Pasco County Impact Fees by Project Type
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Pasco County: Single-Family Impact Fees
A new single-family home in unincorporated Pasco County pays $33,810.51 per unit in impact fees (rates sourced October 27, 2026). All of it is levied by Pasco County.
The largest line items are Mobility Fee (Pasco County - Rural Assessment District C, Standard) ($13,768.00), School Impact Fee (Pasco County - Single-Family Detached) ($10,328.00) and Parks & Recreation Impact Fee (Pasco County) ($3,450.15).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Pasco County Impact Fee Schedule
- Water Connection Fee (Pasco County Utilities - 1.0 ERU)$1,801.00Pasco County UtilitiesPasco County Utilities water connection fee, $1,801 per single-family unit (1.0 ERU, 5/8 to 3/4 inch meter), effective 10/1/2026 (FY27). Water with reclaimed: $1,351. Four-year schedule: $1,719 (FY26), $1,801 (FY27), $1,887 (FY28, from 10/1/2027), $1,977 (FY29, from 10/1/2028). Larger meters multiply the 1.0 ERU fee by the meter ERU factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25). Pasco County Utilities does not serve all unincorporated areas; some parcels use private utilities or wells.
- Wastewater (Sewer) Connection Fee (Pasco County Utilities - 1.0 ERU)$3,404.00Pasco County UtilitiesPasco County Utilities wastewater connection fee, $3,404 per single-family unit (1.0 ERU), effective 10/1/2026 (FY27). Four-year schedule: $3,250 (FY26), $3,404 (FY27), $3,566 (FY28, from 10/1/2027), $3,735 (FY29, from 10/1/2028). Larger meters multiply the 1.0 ERU fee by the meter ERU factor. Not all unincorporated areas are served by Pasco County Utilities (septic or private elsewhere).
- City/Municipal Impact Fee (N/A - Unincorporated)$0.00Pasco CountyNo municipal (city) impact fee applies in unincorporated Pasco County; development impact fees here are county-level (school, mobility, parks, fire/rescue, library, hurricane preparedness).
- Mobility Fee (Pasco County - Rural Assessment District C, Standard)$13,768.00Rural District C, SFD 1,501-2,499 sq ftPasco CountyPasco County Mobility Fee, Rural Assessment District C, single-family detached 1,501-2,499 sq ft: $13,768 (fee schedule effective 7/1/2026, Ord. 26-19). This is the highest of the county's three geographic assessment districts (Urban, Suburban, Rural) at this home size; a parcel pays the rate for the district it lies in, so most unincorporated growth pays the lower Suburban rate. A single detached home or accessory unit on a Rural lot of 5+ acres pays the Suburban rate. A separate $277 per-permit administration fee applies. Steps up on the 7/1/2027 schedule.
- School Impact Fee (Pasco County - Single-Family Detached)$10,328.00District School Board of Pasco CountyPasco County School Impact Fee, $10,328 per single-family detached dwelling (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district. Four-year phase-in: $9,328 (2025), $10,328 (2026), $11,328 (2027), $12,328 (2028). Mobile home 2026 = $5,795.50.
- Parks & Recreation Impact Fee (Pasco County)$3,450.15Pasco CountyPasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit (Park Land $705.41 + Facilities $2,744.74), for complete permit applications after 12/31/2023. One flat rate for single-family, multifamily and mobile homes. Three benefit districts govern where funds are spent; the rate is uniform countywide. Imposed in unincorporated Pasco and in municipalities that collect the county parks fee.
- Fire Combat & Rescue Service Impact Fee (Pasco County)$674.00Pasco County Fire RescuePasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for complete permit applications after 7/1/2025. Same per-unit rate for single-family and multifamily. Imposed in unincorporated Pasco and the municipalities of Dade City, St. Leo and San Antonio; in Zephyrhills only upon an interlocal agreement; in Port Richey and New Port Richey only the $258 rescue portion, and only upon an interlocal agreement.
- Hurricane Preparedness Mitigation Fee (Pasco County)$240.78Within Hurricane Vulnerability Zone (HVZ)Pasco County Office of Emergency ManagementPasco County Hurricane Preparedness Mitigation Fee, $240.78 per equivalent residential unit (Shelter $238.05 + Evacuation $2.73). Same rate for single-family and multifamily. Imposed only on units within the county Hurricane Vulnerability Zone (HVZ) plus all mobile homes; a project outside the HVZ pays $0. HVZ boundaries are set by county resolution.
- Library Impact Fee (Pasco County)$144.58Pasco CountyPasco County Library Impact Fee, $144.58 per single-family detached dwelling (Land $15.06 + Facilities $129.52). Multifamily and mobile homes pay $96.58. The county is one unified library-fee district. Collected inside a municipality only upon a county-approved interlocal agreement.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Pasco County: Multifamily Impact Fees
A new multifamily unit in unincorporated Pasco County pays $28,367.01 per unit in impact fees (rates sourced October 27, 2026). All of it is levied by Pasco County.
