McIntosh impact fees by project type
McIntosh: Single-Family Impact Fees
A new single-family home in McIntosh pays $9,421.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Marion County-levied fees account for $9,021.00 and municipal or utility fees for $400.00.
The largest line items are Educational Facilities Impact Fee (Marion County Schools) ($4,307.00), Transportation Impact Fee (Marion County - 1,501-2,499 sf) ($3,723.00) and Fire Protection Impact Fee (Marion County - 1,501-2,499 sf) ($753.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full McIntosh impact fee schedule
- Water Connection Fee (McIntosh)$400.00Town of McIntoshThe Town of McIntosh operates its own water system and charges an initial water service connection fee of $400 before a meter is set, adopted by ordinance in 2013. Where a water line exceeds the standard diameter, the town charges the actual cost of the meter instead. A utility deposit and a turn-on fee are set separately by council resolution and are in addition to the connection fee.
- Sewer Connection Fee (McIntosh)$0.00Town of McIntoshThe Town of McIntosh operates a municipal water system and garbage collection service only. It has no central sanitary sewer system and its adopted utility ordinances contain no sewer charge, so no town sewer connection fee exists. Development in McIntosh is served by on-site septic systems permitted through Marion County and the state health department.
- City Impact Fees (Town of McIntosh)$0.00Town of McIntoshThe Town of McIntosh has adopted no municipal impact fee ordinance. Its codified ordinances and land development code contain no impact fee imposition section and no impact fee rate schedule, so the town itself charges none. Marion County's countywide impact fees for schools, fire and emergency services, and transportation are separate, and the county collects them inside a municipality only where the county and that city have entered an interlocal agreement.
- Educational Facilities Impact Fee (Marion County Schools)$4,307.00Marion County School BoardMarion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). Flat $4,307 per single-family detached / mobile-home dwelling unit. Applies countywide in all unincorporated and incorporated areas.
- Transportation Impact Fee (Marion County - 1,501-2,499 sf)$3,723.00Marion CountyMarion County Transportation Impact Fee, Ord. 25-18 (adopted 5/23/2025), effective 10/1/2025. Assessed at 70% now, stepping to 80% on 10/1/2026, 90% on 10/1/2027, 100% on 10/1/2028. SFR tiered by heated area; the 1,501–2,499 sf tier is $3,723 at 70% ($4,254 at the 80% step). Full 70% schedule: ≤1,500 sf $3,072, 1,501–2,499 sf $3,723, 2,500+ sf $4,099. Applies in unincorporated Marion County and within Belleview, Dunnellon, Ocala, Reddick and McIntosh as named in the adopted schedule.
- Fire Protection Impact Fee (Marion County - 1,501-2,499 sf)$753.00Marion CountyMarion County Fire Protection (MCFR) Impact Fee, Ord. 25-17, effective 10/1/2025 at 100% of the calculated rate. SFR tiered by heated area: ≤1,500 sf $663, 1,501–2,499 sf $753, 2,500+ sf $829; this record is the 1,501–2,499 sf tier at $753. Applies in unincorporated Marion County and the municipalities of Belleview, Dunnellon, Reddick and McIntosh — NOT within the City of Ocala, which levies its own City Fire Impact Fee.
- EMS Impact Fee (Marion County - 1,501-2,499 sf)$238.00Marion CountyMarion County EMS Impact Fee, Ord. 25-17, effective 10/1/2025 at 100% of the calculated rate. SFR tiered by heated area: ≤1,500 sf $208, 1,501–2,499 sf $238, 2,500+ sf $261; this record is the 1,501–2,499 sf tier at $238. Applies countywide — unincorporated Marion County and all municipalities, including McIntosh and the City of Ocala.
Where in Marion County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
McIntosh: Multifamily Impact Fees
A new multifamily unit in McIntosh pays $7,103.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Marion County-levied fees account for $6,703.00 and municipal or utility fees for $400.00.
The largest line items are Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00), Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18) ($1,688.00) and Fire Protection Impact Fee (MF - Ord. 25-17) ($505.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full McIntosh impact fee schedule
- Water Connection Fee (MF - McIntosh)$400.00Town of McIntoshThe Town of McIntosh charges a flat initial water service connection fee of $400 for each new utility account, residential or commercial, before a meter is set; the fee is not differentiated by dwelling type, so an individually metered multifamily unit pays the same $400. Where a water line exceeds the standard diameter the town charges the actual cost of the meter instead. The fee was adopted by ordinance in 2013 and may be reset by council resolution.
