Ocala, Florida Impact Fees

Ocala applies its own fee schedule: municipal fees plus the Marion County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,270.00 per unit (rates sourced ). The full breakdown is below.

Ocala Impact Fees by Project Type

Ocala: Single-Family Impact Fees

A new single-family home in Ocala pays $17,270.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Marion County-levied fees account for $8,799.00 and municipal or utility fees for $8,471.00.

The largest line items are Water Meter Setting Charge (City of Ocala) — 5/8 in. meter ($4,440.00), Educational Facilities Impact Fee (Marion County Schools) ($4,307.00) and Transportation Impact Fee (Marion County - 1,501-2,499 sf) ($4,254.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ocala Impact Fee Schedule
Water$5,212.00
  • Water Meter Setting Charge (City of Ocala) — 5/8 in. meter
    City-installed service, 5/8 in. meter
    City of Ocala
    City of Ocala charge for setting a new water meter on the city water system (Code Sec. 70-411(a)), in addition to the water impact fee. A 5/8 in. meter costs $4,440 where the city installs the service, or $315 where the developer installs both the water main and the meter box. Larger meters cost more (1 in.: $4,510 city-installed, $400 developer-installed).
    $4,440.00
  • Water Impact Fee (City of Ocala - 1,500-2,499 sf)
    1,500–2,499 sf (0.75 ERU)
    City of Ocala
    City of Ocala water impact fee (Ord. 2025-27, Code Sec. 70-502), charged per single-family home by an ERU factor set by heated area and phased in each October 1. Year 2 rates, effective October 1, 2026 ($1,029 per ERU): 0 to 1,499 sq ft (0.60 ERU) $617; 1,500 to 2,499 sq ft (0.75 ERU) $772; 2,500 to 3,499 sq ft (1.00 ERU) $1,029; 3,500 sq ft or more (1.25 ERU) $1,286. Next steps: $1,132 per ERU on October 1, 2027 and $1,235 per ERU on October 1, 2028. Customers outside the city limits pay 125% of the in-city rate.
    $772.00
Sewer$2,951.00
  • Sewer Impact Fee (City of Ocala - 1,500-2,499 sf)
    1,500–2,499 sf (0.75 ERU)
    City of Ocala
    City of Ocala sewer impact fee (Ord. 2025-27, Code Sec. 70-502), charged per single-family home by an ERU factor set by heated area and phased in each October 1. Year 2 rates, effective October 1, 2026 ($3,935 per ERU): 0 to 1,499 sq ft (0.60 ERU) $2,361; 1,500 to 2,499 sq ft (0.75 ERU) $2,951; 2,500 to 3,499 sq ft (1.00 ERU) $3,935; 3,500 sq ft or more (1.25 ERU) $4,919. Next steps: $4,329 per ERU on October 1, 2027 and $4,722 per ERU on October 1, 2028. Customers outside the city limits pay 125% of the in-city rate.
    $2,951.00
City$308.00
  • City Fire Impact Fee (City of Ocala - 1,500-2,499 sf)
    City of Ocala
    City of Ocala Fire Impact Fee, Ord. 2019-47 (schedule effective 12/17/2019). SFR tiered by heated area: <1,500 sf $278, 1,500–2,499 sf $308, 2,500+ sf $345; this record is the 1,500–2,499 sf tier at $308. This is a City of Ocala fee assessed in place of the county Fire Protection fee, which does not apply within Ocala.
    $308.00
County$8,799.00
  • Educational Facilities Impact Fee (Marion County Schools)
    Marion County School Board
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). Flat $4,307 per single-family detached dwelling unit. Applies countywide; collected within the City of Ocala, which publishes this schedule as a fee it assesses.
    $4,307.00
  • Transportation Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County transportation impact fee (Ord. 25-18, Code Sec. 10-327(b)), charged countywide including inside every city and phased in each October 1. Single-family detached homes are tiered by heated area: 1,500 sq ft or less $3,510; 1,501 to 2,499 sq ft $4,254; 2,500 sq ft or more $4,684 (the 80% step, effective October 1, 2026). Next steps: 90% on October 1, 2027 ($3,949 / $4,786 / $5,270) and 100% on October 1, 2028 ($4,388 / $5,318 / $5,855). Paid before the certificate of occupancy.
    $4,254.00
  • EMS Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County EMS impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in. Charged countywide, in unincorporated Marion County and inside every city including Ocala. Single-family homes are tiered by heated area: 1,500 sq ft or less $208; 1,501 to 2,499 sq ft $238; 2,500 sq ft or more $261. Paid before the certificate of occupancy.
    $238.00
Total (Ocala): $17,270.00
Sources last checked Official fee schedules:City of Ocala Marion County School Board Marion County

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Ocala: Multifamily Impact Fees

A new multifamily unit in Ocala pays $14,570.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Marion County-levied fees account for $6,440.00 and municipal or utility fees for $8,130.00.

