McIntosh applies its own fee schedule: municipal fees plus the Marion County-levied fees that apply inside city limits. Combined, a new single-family home pays $9,952.00 per unit (rates sourced ). The full breakdown is below.

McIntosh Impact Fees by Project Type

McIntosh: Single-Family Impact Fees

A new single-family home in McIntosh pays $9,952.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Marion County-levied fees account for $9,552.00 and municipal or utility fees for $400.00.

The largest line items are Educational Facilities Impact Fee (Marion County Schools) ($4,307.00), Transportation Impact Fee (Marion County - 1,501-2,499 sf) ($4,254.00) and Fire Protection Impact Fee (Marion County - 1,501-2,499 sf) ($753.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full McIntosh Impact Fee Schedule
Water$400.00
  • Water Connection Fee (McIntosh)
    Town of McIntosh
    The Town of McIntosh operates its own water system and charges an initial water service connection fee of $400 before a meter is set, adopted by ordinance in 2013. Where a water line exceeds the standard diameter, the town charges the actual cost of the meter instead. A utility deposit and a turn-on fee are set separately by council resolution and are in addition to the connection fee.
    $400.00
Sewer$0.00
  • Sewer Connection Fee (McIntosh)
    Town of McIntosh
    The Town of McIntosh operates a municipal water system and garbage collection service only. It has no central sanitary sewer system and its adopted utility ordinances contain no sewer charge, so no town sewer connection fee exists. Development in McIntosh is served by on-site septic systems permitted through Marion County and the state health department.
    $0.00
City$0.00
  • City Impact Fees (Town of McIntosh)
    Town of McIntosh
    The Town of McIntosh has adopted no municipal impact fee ordinance, so the town itself charges no impact fees. Marion County impact fees are separate: the county transportation, fire protection and EMS impact fees apply inside the town by county code, and the county school impact fee is imposed countywide.
    $0.00
County$9,552.00
  • Educational Facilities Impact Fee (Marion County Schools)
    Marion County School Board
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). Flat $4,307 per single-family detached / mobile-home dwelling unit. Applies countywide in all unincorporated and incorporated areas.
    $4,307.00
  • Transportation Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County transportation impact fee (Ord. 25-18, Code Sec. 10-327(b)), charged countywide including inside every city and phased in each October 1. Single-family detached homes are tiered by heated area: 1,500 sq ft or less $3,510; 1,501 to 2,499 sq ft $4,254; 2,500 sq ft or more $4,684 (the 80% step, effective October 1, 2026). Next steps: 90% on October 1, 2027 ($3,949 / $4,786 / $5,270) and 100% on October 1, 2028 ($4,388 / $5,318 / $5,855). Paid before the certificate of occupancy.
    $4,254.00
  • Fire Protection Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County fire protection impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in. Charged in unincorporated Marion County and inside Belleview, Dunnellon, Reddick and McIntosh; not charged in the City of Ocala, which levies its own fire impact fee. Single-family homes are tiered by heated area: 1,500 sq ft or less $663; 1,501 to 2,499 sq ft $753; 2,500 sq ft or more $829. Paid before the certificate of occupancy.
    $753.00
  • EMS Impact Fee (Marion County - 1,501-2,499 sf)
    Marion County
    Marion County EMS impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in. Charged countywide, in unincorporated Marion County and inside every city including Ocala. Single-family homes are tiered by heated area: 1,500 sq ft or less $208; 1,501 to 2,499 sq ft $238; 2,500 sq ft or more $261. Paid before the certificate of occupancy.
    $238.00
Total (McIntosh): $9,952.00
Sources last checked Official fee schedules:Town of McIntosh Marion County School Board Marion County

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

McIntosh: Multifamily Impact Fees

A new multifamily unit in McIntosh pays $7,345.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Marion County-levied fees account for $6,945.00 and municipal or utility fees for $400.00.

