Reddick, Florida Impact Fees

Reddick applies its own fee schedule: municipal fees plus the Marion County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $8,250.00 per unit (rates sourced July 14, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Reddick impact fees by project type

Reddick: Single-Family Impact Fees

A new single-family home in Reddick pays at least $8,250.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Marion County.

The largest line items are Educational Facilities Impact Fee (Marion County Schools) ($4,307.00), Transportation Impact Fee (Marion County - ≤1,500 sf) ($3,072.00) and Fire Protection Impact Fee (Marion County - ≤1,500 sf) ($663.00).

Sewer Connection Fee (Reddick) and Water Connection Fee (Reddick) are set by the utility and not published online. City Impact Fees (Town of Reddick) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Reddick)
    Town of Reddick
    $0 placeholder — UNCONFIRMED. The Town of Reddick does not appear to operate a public water utility; residential development is understood to rely on private wells. Town website and Marion County Utilities service area both checked — no public water service confirmed. NOTE (7/13/2026): 'no public utility' is an inference, not a proven finding — confirm with Reddick Town Hall, 4901 NW 152nd St., Reddick FL 32686, (352) 591-2160.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Reddick)
    Town of Reddick
    $0 placeholder — UNCONFIRMED. The Town of Reddick does not appear to operate a public sewer/wastewater utility; residential development is understood to rely on private septic systems. NOTE (7/13/2026): this is an inference, not a proven finding — confirm with Reddick Town Hall, (352) 591-2160.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Reddick)
    Town of Reddick
    $0 placeholder — UNCONFIRMED. No Town of Reddick municipal impact fee schedule located (pop. ~500; no codifier presence found). Fire/EMS/Transportation/Education inside Reddick are MARION COUNTY fees — Ord. 25-17 §10-340(a) and the Ord. 25-18 schedule expressly name Reddick. Confirm no separate town fee with Reddick Town Hall, (352) 591-2160. (Legacy '⚠️ VERIFY' name suffix migrated to this Unconfirmed checkbox 7/13/2026.)
    Requires confirmation
County$8,250.00
Total (Reddick): $8,250.00
Sources last checked July 14, 2026Official fee schedules:Town of Reddick Marion County School Board Marion County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reddick: Multifamily Impact Fees

A new multifamily unit in Reddick pays at least $6,703.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Marion County.

The largest line items are Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00), Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18) ($1,688.00) and Fire Protection Impact Fee (MF - Ord. 25-17) ($505.00).

Water Connection Fee (MF - Reddick) and Sewer Connection Fee (MF - Reddick) are set by the utility and not published online. City Impact Fees (Town of Reddick, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (MF - Reddick)
    Town of Reddick
    $0 placeholder — UNCONFIRMED. The Town of Reddick does not appear to operate a public water utility; development is understood to rely on private wells. NOTE (7/13/2026): this is an inference, not a proven finding — confirm with Reddick Town Hall, (352) 591-2160.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (MF - Reddick)
    Town of Reddick
    $0 placeholder — UNCONFIRMED. The Town of Reddick does not appear to operate a public sewer utility; development is understood to rely on private septic. NOTE (7/13/2026): this is an inference, not a proven finding — confirm with Reddick Town Hall, (352) 591-2160.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Reddick, MF)
    Town of Reddick
    $0 placeholder — UNCONFIRMED. No Town of Reddick municipal impact fee schedule located. Fire/EMS/Transportation/Education inside Reddick are MARION COUNTY fees (Ord. 25-17 §10-340(a) and the Ord. 25-18 schedule expressly name Reddick). Confirm with Reddick Town Hall, (352) 591-2160. (Legacy '⚠️ VERIFY' name suffix migrated to the Unconfirmed checkbox 7/13/2026.)
    Requires confirmation
County$6,703.00
  • Educational System Impact Fee (MF Apt 901-1200 sf)
    Marion County School Board
    Marion County Educational System Impact Fee, Ord. 2024-06 (eff. 7/1/2024), Code §10-431(b). MF Apartment 901-1,200 sq ft = $4,337/DU. DEFAULT MF tier (canonical 1,000 sq ft unit). Other tiers: 1-700sf $1,604; 701-900sf $3,847; >1,200sf $5,525; Condos $1,990. Source re-pointed 7/13/2026 from a news-release page to the adopted ordinance.
    $4,337.00
  • Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)
    Marion County
    Marion County Transportation Impact Fee, Ord. 25-18. ITE 221/222 MF Mid/High-Rise (4+ floors) = $1,688/DU at the 70% phase. DEFAULT MF tier. Steps: $1,930 (10/1/2026), $2,171 (10/1/2027), $2,412 (10/1/2028). Verified 7/13/2026.
    $1,688.00
  • Fire Protection Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County Fire Protection Impact Fee, Ord. 25-17, eff. 10/1/2025. Multi-Family = $505/DU, flat. §10-340(a) expressly names Reddick. Verified 7/13/2026.
    $505.00
  • EMS Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County EMS Impact Fee, Ord. 25-17, eff. 10/1/2025. Multi-Family = $173/DU, flat. §10-337(a): countywide incl. all municipal areas. Verified 7/13/2026.
    $173.00
Total (Reddick): $6,703.00
Sources last checked July 14, 2026Official fee schedules:Town of Reddick Marion County School Board Marion County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reddick: Commercial Impact Fees