The largest line items are Water Meter Setting Charge (City of Ocala, MF) — 5/8 in. meter ($4,440.00), Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00) and Sewer Impact Fee (MF 2 Bedroom - 0.70 ERU) ($2,755.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ocala Impact Fee Schedule
Water$5,160.00
  • Water Meter Setting Charge (City of Ocala, MF) — 5/8 in. meter
    City-installed service, 5/8 in. meter
    City of Ocala
    City of Ocala charge for setting a new water meter on the city water system (Code Sec. 70-411(a)), in addition to the water impact fee. Ocala does not allow master meters on new multiunit residential buildings, so each unit carries its own meter: a 5/8 in. meter costs $4,440 where the city installs the service, or $315 where the developer installs both the water main and the meter box.
    $4,440.00
  • Water Impact Fee (MF 2 Bedroom - 0.70 ERU)
    2 Bedrooms
    City of Ocala
    City of Ocala water impact fee (Ord. 2025-27, Code Sec. 70-502), charged per apartment, townhouse or condominium unit by an ERU factor set by bedrooms and phased in each October 1. Year 2 rates, effective October 1, 2026 ($1,029 per ERU): 1 bedroom (0.50 ERU) $515; 2 bedrooms (0.70 ERU) $720; 3 bedrooms (0.85 ERU) $875. Next steps: $1,132 per ERU on October 1, 2027 and $1,235 per ERU on October 1, 2028. Customers outside the city limits pay 125% of the in-city rate.
    $720.00
Sewer$2,755.00
  • Sewer Impact Fee (MF 2 Bedroom - 0.70 ERU)
    2 Bedrooms
    City of Ocala
    City of Ocala sewer impact fee (Ord. 2025-27, Code Sec. 70-502), charged per apartment, townhouse or condominium unit by an ERU factor set by bedrooms and phased in each October 1. Year 2 rates, effective October 1, 2026 ($3,935 per ERU): 1 bedroom (0.50 ERU) $1,968; 2 bedrooms (0.70 ERU) $2,755; 3 bedrooms (0.85 ERU) $3,345. Next steps: $4,329 per ERU on October 1, 2027 and $4,722 per ERU on October 1, 2028. Customers outside the city limits pay 125% of the in-city rate.
    $2,755.00
City$215.00
  • City Fire Impact Fee (City of Ocala, MF)
    City of Ocala
    City of Ocala Fire Impact Fee, Ord. 2019-47 (schedule effective 12/17/2019). Multi-family (apartment/condominium/townhouse, ITE 220/221/222) flat $215 per dwelling unit. This is a City of Ocala fee assessed in place of the county Fire Protection fee, which does not apply within Ocala.
    $215.00
County$6,440.00
  • Educational System Impact Fee (MF Apt 901-1200 sf)
    Marion County School District
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). MF apartments tiered by unit heated area: 1–700 sf $1,604; 701–900 sf $3,847; 901–1,200 sf $4,337 (default tier for a canonical ~1,000 sf unit); >1,200 sf $5,525; condominiums $1,990. This record is the 901–1,200 sf tier at $4,337. Applies countywide in all unincorporated and incorporated areas.
    $4,337.00
  • Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)
    Mid/High-Rise (4+ Floors)
    Marion County
    Marion County transportation impact fee (Ord. 25-18, Code Sec. 10-327(b)), charged countywide including inside every city and phased in each October 1. Multifamily is tiered by building height: Low-Rise (1 to 3 floors) $2,872 per unit and Mid/High-Rise (4 or more floors) $1,930 per unit (the 80% step, effective October 1, 2026). Next steps: 90% on October 1, 2027 ($3,231 / $2,171) and 100% on October 1, 2028 ($3,590 / $2,412). Paid before the certificate of occupancy.
    $1,930.00
  • EMS Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County EMS impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in: a flat $173 per multifamily unit at any building height. Charged countywide, in unincorporated Marion County and inside every city including Ocala. Paid before the certificate of occupancy.
    $173.00
Total (Ocala): $14,570.00
Sources last checked Official fee schedules:City of Ocala Marion County School District Marion County

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ocala: Commercial Impact Fees