The largest line items are Educational System Impact Fee (MF Apt 901-1200 sf) ($4,337.00), Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18) ($1,930.00) and Fire Protection Impact Fee (MF - Ord. 25-17) ($505.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full McIntosh Impact Fee Schedule
Water$400.00
  • Water Connection Fee (MF - McIntosh)
    Town of McIntosh
    The Town of McIntosh charges a flat initial water service connection fee of $400 for each new utility account, residential or commercial, before a meter is set; the fee is not differentiated by dwelling type, so an individually metered multifamily unit pays the same $400. Where a water line exceeds the standard diameter the town charges the actual cost of the meter instead. The fee was adopted by ordinance in 2013 and may be reset by council resolution.
    $400.00
Sewer$0.00
  • Sewer Connection Fee (MF - McIntosh)
    Town of McIntosh
    The Town of McIntosh operates a municipal water system and garbage collection service only. It has no central sanitary sewer system and its adopted utility ordinances contain no sewer charge, so no town sewer connection fee applies to multifamily development. Development in McIntosh is served by on-site septic systems permitted through Marion County and the state health department.
    $0.00
City$0.00
  • City Impact Fees (Town of McIntosh, MF)
    Town of McIntosh
    The Town of McIntosh has adopted no municipal impact fee ordinance, so no town impact fee applies to a new multifamily unit. Marion County impact fees are separate: the county transportation, fire protection and EMS impact fees apply inside the town by county code, and the county school impact fee is imposed countywide.
    $0.00
County$6,945.00
  • Educational System Impact Fee (MF Apt 901-1200 sf)
    Marion County School Board
    Marion County Educational System Impact Fee (Marion County Public Schools), Ord. 24-06 (adopted 3/5/2024), effective 7/1/2024, Code §10-431(b). MF apartments tiered by unit heated area: 1–700 sf $1,604; 701–900 sf $3,847; 901–1,200 sf $4,337 (default tier for a canonical ~1,000 sf unit); >1,200 sf $5,525; condominiums $1,990. This record is the 901–1,200 sf tier at $4,337. Applies countywide in all unincorporated and incorporated areas.
    $4,337.00
  • Transportation Impact Fee (MF - Mid/High-Rise, Ord. 25-18)
    Mid/High-Rise (4+ Floors)
    Marion County
    Marion County transportation impact fee (Ord. 25-18, Code Sec. 10-327(b)), charged countywide including inside every city and phased in each October 1. Multifamily is tiered by building height: Low-Rise (1 to 3 floors) $2,872 per unit and Mid/High-Rise (4 or more floors) $1,930 per unit (the 80% step, effective October 1, 2026). Next steps: 90% on October 1, 2027 ($3,231 / $2,171) and 100% on October 1, 2028 ($3,590 / $2,412). Paid before the certificate of occupancy.
    $1,930.00
  • Fire Protection Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County fire protection impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in: a flat $505 per multifamily unit at any building height. Charged in unincorporated Marion County and inside Belleview, Dunnellon, Reddick and McIntosh; not charged in the City of Ocala, which levies its own fire impact fee. Paid before the certificate of occupancy.
    $505.00
  • EMS Impact Fee (MF - Ord. 25-17)
    Marion County
    Marion County EMS impact fee (Ord. 25-17, Code Sec. 10-340), effective October 1, 2025 at the full calculated rate, with no phase-in: a flat $173 per multifamily unit at any building height. Charged countywide, in unincorporated Marion County and inside every city including Ocala. Paid before the certificate of occupancy.
    $173.00
Total (McIntosh): $7,345.00
Sources last checked Official fee schedules:Town of McIntosh Marion County School Board Marion County

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

McIntosh: Commercial Impact Fees

Commercial development in McIntosh pays $6.86 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $343,350.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of McIntosh) ($400.00 one-time), Transportation Impact Fee (Marion County, Commercial) ($5.15/sq ft) and Fire Protection Impact Fee (Marion County, Commercial) ($1.31/sq ft).