- Sewer Connection Fee (MF - McIntosh)$0.00Town of McIntoshThe Town of McIntosh operates a municipal water system and garbage collection service only. It has no central sanitary sewer system and its adopted utility ordinances contain no sewer charge, so no town sewer connection fee applies to multifamily development. Development in McIntosh is served by on-site septic systems permitted through Marion County and the state health department.
- City Impact Fees (Town of McIntosh, MF)$0.00Town of McIntoshThe Town of McIntosh has adopted no municipal impact fee ordinance, so no town impact fee applies to a new multifamily unit. Its codified ordinances and land development code contain no impact fee imposition section and no rate schedule. Marion County's countywide impact fees for schools, fire and emergency services, and transportation are separate, and the county collects them inside a municipality only where the county and that city have entered an interlocal agreement.
- Educational System Impact Fee (MF Apt 901-1200 sf)$4,337.00Marion County School BoardMarion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). MF apartments tiered by unit heated area: 1–700 sf $1,604; 701–900 sf $3,847; 901–1,200 sf $4,337 (default tier for a canonical ~1,000 sf unit); >1,200 sf $5,525; condominiums $1,990. This record is the 901–1,200 sf tier at $4,337. Applies countywide in all unincorporated and incorporated areas.
- Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)$1,688.00Mid/High-Rise (4+ Floors)Marion CountyMarion County Transportation Impact Fee, Ord. 25-18 (adopted 5/23/2025), effective 10/1/2025. Assessed at 70% now, stepping to 80% on 10/1/2026, 90% on 10/1/2027, 100% on 10/1/2028. MF tiered by building rise. Mid/High-Rise (4+ floors, ITE 221/222) is the default MF tier: $1,688/DU at 70%, then $1,930 (10/1/2026), $2,171 (10/1/2027), $2,412 (10/1/2028). Low-Rise (1–3 floors) is $2,513/DU at 70%. Applies in unincorporated Marion County and the municipalities named in the adopted schedule (Belleview, Dunnellon, Ocala, Reddick, McIntosh).
- Fire Protection Impact Fee (MF - Ord. 25-17)$505.00Marion CountyMarion County Fire Protection (MCFR) Impact Fee, Ord. 25-17, effective 10/1/2025 at 100% of the calculated rate. Multi-family flat $505 per dwelling unit (ITE 220/221/222). Applies in unincorporated Marion County and the municipalities of Belleview, Dunnellon, Reddick and McIntosh — NOT within the City of Ocala, which levies its own City Fire Impact Fee.
- EMS Impact Fee (MF - Ord. 25-17)$173.00Marion CountyMarion County EMS Impact Fee, Ord. 25-17, effective 10/1/2025 at 100% of the calculated rate. Multi-family flat $173 per dwelling unit. Applies countywide — unincorporated Marion County and all municipalities, including McIntosh and the City of Ocala.
Where in Marion County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
McIntosh: Commercial Impact Fees
Commercial development in McIntosh pays $6.22 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $311,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of McIntosh) ($400.00 one-time), Transportation Impact Fee (Marion County, Commercial) ($4.50/sq ft) and Fire Protection Impact Fee (Marion County, Commercial) ($1.31/sq ft).
View the full McIntosh impact fee schedule
- Water Connection Fee (Town of McIntosh)$400.00 one-timeTown of McIntoshFlat $400 initial connection fee applying to all customer classes; a water line larger than the standard diameter also pays the actual cost of the meter. The Town operates no central sewer system.
- Sewer Connection Fee (Town of McIntosh)$0.00Town of McIntoshThe Town of McIntosh operates no central sanitary sewer system; development is served by septic. No sewer connection fee applies.
- City Impact Fees (Town of McIntosh, Commercial)$0.00Town of McIntoshThe Town of McIntosh levies no municipal impact fee.