Commercial development in Ocala pays $5.82 per square foot in impact fees, plus $16,921.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $308,071.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Ocala) — 1" meter ($9,838.00 one-time), Water Meter Setting Charge (City of Ocala) — 1" meter, city-installed ($4,510.00 one-time) and Water Impact Fee (City of Ocala) — 1" meter ($2,573.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ocala Impact Fee Schedule
Water$7,083.00 one-time
  • Water Meter Setting Charge (City of Ocala) — 1" meter, city-installed
    1", city-installed
    City of Ocala Water & Sewer
    City of Ocala charge for setting a new water meter on the city water system (City Code Sec. 70-411(a)), in addition to the water impact fee. The amount depends on meter size and on who installs the service: $4,440 to $8,165 where the city installs it, or $315 to $950 where the developer installs both the water main and the meter box. Meters of 3 inches and larger are charged actual cost plus overhead.
    $4,510.00 one-time
  • Water Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    City of Ocala water impact fee for a nonresidential 1 in. meter (2.5 ERU), phased in each October 1 under City Code Sec. 70-502: $2,315 (October 1, 2025), $2,573 (October 1, 2026), $2,830 (October 1, 2027) and $3,088 (October 1, 2028). Meters larger than 2 inches are calculated from building use, with a 1.0 ERU minimum. Customers outside the city limits pay 125% of these rates.
    $2,573.00 one-time
Sewer$9,838.00 one-time
  • Sewer Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    City of Ocala sewer impact fee for a nonresidential 1 in. meter (2.5 ERU), phased in each October 1 under City Code Sec. 70-502: $8,854 (October 1, 2025), $9,838 (October 1, 2026), $10,821 (October 1, 2027) and $11,805 (October 1, 2028). Meters larger than 2 inches are calculated from building use, with a 1.0 ERU minimum; high-strength wastewater pays more. Customers outside the city limits pay 125% of these rates.
    $9,838.00 one-time
City$0.27/sq ft
  • Fire Impact Fee (City of Ocala, Commercial)
    City of Ocala (Ocala Fire Rescue)
    Effective 12/17/2019. Charged only within the City of Ocala, which operates its own fire department; the Marion County fire protection impact fee does not apply here.
    $0.27/sq ft
County$5.55/sq ft
  • Transportation Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. Retail of 40,001 to 150,000 sq ft pays per 1,000 sq ft of gross leasable area: $4,505 (70%, October 1, 2025), $5,148 (80%, October 1, 2026), $5,792 (90%, October 1, 2027) and $6,435 (100%, October 1, 2028). Smaller and larger retail centers pay different rates.
    $5.15/sq ft
  • EMS Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.41/sq ft
  • Fire Protection Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    The Marion County fire protection impact fee is not charged within the City of Ocala, which operates its own fire department and levies its own fire impact fee (see the City of Ocala fire impact fee record).
    $0.00
Total (Ocala): $5.82/sq ft + $16,921.00 one-time (≈ $308,071.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Ocala: Industrial Impact Fees

Industrial development in Ocala pays $1.87 per square foot in impact fees, plus $16,921.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $110,321.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Ocala) — 1" meter ($9,838.00 one-time), Water Meter Setting Charge (City of Ocala) — 1" meter, city-installed ($4,510.00 one-time) and Water Impact Fee (City of Ocala) — 1" meter ($2,573.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ocala Impact Fee Schedule
Water$7,083.00 one-time
  • Water Meter Setting Charge (City of Ocala) — 1" meter, city-installed
    1", city-installed
    City of Ocala Water & Sewer
    City of Ocala charge for setting a new water meter on the city water system (City Code Sec. 70-411(a)), in addition to the water impact fee. The amount depends on meter size and on who installs the service: $4,440 to $8,165 where the city installs it, or $315 to $950 where the developer installs both the water main and the meter box. Meters of 3 inches and larger are charged actual cost plus overhead.
    $4,510.00 one-time
  • Water Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    City of Ocala water impact fee for a nonresidential 1 in. meter (2.5 ERU), phased in each October 1 under City Code Sec. 70-502: $2,315 (October 1, 2025), $2,573 (October 1, 2026), $2,830 (October 1, 2027) and $3,088 (October 1, 2028). Meters larger than 2 inches are calculated from building use, with a 1.0 ERU minimum. Customers outside the city limits pay 125% of these rates.
    $2,573.00 one-time
Sewer$9,838.00 one-time
  • Sewer Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    City of Ocala sewer impact fee for a nonresidential 1 in. meter (2.5 ERU), phased in each October 1 under City Code Sec. 70-502: $8,854 (October 1, 2025), $9,838 (October 1, 2026), $10,821 (October 1, 2027) and $11,805 (October 1, 2028). Meters larger than 2 inches are calculated from building use, with a 1.0 ERU minimum; high-strength wastewater pays more. Customers outside the city limits pay 125% of these rates.
    $9,838.00 one-time
City$0.09/sq ft
  • Fire Impact Fee (City of Ocala, Industrial)
    City of Ocala (Ocala Fire Rescue)
    Effective 12/17/2019. Charged only within the City of Ocala, which operates its own fire department; the Marion County fire protection impact fee does not apply here.
    $0.09/sq ft
County$1.78/sq ft
  • Transportation Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. General light industrial pays per 1,000 sq ft of floor area: $1,502 (70%, October 1, 2025), $1,716 (80%, October 1, 2026), $1,931 (90%, October 1, 2027) and $2,145 (100%, October 1, 2028).
    $1.72/sq ft
  • EMS Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.07/sq ft
  • Fire Protection Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    The Marion County fire protection impact fee is not charged within the City of Ocala, which operates its own fire department and levies its own fire impact fee (see the City of Ocala fire impact fee record).
    $0.00
Total (Ocala): $1.87/sq ft + $16,921.00 one-time (≈ $110,321.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Ocala: Office Impact Fees

