IMPACTFEES.ORG

Ocala, Florida Impact Fees

Ocala applies its own fee schedule: municipal fees plus the Marion County-levied fees that apply inside city limits. Combined, a new single-family home pays $11,927.00 per unit (rates sourced ). The full breakdown is below.

Ocala impact fees by project type

Ocala: Single-Family Impact Fees

A new single-family home in Ocala pays $11,927.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Marion County-levied fees account for $8,268.00 and municipal or utility fees for $3,659.00.

The largest line items are Educational Facilities Impact Fee (Marion County Schools) ($4,307.00), Transportation Impact Fee (Marion County - 1,501-2,499 sf) ($3,723.00) and Sewer Impact Fee (City of Ocala - 1,500-2,499 sf) ($2,656.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Ocala impact fee schedule
Water$695.00
  • Water Impact Fee (City of Ocala - 1,500-2,499 sf)
    1,500–2,499 sf (0.75 ERU)
    City of Ocala
    City of Ocala Water Impact Fee, Ord. 2025-27, effective 10/1/2025, Code Ch. 70 Art. V Div. 3. Base $926.00 per 1.0 ERU; SFR is ERU-tiered by heated area: 0–1,499 sf 0.60 ERU $556, 1,500–2,499 sf 0.75 ERU $695, 2,500–3,499 sf 1.00 ERU $926, 3,500+ sf 1.25 ERU $1,158. This record is the 1,500–2,499 sf (0.75 ERU) tier at $695. Phased ramp: base rises to $1,029/ERU on 10/1/2026, $1,132/ERU on 10/1/2027, $1,235/ERU on 10/1/2028. Applies to development served by City of Ocala water.
    $695.00
Sewer$2,656.00
  • Sewer Impact Fee (City of Ocala - 1,500-2,499 sf)
    1,500–2,499 sf (0.75 ERU)
    City of Ocala
    City of Ocala Sewer Impact Fee, Ord. 2025-27, effective 10/1/2025, Code Ch. 70 Art. V Div. 3. Base $3,542.00 per 1.0 ERU; SFR is ERU-tiered by heated area: 0–1,499 sf 0.60 ERU $2,125, 1,500–2,499 sf 0.75 ERU $2,656, 2,500–3,499 sf 1.00 ERU $3,542, 3,500+ sf 1.25 ERU $4,427. This record is the 1,500–2,499 sf (0.75 ERU) tier at $2,656. Phased ramp: base rises to $3,935/ERU on 10/1/2026, $4,329/ERU on 10/1/2027, $4,722/ERU on 10/1/2028. Applies to development served by City of Ocala sewer.
    $2,656.00
City$308.00
  • City Fire Impact Fee (City of Ocala - 1,500-2,499 sf)
    City of Ocala
    City of Ocala Fire Impact Fee, Ord. 2019-47 (schedule effective 12/17/2019). SFR tiered by heated area: <1,500 sf $278, 1,500–2,499 sf $308, 2,500+ sf $345; this record is the 1,500–2,499 sf tier at $308. This is a City of Ocala fee assessed in place of the county Fire Protection fee, which does not apply within Ocala.
    $308.00
County$8,268.00
  • Educational Facilities Impact Fee (Marion County Schools)
    Marion County School Board
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). Flat $4,307 per single-family detached dwelling unit. Applies countywide; collected within the City of Ocala, which publishes this schedule as a fee it assesses.
    $4,307.00
  • Transportation Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County Transportation Impact Fee, Ord. 25-18 (adopted 5/23/2025), effective 10/1/2025. Assessed at 70% now, stepping to 80% on 10/1/2026, 90% on 10/1/2027, 100% on 10/1/2028. SFR tiered by heated area; the 1,501–2,499 sf tier is $3,723 at 70% ($4,254 at the 80% step). Full 70% schedule: ≤1,500 sf $3,072, 1,501–2,499 sf $3,723, 2,500+ sf $4,099. Collected within the City of Ocala, which is named in the adopted schedule, as well as unincorporated Marion County and the other municipalities.
    $3,723.00
  • EMS Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County EMS Impact Fee, Ord. 25-17, effective 10/1/2025 at 100% of the calculated rate. SFR tiered by heated area: ≤1,500 sf $208, 1,501–2,499 sf $238, 2,500+ sf $261; this record is the 1,501–2,499 sf tier at $238. Applies countywide — unincorporated Marion County and all municipalities, including the City of Ocala.
    $238.00
Total (Ocala): $11,927.00
Sources last checked Official fee schedules:City of Ocala Marion County School Board Marion County

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Ocala: Multifamily Impact Fees

A new multifamily unit in Ocala pays $9,540.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Marion County-levied fees account for $6,198.00 and municipal or utility fees for $3,342.00.