- Transportation Impact Fee (Marion County, Commercial)$4.50/sq ftMarion County Board of County CommissionersEffective 10/1/2025 at the 70% phase-in rate ($4,505 per 1,000 sq ft). Scheduled increases: $5,148 (10/1/2026), $5,792 (10/1/2027), $6,435 (10/1/2028, full rate). Marion County transportation impact fee; applies countywide, including within all five municipalities.
- Fire Protection Impact Fee (Marion County, Commercial)$1.31/sq ftMarion County Board of County CommissionersEffective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
- EMS Impact Fee (Marion County, Commercial)$0.41/sq ftMarion County Board of County CommissionersEffective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
Where in Marion County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
McIntosh: Industrial Impact Fees
Industrial development in McIntosh pays $1.78 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $89,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of McIntosh) ($400.00 one-time), Transportation Impact Fee (Marion County, Industrial) ($1.50/sq ft) and Fire Protection Impact Fee (Marion County, Industrial) ($0.21/sq ft).
View the full McIntosh impact fee schedule
- Water Connection Fee (Town of McIntosh)$400.00 one-timeTown of McIntoshFlat $400 initial connection fee applying to all customer classes; a water line larger than the standard diameter also pays the actual cost of the meter. The Town operates no central sewer system.
- Sewer Connection Fee (Town of McIntosh)$0.00Town of McIntoshThe Town of McIntosh operates no central sanitary sewer system; development is served by septic. No sewer connection fee applies.
- City Impact Fees (Town of McIntosh, Industrial)$0.00Town of McIntoshThe Town of McIntosh levies no municipal impact fee.
- Transportation Impact Fee (Marion County, Industrial)$1.50/sq ftMarion County Board of County CommissionersEffective 10/1/2025 at the 70% phase-in rate ($1,502 per 1,000 sq ft). Scheduled increases: $1,716 (10/1/2026), $1,931 (10/1/2027), $2,145 (10/1/2028, full rate). Marion County transportation impact fee; applies countywide, including within all five municipalities.
- Fire Protection Impact Fee (Marion County, Industrial)$0.21/sq ftMarion County Board of County CommissionersEffective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
- EMS Impact Fee (Marion County, Industrial)$0.07/sq ftMarion County Board of County CommissionersEffective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
Where in Marion County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
McIntosh: Office Impact Fees
Office development in McIntosh pays $3.93 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 25,000 sq ft building, that comes to about $98,625.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Town of McIntosh) ($400.00 one-time), Transportation Impact Fee (Marion County, Office) ($3.34/sq ft) and Fire Protection Impact Fee (Marion County, Office) ($0.45/sq ft).
View the full McIntosh impact fee schedule
- Water Connection Fee (Town of McIntosh)$400.00 one-timeTown of McIntoshFlat $400 initial connection fee applying to all customer classes; a water line larger than the standard diameter also pays the actual cost of the meter. The Town operates no central sewer system.
- Sewer Connection Fee (Town of McIntosh)$0.00Town of McIntoshThe Town of McIntosh operates no central sanitary sewer system; development is served by septic. No sewer connection fee applies.
- City Impact Fees (Town of McIntosh, Office)$0.00Town of McIntoshThe Town of McIntosh levies no municipal impact fee.
- Transportation Impact Fee (Marion County, Office)$3.34/sq ftMarion County Board of County CommissionersEffective 10/1/2025 at the 70% phase-in rate ($3,336 per 1,000 sq ft). Scheduled increases: $3,813 (10/1/2026), $4,289 (10/1/2027), $4,766 (10/1/2028, full rate). Marion County transportation impact fee; applies countywide, including within all five municipalities.
- Fire Protection Impact Fee (Marion County, Office)$0.45/sq ftMarion County Board of County CommissionersEffective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
- EMS Impact Fee (Marion County, Office)$0.14/sq ftMarion County Board of County CommissionersEffective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
Where in Marion County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
McIntosh impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
McIntosh impact fee FAQs
What are the total impact fees for a single-family home in McIntosh, Florida?
A new single-family home in McIntosh pays $9,421.00 per unit in combined impact fees (rates sourced August 5, 2026).
How much are commercial impact fees in McIntosh?
Commercial development in McIntosh pays $6.22 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees, about $311,200.00 for a 50,000 sq ft building.
Does McIntosh charge its own impact fees?
Yes. McIntosh levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in McIntosh, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Marion County impact fees page.