View the Full McIntosh Impact Fee Schedule
Water$400.00 one-time
  • Water Connection Fee (Town of McIntosh)
    Town of McIntosh
    Flat $400 initial connection fee applying to all customer classes; a water line larger than the standard diameter also pays the actual cost of the meter. The Town operates no central sewer system.
    $400.00 one-time
Sewer$0.00
City$0.00
County$6.86/sq ft
  • Transportation Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. Retail of 40,001 to 150,000 sq ft pays per 1,000 sq ft of gross leasable area: $4,505 (70%, October 1, 2025), $5,148 (80%, October 1, 2026), $5,792 (90%, October 1, 2027) and $6,435 (100%, October 1, 2028). Smaller and larger retail centers pay different rates.
    $5.15/sq ft
  • Fire Protection Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
    $1.31/sq ft
  • EMS Impact Fee (Marion County, Commercial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.41/sq ft
Total (McIntosh): $6.86/sq ft + $400.00 one-time (≈ $343,350.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of McIntosh Marion County Board of County Commissioners

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

McIntosh: Industrial Impact Fees

Industrial development in McIntosh pays $2.00 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $100,200.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of McIntosh) ($400.00 one-time), Transportation Impact Fee (Marion County, Industrial) ($1.72/sq ft) and Fire Protection Impact Fee (Marion County, Industrial) ($0.21/sq ft).

View the Full McIntosh Impact Fee Schedule
Water$400.00 one-time
  • Water Connection Fee (Town of McIntosh)
    Town of McIntosh
    Flat $400 initial connection fee applying to all customer classes; a water line larger than the standard diameter also pays the actual cost of the meter. The Town operates no central sewer system.
    $400.00 one-time
Sewer$0.00
City$0.00
County$2.00/sq ft
  • Transportation Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. General light industrial pays per 1,000 sq ft of floor area: $1,502 (70%, October 1, 2025), $1,716 (80%, October 1, 2026), $1,931 (90%, October 1, 2027) and $2,145 (100%, October 1, 2028).
    $1.72/sq ft
  • Fire Protection Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
    $0.21/sq ft
  • EMS Impact Fee (Marion County, Industrial)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.07/sq ft
Total (McIntosh): $2.00/sq ft + $400.00 one-time (≈ $100,200.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of McIntosh Marion County Board of County Commissioners

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

McIntosh: Office Impact Fees

Office development in McIntosh pays $4.41 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to about $110,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Town of McIntosh) ($400.00 one-time), Transportation Impact Fee (Marion County, Office) ($3.81/sq ft) and Fire Protection Impact Fee (Marion County, Office) ($0.45/sq ft).

View the Full McIntosh Impact Fee Schedule
Water$400.00 one-time
  • Water Connection Fee (Town of McIntosh)
    Town of McIntosh
    Flat $400 initial connection fee applying to all customer classes; a water line larger than the standard diameter also pays the actual cost of the meter. The Town operates no central sewer system.
    $400.00 one-time
Sewer$0.00
City$0.00
County$4.41/sq ft
  • Transportation Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Marion County transportation impact fee (Ord. 25-18), charged countywide including inside all five cities and phased in each October 1. General office pays per 1,000 sq ft of floor area: $3,336 (70%, October 1, 2025), $3,813 (80%, October 1, 2026), $4,289 (90%, October 1, 2027) and $4,766 (100%, October 1, 2028).
    $3.81/sq ft
  • Fire Protection Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County fire protection impact fee; applies in unincorporated Marion and within Belleview, Dunnellon, Reddick and McIntosh. Not charged within Ocala, which levies its own municipal fire impact fee.
    $0.45/sq ft
  • EMS Impact Fee (Marion County, Office)
    Marion County Board of County Commissioners
    Effective 10/1/2025. Marion County EMS impact fee; applies countywide, including within all five municipalities (Ocala included).
    $0.14/sq ft
Total (McIntosh): $4.41/sq ft + $400.00 one-time (≈ $110,550.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of McIntosh Marion County Board of County Commissioners

Where in Marion County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

McIntosh Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

McIntosh Impact Fee FAQs

What are the total impact fees for a single-family home in McIntosh, Florida?

A new single-family home in McIntosh pays $9,952.00 per unit in combined impact fees (rates sourced October 21, 2026).

How much are commercial impact fees in McIntosh?

Commercial development in McIntosh pays $6.86 per square foot in impact fees, plus $400.00 in one-time water and sewer connection fees, about $343,350.00 for a 50,000 sq ft building.

Does McIntosh charge its own impact fees?

Yes. McIntosh levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in McIntosh, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Marion County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000