The largest line items are Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00), Sewer Impact Fee (MF 2 Bedroom - 0.70 ERU) ($2,479.00) and Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18) ($1,688.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Ocala impact fee schedule
Water$648.00
  • Water Impact Fee (MF 2 Bedroom - 0.70 ERU)
    2 Bedrooms
    City of Ocala
    City of Ocala Water Impact Fee, Ord. 2025-27, effective 10/1/2025, Code Ch. 70 Art. V Div. 3. MF charged per dwelling unit by bedroom-count ERU factor on the $926.00/ERU base: 1BR 0.50 ERU $463; 2BR 0.70 ERU $648 (default tier for a canonical 2BR unit); 3BR 0.85 ERU $787. This record is the 2BR tier at $648. Phased ramp: base rises to $1,029/ERU on 10/1/2026 ($720 for 2BR), $1,132/ERU on 10/1/2027, $1,235/ERU on 10/1/2028. Applies to development served by City of Ocala water.
    $648.00
Sewer$2,479.00
  • Sewer Impact Fee (MF 2 Bedroom - 0.70 ERU)
    2 Bedrooms
    City of Ocala
    City of Ocala Sewer Impact Fee, Ord. 2025-27, effective 10/1/2025, Code Ch. 70 Art. V Div. 3. MF charged per dwelling unit by bedroom-count ERU factor on the $3,542.00/ERU base: 1BR 0.50 ERU $1,771; 2BR 0.70 ERU $2,479 (default tier for a canonical 2BR unit); 3BR 0.85 ERU $3,010. This record is the 2BR tier at $2,479. Phased ramp: base rises to $3,935/ERU on 10/1/2026 ($2,755 for 2BR), $4,329/ERU on 10/1/2027, $4,722/ERU on 10/1/2028. Applies to development served by City of Ocala sewer.
    $2,479.00
City$215.00
  • City Fire Impact Fee (City of Ocala, MF)
    City of Ocala
    City of Ocala Fire Impact Fee, Ord. 2019-47 (schedule effective 12/17/2019). Multi-family (apartment/condominium/townhouse, ITE 220/221/222) flat $215 per dwelling unit. This is a City of Ocala fee assessed in place of the county Fire Protection fee, which does not apply within Ocala.
    $215.00
County$6,198.00
  • Educational System Impact Fee (MF Apt 901-1200 sf)
    Marion County School District
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). MF apartments tiered by unit heated area: 1–700 sf $1,604; 701–900 sf $3,847; 901–1,200 sf $4,337 (default tier for a canonical ~1,000 sf unit); >1,200 sf $5,525; condominiums $1,990. This record is the 901–1,200 sf tier at $4,337. Applies countywide in all unincorporated and incorporated areas.
    $4,337.00
  • Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)
    Mid/High-Rise (4+ Floors)
    Marion County
    Marion County Transportation Impact Fee, Ord. 25-18 (adopted 5/23/2025), effective 10/1/2025, collected within the City of Ocala. Assessed at 70% now, stepping to 80% on 10/1/2026, 90% on 10/1/2027, 100% on 10/1/2028. MF tiered by building rise. Mid/High-Rise (4+ floors, ITE 221/222) is the default MF tier: $1,688/DU at 70%, then $1,930 (10/1/2026), $2,171 (10/1/2027), $2,412 (10/1/2028). Low-Rise (1–3 floors) is $2,513/DU at 70% (higher, because low-rise generates more trips per unit).
    $1,688.00
  • EMS Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County EMS Impact Fee, Ord. 25-17, effective 10/1/2025 at 100% of the calculated rate. Multi-family flat $173 per dwelling unit (ITE 220/221/222). Applies countywide — unincorporated Marion County and all municipalities, including the City of Ocala. (The county Fire Protection fee does not apply in Ocala, but EMS does.)
    $173.00
Total (Ocala): $9,540.00
Sources last checked Official fee schedules:City of Ocala Marion County School District Marion County

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Ocala: Commercial Impact Fees

Commercial development in Ocala pays $5.18 per square foot in impact fees, plus $11,169.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $270,169.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Ocala) — 1" meter ($8,854.00 one-time), Water Impact Fee (City of Ocala) — 1" meter ($2,315.00 one-time) and Transportation Impact Fee (Marion County, Commercial) ($4.50/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Ocala impact fee schedule
Water$2,315.00 one-time
  • Water Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    Effective 10/1/2025, the first year of a four-year phase-in with increases on 10/1/2026, 10/1/2027 and 10/1/2028. Charged by meter size; meters larger than 2 inches are calculated on a fixture-unit basis. Customers outside the city limits pay 125% of these rates.
    $2,315.00 one-time
Sewer$8,854.00 one-time
  • Sewer Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    Effective 10/1/2025, the first year of a four-year phase-in with increases on 10/1/2026, 10/1/2027 and 10/1/2028. Charged by meter size; meters larger than 2 inches are calculated on a fixture-unit basis. Customers outside the city limits pay 125% of these rates.
    $8,854.00 one-time
City$0.27/sq ft
  • Fire Impact Fee (City of Ocala, Commercial)
    City of Ocala (Ocala Fire Rescue)
    Effective 12/17/2019. Charged only within the City of Ocala, which operates its own fire department; the Marion County fire protection impact fee does not apply here.
    $0.27/sq ft
County$4.91/sq ft
  • Transportation Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025 at the 70% phase-in rate ($4,505 per 1,000 sq ft). Scheduled increases: $5,148 (10/1/2026), $5,792 (10/1/2027), $6,435 (10/1/2028, full rate). Marion County transportation impact fee; applies countywide, including within all five municipalities.
    $4.50/sq ft
  • EMS Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.41/sq ft
  • Fire Protection Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    The Marion County fire protection impact fee is not charged within the City of Ocala, which operates its own fire department and levies its own fire impact fee (see the City of Ocala fire impact fee record).
    $0.00
Total (Ocala): $5.18/sq ft + $11,169.00 one-time (≈ $270,169.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ocala: Industrial Impact Fees