Commercial development in Reddick pays $6.22 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $310,800.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Marion County, Commercial) ($4.50/sq ft), Fire Protection Impact Fee (Marion County, Commercial) ($1.31/sq ft) and EMS Impact Fee (Marion County, Commercial) ($0.41/sq ft).

Water Connection Fee (Town of Reddick) and Sewer Connection Fee (Town of Reddick) are set by the utility and not published online. City Impact Fees (Town of Reddick, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Reddick)
    Town of Reddick
    UNCONFIRMED $0 — Reddick DOES run its own water system and DOES have a 'new connection fee' in its water ordinance (which contemplates special pricing where pipe exceeds 2 inches, where more than 100 lineal feet of main is required, or where a meter larger than 3/4 inch is required), but NO DOLLAR AMOUNT IS PUBLISHED ANYWHERE. The Town is on no codifier; its website posts only a Comprehensive Land Use Plan, Zoning Ord. 83-1 and a littering ordinance, and its Ordinance Review and Resolutions pages are empty. Sources exhausted: town website (every page), web search, Municode + American Legal (Reddick not listed). CONTACT: Town of Reddick, (352) 591-2469 — ask the Town Clerk for the current water connection fee schedule and the commercial/large-meter rate.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Reddick)
    Town of Reddick
    UNCONFIRMED $0 — Reddick appears to operate NO central sanitary sewer system (its only utility ordinance references are to the water system; development is on septic), but the Town publishes no code, no ordinance index and no fee schedule, so the absence cannot be proved. CONTACT: Town of Reddick, (352) 591-2469 — confirm with the Town Clerk that no sewer system or sewer connection fee exists.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Reddick, Commercial)
    Town of Reddick
    UNCONFIRMED $0 — no evidence Reddick levies any impact fee, but the $0 cannot be proved. The Town is on NO codifier and publishes only three documents on its website (Comprehensive Land Use Plan, Zoning Ord. 83-1, and a solid-waste/littering ordinance); its Ordinance Review page says 'None at this time' and the Resolutions section of its Forms & Resolutions page is empty. No fee schedule of any kind is posted. Checked: town website (all pages), web search, Municode/American Legal (not listed). CONTACT: Town of Reddick, (352) 591-2469, townofreddick.com/contact — ask the Town Clerk whether any impact fee ordinance exists.
    Requires confirmation
County$6.22/sq ft
  • Transportation Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Ord. No. 25-18, eff. 10/1/2025 (70% phase). Schedule row: ITE 821 Retail 40,001-150,000 sfgla, $4,505 per 1,000 sfgla. Schedule note expressly applies the fee within the incorporated area of Reddick. NEXT STEP-UP 10/1/2026 ($5,148).
    $4.50/sq ft
  • Fire Protection Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 821 Retail 40,001-150,000 sfgla, Fire column $1,306 per 1,000 sfgla. Applies within Reddick.
    $1.31/sq ft
  • EMS Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 821 Retail 40,001-150,000 sfgla, EMS column $405 per 1,000 sfgla. Applies within Reddick.
    $0.41/sq ft
Total (Reddick): $6.22/sq ft (≈ $310,800.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Town of Reddick Marion County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reddick: Industrial Impact Fees

Industrial development in Reddick pays $1.78 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $89,100.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Marion County, Industrial) ($1.50/sq ft), Fire Protection Impact Fee (Marion County, Industrial) ($0.21/sq ft) and EMS Impact Fee (Marion County, Industrial) ($0.07/sq ft).