Office development in Ocala pays $4.11 per square foot in impact fees, plus $16,921.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to about $119,646.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Ocala) — 1" meter ($9,838.00 one-time), Water Meter Setting Charge (City of Ocala) — 1" meter, city-installed ($4,510.00 one-time) and Water Impact Fee (City of Ocala) — 1" meter ($2,573.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ocala Impact Fee Schedule
Water$7,083.00 one-time
  • Water Meter Setting Charge (City of Ocala) — 1" meter, city-installed
    1", city-installed
    City of Ocala Water & Sewer
    City of Ocala charge for setting a new water meter on the city water system (City Code Sec. 70-411(a)), in addition to the water impact fee. The amount depends on meter size and on who installs the service: $4,440 to $8,165 where the city installs it, or $315 to $950 where the developer installs both the water main and the meter box. Meters of 3 inches and larger are charged actual cost plus overhead.
    $4,510.00 one-time
  • Water Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    City of Ocala water impact fee for a nonresidential 1 in. meter (2.5 ERU), phased in each October 1 under City Code Sec. 70-502: $2,315 (October 1, 2025), $2,573 (October 1, 2026), $2,830 (October 1, 2027) and $3,088 (October 1, 2028). Meters larger than 2 inches are calculated from building use, with a 1.0 ERU minimum. Customers outside the city limits pay 125% of these rates.
    $2,573.00 one-time
Sewer$9,838.00 one-time
  • Sewer Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    City of Ocala sewer impact fee for a nonresidential 1 in. meter (2.5 ERU), phased in each October 1 under City Code Sec. 70-502: $8,854 (October 1, 2025), $9,838 (October 1, 2026), $10,821 (October 1, 2027) and $11,805 (October 1, 2028). Meters larger than 2 inches are calculated from building use, with a 1.0 ERU minimum; high-strength wastewater pays more. Customers outside the city limits pay 125% of these rates.
    $9,838.00 one-time
City$0.16/sq ft
  • Fire Impact Fee (City of Ocala, Office)
    City of Ocala (Ocala Fire Rescue)
    Effective 12/17/2019. Charged only within the City of Ocala, which operates its own fire department; the Marion County fire protection impact fee does not apply here.
    $0.16/sq ft
County$3.95/sq ft
  • Transportation Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. General office pays per 1,000 sq ft of floor area: $3,336 (70%, October 1, 2025), $3,813 (80%, October 1, 2026), $4,289 (90%, October 1, 2027) and $4,766 (100%, October 1, 2028).
    $3.81/sq ft
  • EMS Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.14/sq ft
  • Fire Protection Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    The Marion County fire protection impact fee is not charged within the City of Ocala, which operates its own fire department and levies its own fire impact fee (see the City of Ocala fire impact fee record).
    $0.00
Total (Ocala): $4.11/sq ft + $16,921.00 one-time (≈ $119,646.00 at 25,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Ocala Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Ocala Impact Fee FAQs

What are the total impact fees for a single-family home in Ocala, Florida?

A new single-family home in Ocala pays $17,270.00 per unit in combined impact fees (rates sourced October 21, 2026).

How much are commercial impact fees in Ocala?

Commercial development in Ocala pays $5.82 per square foot in impact fees, plus $16,921.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $308,071.00 for a 50,000 sq ft building.

Does Ocala charge its own impact fees?

Yes. Ocala levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ocala, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Marion County impact fees page.