Industrial development in Ocala pays $1.65 per square foot in impact fees, plus $11,169.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $93,869.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Ocala) — 1" meter ($8,854.00 one-time), Water Impact Fee (City of Ocala) — 1" meter ($2,315.00 one-time) and Transportation Impact Fee (Marion County, Industrial) ($1.50/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Ocala impact fee schedule
Water$2,315.00 one-time
  • Water Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    Effective 10/1/2025, the first year of a four-year phase-in with increases on 10/1/2026, 10/1/2027 and 10/1/2028. Charged by meter size; meters larger than 2 inches are calculated on a fixture-unit basis. Customers outside the city limits pay 125% of these rates.
    $2,315.00 one-time
Sewer$8,854.00 one-time
  • Sewer Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    Effective 10/1/2025, the first year of a four-year phase-in with increases on 10/1/2026, 10/1/2027 and 10/1/2028. Charged by meter size; meters larger than 2 inches are calculated on a fixture-unit basis. Customers outside the city limits pay 125% of these rates.
    $8,854.00 one-time
City$0.09/sq ft
  • Fire Impact Fee (City of Ocala, Industrial)
    City of Ocala (Ocala Fire Rescue)
    Effective 12/17/2019. Charged only within the City of Ocala, which operates its own fire department; the Marion County fire protection impact fee does not apply here.
    $0.09/sq ft
County$1.57/sq ft
  • Transportation Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025 at the 70% phase-in rate ($1,502 per 1,000 sq ft). Scheduled increases: $1,716 (10/1/2026), $1,931 (10/1/2027), $2,145 (10/1/2028, full rate). Marion County transportation impact fee; applies countywide, including within all five municipalities.
    $1.50/sq ft
  • EMS Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.07/sq ft
  • Fire Protection Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    The Marion County fire protection impact fee is not charged within the City of Ocala, which operates its own fire department and levies its own fire impact fee (see the City of Ocala fire impact fee record).
    $0.00
Total (Ocala): $1.65/sq ft + $11,169.00 one-time (≈ $93,869.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ocala: Office Impact Fees

Office development in Ocala pays $3.63 per square foot in impact fees, plus $11,169.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $101,969.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Ocala) — 1" meter ($8,854.00 one-time), Water Impact Fee (City of Ocala) — 1" meter ($2,315.00 one-time) and Transportation Impact Fee (Marion County, Office) ($3.34/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Ocala impact fee schedule
Water$2,315.00 one-time
  • Water Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    Effective 10/1/2025, the first year of a four-year phase-in with increases on 10/1/2026, 10/1/2027 and 10/1/2028. Charged by meter size; meters larger than 2 inches are calculated on a fixture-unit basis. Customers outside the city limits pay 125% of these rates.
    $2,315.00 one-time
Sewer$8,854.00 one-time
  • Sewer Impact Fee (City of Ocala) — 1" meter
    City of Ocala Water & Sewer
    Effective 10/1/2025, the first year of a four-year phase-in with increases on 10/1/2026, 10/1/2027 and 10/1/2028. Charged by meter size; meters larger than 2 inches are calculated on a fixture-unit basis. Customers outside the city limits pay 125% of these rates.
    $8,854.00 one-time
City$0.16/sq ft
  • Fire Impact Fee (City of Ocala, Office)
    City of Ocala (Ocala Fire Rescue)
    Effective 12/17/2019. Charged only within the City of Ocala, which operates its own fire department; the Marion County fire protection impact fee does not apply here.
    $0.16/sq ft
County$3.48/sq ft
  • Transportation Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025 at the 70% phase-in rate ($3,336 per 1,000 sq ft). Scheduled increases: $3,813 (10/1/2026), $4,289 (10/1/2027), $4,766 (10/1/2028, full rate). Marion County transportation impact fee; applies countywide, including within all five municipalities.
    $3.34/sq ft
  • EMS Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.14/sq ft
  • Fire Protection Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    The Marion County fire protection impact fee is not charged within the City of Ocala, which operates its own fire department and levies its own fire impact fee (see the City of Ocala fire impact fee record).
    $0.00
Total (Ocala): $3.63/sq ft + $11,169.00 one-time (≈ $101,969.00 at 25,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Marion County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ocala impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Ocala impact fee FAQs

What are the total impact fees for a single-family home in Ocala, Florida?

A new single-family home in Ocala pays $11,927.00 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Ocala?

Commercial development in Ocala pays $5.18 per square foot in impact fees, plus $11,169.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $270,169.00 for a 50,000 sq ft building.

Does Ocala charge its own impact fees?

Yes. Ocala levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ocala, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Marion County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000