Water Connection Fee (Town of Reddick) and Sewer Connection Fee (Town of Reddick) are set by the utility and not published online. City Impact Fees (Town of Reddick, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Reddick)
    Town of Reddick
    UNCONFIRMED $0 — Reddick DOES run its own water system and DOES have a 'new connection fee' in its water ordinance (which contemplates special pricing where pipe exceeds 2 inches, where more than 100 lineal feet of main is required, or where a meter larger than 3/4 inch is required), but NO DOLLAR AMOUNT IS PUBLISHED ANYWHERE. The Town is on no codifier; its website posts only a Comprehensive Land Use Plan, Zoning Ord. 83-1 and a littering ordinance, and its Ordinance Review and Resolutions pages are empty. Sources exhausted: town website (every page), web search, Municode + American Legal (Reddick not listed). CONTACT: Town of Reddick, (352) 591-2469 — ask the Town Clerk for the current water connection fee schedule and the commercial/large-meter rate.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Reddick)
    Town of Reddick
    UNCONFIRMED $0 — Reddick appears to operate NO central sanitary sewer system (its only utility ordinance references are to the water system; development is on septic), but the Town publishes no code, no ordinance index and no fee schedule, so the absence cannot be proved. CONTACT: Town of Reddick, (352) 591-2469 — confirm with the Town Clerk that no sewer system or sewer connection fee exists.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Reddick, Industrial)
    Town of Reddick
    UNCONFIRMED $0 — Reddick is on no codifier and publishes no fee schedule or ordinance index; the $0 cannot be proved. CONTACT: Town Clerk, (352) 591-2469.
    Requires confirmation
County$1.78/sq ft
  • Transportation Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Ord. No. 25-18, eff. 10/1/2025 (70% phase). Schedule row: ITE 110 General Light Industrial, $1,502 per 1,000 sf. Applies within Reddick. NEXT STEP-UP 10/1/2026 ($1,716).
    $1.50/sq ft
  • Fire Protection Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 110 General Light Industrial, Fire column $214 per 1,000 sf. Applies within Reddick.
    $0.21/sq ft
  • EMS Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Ord. No. 25-17, eff. 10/1/2025. Schedule row: ITE 110 General Light Industrial, EMS column $66 per 1,000 sf. Applies within Reddick.
    $0.07/sq ft
Total (Reddick): $1.78/sq ft (≈ $89,100.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Town of Reddick Marion County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Reddick: Office Impact Fees

Office development in Reddick pays $3.93 per square foot in impact fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to at least $98,225.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Marion County, Office) ($3.34/sq ft), Fire Protection Impact Fee (Marion County, Office) ($0.45/sq ft) and EMS Impact Fee (Marion County, Office) ($0.14/sq ft).

Water Connection Fee (Town of Reddick) and Sewer Connection Fee (Town of Reddick) are set by the utility and not published online. City Impact Fees (Town of Reddick, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Reddick)
    Town of Reddick
    UNCONFIRMED $0 — Reddick DOES run its own water system and DOES have a 'new connection fee' in its water ordinance (which contemplates special pricing where pipe exceeds 2 inches, where more than 100 lineal feet of main is required, or where a meter larger than 3/4 inch is required), but NO DOLLAR AMOUNT IS PUBLISHED ANYWHERE. The Town is on no codifier; its website posts only a Comprehensive Land Use Plan, Zoning Ord. 83-1 and a littering ordinance, and its Ordinance Review and Resolutions pages are empty. Sources exhausted: town website (every page), web search, Municode + American Legal (Reddick not listed). CONTACT: Town of Reddick, (352) 591-2469 — ask the Town Clerk for the current water connection fee schedule and the commercial/large-meter rate.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Reddick)
    Town of Reddick
    UNCONFIRMED $0 — Reddick appears to operate NO central sanitary sewer system (its only utility ordinance references are to the water system; development is on septic), but the Town publishes no code, no ordinance index and no fee schedule, so the absence cannot be proved. CONTACT: Town of Reddick, (352) 591-2469 — confirm with the Town Clerk that no sewer system or sewer connection fee exists.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Reddick, Office)
    Town of Reddick
    UNCONFIRMED $0 — Reddick is on no codifier and publishes no fee schedule or ordinance index; the $0 cannot be proved. CONTACT: Town Clerk, (352) 591-2469.
    Requires confirmation
County$3.93/sq ft
Total (Reddick): $3.93/sq ft (≈ $98,225.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Town of Reddick Marion County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Reddick

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Reddick, Florida?

A new single-family home in Reddick pays at least $8,250.00 per unit in combined impact fees (rates sourced July 14, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Reddick?

Commercial development in Reddick pays $6.22 per square foot in impact fees, at least $310,800.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Reddick charge its own impact fees?

Yes. Reddick levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Reddick, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Marion County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.