.00 one-time), Water System Development Charge (City of Belleview) — 150 gpd commercial minimum × $4.84/gpd ($726.00 one-time) and Transportation Impact Fee (Marion County, Industrial) ($1.72/sq ft).

View the Full Belleview Impact Fee Schedule
Water$726.00 one-time
Sewer$2,220.00 one-time
City$0.03/sq ft
  • Police Impact Fee (City of Belleview, Industrial)
    City of Belleview
    City of Belleview police services impact fee (City Code Ch. 50 Art. IV, Ord. 2022-05, effective 2022), charged per 1,000 sq ft of industrial or warehouse floor area and paid when the building permit is issued. Alterations that add no floor area and do not change the use are exempt.
    $0.03/sq ft
County$2.00/sq ft
  • Transportation Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. General light industrial pays per 1,000 sq ft of floor area: $1,502 (70%, October 1, 2025), $1,716 (80%, October 1, 2026), $1,931 (90%, October 1, 2027) and $2,145 (100%, October 1, 2028).
    $1.72/sq ft
  • Fire Protection Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
    $0.21/sq ft
  • EMS Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.07/sq ft
Total (Belleview): $2.03/sq ft + $2,946.00 one-time (≈ $104,446.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Belleview Public Works City of Belleview Marion County Board of County Commissioners

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Belleview: Office Impact Fees

Office development in Belleview pays $4.66 per square foot in impact fees, plus $2,946.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to about $119,396.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Belleview) — 150 gpd commercial minimum × $14.80/gpd ($2,220.00 one-time), Water System Development Charge (City of Belleview) — 150 gpd commercial minimum × $4.84/gpd ($726.00 one-time) and Transportation Impact Fee (Marion County, Office) ($3.81/sq ft).

View the Full Belleview Impact Fee Schedule
Water$726.00 one-time
Sewer$2,220.00 one-time
City$0.25/sq ft
  • Police Impact Fee (City of Belleview, Office)
    City of Belleview
    City of Belleview police services impact fee (City Code Ch. 50 Art. IV, Ord. 2022-05, effective 2022), charged per 1,000 sq ft of office floor area and paid when the building permit is issued. Alterations that add no floor area and do not change the use are exempt.
    $0.25/sq ft
County$4.41/sq ft
  • Transportation Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. General office pays per 1,000 sq ft of floor area: $3,336 (70%, October 1, 2025), $3,813 (80%, October 1, 2026), $4,289 (90%, October 1, 2027) and $4,766 (100%, October 1, 2028).
    $3.81/sq ft
  • Fire Protection Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
    $0.45/sq ft
  • EMS Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.14/sq ft
Total (Belleview): $4.66/sq ft + $2,946.00 one-time (≈ $119,396.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Belleview Public Works City of Belleview Marion County Board of County Commissioners

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Belleview Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Belleview Impact Fee FAQs

What are the total impact fees for a single-family home in Belleview, Florida?

A new single-family home in Belleview pays $17,887.11 per unit in combined impact fees (rates sourced October 21, 2026).

How much are commercial impact fees in Belleview?

Commercial development in Belleview pays $7.55 per square foot in impact fees, plus $2,946.00 in one-time water and sewer connection fees, about $380,596.00 for a 50,000 sq ft building.

Does Belleview charge its own impact fees?

Yes. Belleview levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Belleview, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Marion County impact fees page.