The largest line items are Mobility Fee (Pasco County - Rural Assessment District C, Standard) (MF) ($13,064.00), School Impact Fee (Pasco County) (MF) ($5,636.50) and Parks & Recreation Impact Fee (Pasco County) (MF) ($3,450.15).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Pasco County Impact Fee Schedule
- Water Connection Fee (Pasco County Utilities - 1.0 ERU) (MF)$1,801.00Pasco County UtilitiesPasco County Utilities water connection fee, $1,801 per 1.0 ERU (5/8 to 3/4 inch meter), effective 10/1/2026 (FY27). Multifamily is charged by master-meter size, not per unit: larger meters multiply the 1.0 ERU fee by the meter ERU factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Water with reclaimed: $1,351. Steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
- Wastewater (Sewer) Connection Fee (Pasco County Utilities - 1.0 ERU) (MF)$3,404.00Pasco County UtilitiesPasco County Utilities wastewater connection fee for multifamily is charged by master-meter size, not per unit: $3,404 per 1.0 ERU (5/8 to 3/4 inch meter, FY27, effective 10/1/2026) is the floor, scaling up with meter size (1 inch 2.5 ERU, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
- City/Municipal Impact Fee (N/A - Unincorporated) (MF)$0.00Pasco CountyNo municipal (city) impact fee applies in unincorporated Pasco County; development impact fees here are county-level (school, mobility, parks, fire/rescue, library, hurricane preparedness).
- Mobility Fee (Pasco County - Rural Assessment District C, Standard) (MF)$13,064.00Rural District C, Multi-Family ApartmentsPasco CountyPasco County Mobility Fee, Rural Assessment District C, multi-family apartments: $13,064 per unit (fee schedule effective 7/1/2026, Ord. 26-19). This is the highest of the county's three geographic assessment districts for apartments; a parcel pays the rate for the district it lies in, so most multifamily development pays the lower Suburban or Urban rate. A separate $277 per-permit administration fee applies. Steps up on the 7/1/2027 schedule.
- School Impact Fee (Pasco County) (MF)$5,636.50Pasco County School DistrictPasco County School Impact Fee, $5,636.50 per multifamily dwelling unit (rate for complete permit applications on/after 1/1/2026; covers apartments, condos, townhomes, duplexes and ADUs). Applies countywide. Four-year phase-in: $5,260.25 (2025), $5,636.50 (2026), $6,012.75 (2027), $6,389 (2028).
- Parks & Recreation Impact Fee (Pasco County) (MF)$3,450.15Pasco CountyPasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit (Park Land $705.41 + Facilities $2,744.74): one flat rate for single-family, multifamily and mobile homes, so the multifamily rate equals the single-family rate by design. For complete permit applications after 12/31/2023. Imposed in unincorporated Pasco and in municipalities that collect the county parks fee.
- Fire Combat & Rescue Service Impact Fee (Pasco County) (MF)$674.00Pasco County Fire RescuePasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for permits after 7/1/2025. Same per-unit rate for multifamily and single-family. Imposed in unincorporated Pasco and the municipalities of Dade City, St. Leo and San Antonio; in Zephyrhills only upon an interlocal; in Port Richey and New Port Richey only the $258 rescue portion, and only upon an interlocal.
- Hurricane Preparedness Mitigation Fee (Pasco County) (MF)$240.78Within Hurricane Vulnerability Zone (HVZ)Pasco County Office of Emergency ManagementPasco County Hurricane Preparedness Mitigation Fee, $240.78 per equivalent residential unit (Shelter $238.05 + Evacuation $2.73), same rate as single-family. Imposed only on units within the county Hurricane Vulnerability Zone (HVZ) plus all mobile homes; a project outside the HVZ pays $0. HVZ boundaries are set by county resolution.
- Library Impact Fee (Pasco County) (MF)$96.58Pasco CountyPasco County Library Impact Fee, $96.58 per multifamily or mobile-home dwelling unit (Land $10.06 + Facilities $86.52), lower than the $144.58 single-family rate. The county is one unified library-fee district. Collected inside a municipality only upon a county-approved interlocal agreement.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Pasco County: Commercial Impact Fees
Commercial development in unincorporated Pasco County pays $25.52 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 50,000 sq ft building, that comes to about $1,289,880.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter ($8,510.00 one-time), Water Connection Fee (Pasco County Utilities) — 1" meter ($4,502.50 one-time) and Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter ($618.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Pasco County Impact Fee Schedule
- Water Connection Fee (Pasco County Utilities) — 1" meter$4,502.50 one-timePasco County UtilitiesPasco County Utilities nonresidential water connection fee: $1,801 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Water with reclaimed service pays a lower base ($1,351 per ERU in FY27). Not all unincorporated areas are served by Pasco County Utilities.
- Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter$618.00 one-timePasco County UtilitiesPasco County Utilities water meter installation fee by meter size (FY27 rates page): $477 for a 5/8 to 3/4 inch meter, $618 for 1 to 1-1/4 inch, $864 for 1-1/2 inch and $1,063 for 2 inch. Paid in addition to the water connection fee. The utility does not list an installation fee for meters of 3 inches and larger.
- Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter$8,510.00 one-timePasco County UtilitiesPasco County Utilities nonresidential wastewater connection fee: $3,404 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
- City/Municipal Impact Fee (N/A - Unincorporated Pasco, Commercial)$0.00N/A - UnincorporatedUnincorporated Pasco County has no city government, so no municipal impact fee applies. Pasco County fees (mobility, fire combat and rescue) and Pasco County Utilities connection fees are listed separately.
- Mobility Fee (Pasco County, Commercial) — Rural District C, Retail 40,000-150,000 sq ft GLA$24.94/sq ftPasco CountyPasco County mobility fee for retail space in the Rural Assessment District (C), retail building of 40,000 to 150,000 sq ft: $24,939 per 1,000 sq ft of gross leasable area on the fee schedule effective 7/1/2026 (Ord. 26-19), rising to $36,659 on 7/1/2027. This is the highest of 3 rate districts (Urban, Suburban, Rural); a parcel pays the rate for the district it lies in, and most unincorporated growth is in the lower Suburban district. Retail buildings under 40,000 sq ft or over 150,000 sq ft pay their own bracket rate. A $277 per-permit administration fee also applies.
- Fire Combat & Rescue Service Impact Fee (Pasco County, Commercial)$0.59/sq ftPasco CountyPasco County Fire Combat and Rescue Service impact fee: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation. Applies in unincorporated Pasco County.
- Library Impact Fee (Pasco County, Commercial)$0.00Pasco CountyPasco County's library impact fee is levied on residential development only; nonresidential development pays $0.
- Parks & Recreation Impact Fee (Pasco County, Commercial)$0.00Pasco CountyPasco County's park & recreation impact fee is levied on residential development only; nonresidential development pays $0.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Pasco County: Industrial Impact Fees
Industrial development in unincorporated Pasco County pays $0.59 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 50,000 sq ft building, that comes to about $42,930.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter ($8,510.00 one-time), Water Connection Fee (Pasco County Utilities) — 1" meter ($4,502.50 one-time) and Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter ($618.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Pasco County Impact Fee Schedule
- Water Connection Fee (Pasco County Utilities) — 1" meter$4,502.50 one-timePasco County UtilitiesPasco County Utilities nonresidential water connection fee: $1,801 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Water with reclaimed service pays a lower base ($1,351 per ERU in FY27). Not all unincorporated areas are served by Pasco County Utilities.
- Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter$618.00 one-timePasco County UtilitiesPasco County Utilities water meter installation fee by meter size (FY27 rates page): $477 for a 5/8 to 3/4 inch meter, $618 for 1 to 1-1/4 inch, $864 for 1-1/2 inch and $1,063 for 2 inch. Paid in addition to the water connection fee. The utility does not list an installation fee for meters of 3 inches and larger.
- Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter$8,510.00 one-timePasco County UtilitiesPasco County Utilities nonresidential wastewater connection fee: $3,404 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
- City/Municipal Impact Fee (N/A - Unincorporated Pasco, Industrial)$0.00N/A - UnincorporatedUnincorporated Pasco County has no city government, so no municipal impact fee applies. Pasco County fees (mobility, fire combat and rescue) and Pasco County Utilities connection fees are listed separately.
- Fire Combat & Rescue Service Impact Fee (Pasco County, Industrial)$0.59/sq ftPasco CountyPasco County Fire Combat and Rescue Service impact fee: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation. Applies in unincorporated Pasco County.
- Mobility Fee (Pasco County - Suburban Assessment District B, Industrial)$0.00Pasco CountyPasco County's mobility fee for general light industrial space is $0 in every assessment district (Urban, Suburban and Rural) on the fee schedule effective 7/1/2026 (Ord. 26-19), and stays $0 on the 7/1/2027 schedule; warehouse and high-cube warehouse uses carry separate rates. A $277 per-permit mobility administration fee applies to all land uses, including those with a $0 mobility fee.
- Library Impact Fee (Pasco County, Industrial)$0.00Pasco CountyPasco County's library impact fee is levied on residential development only; nonresidential development pays $0.
- Parks & Recreation Impact Fee (Pasco County, Industrial)$0.00Pasco CountyPasco County's park & recreation impact fee is levied on residential development only; nonresidential development pays $0.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Pasco County: Office Impact Fees
Office development in unincorporated Pasco County pays $0.59 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 25,000 sq ft building, that comes to about $28,280.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter ($8,510.00 one-time), Water Connection Fee (Pasco County Utilities) — 1" meter ($4,502.50 one-time) and Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter ($618.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Pasco County Impact Fee Schedule
- Water Connection Fee (Pasco County Utilities) — 1" meter$4,502.50 one-timePasco County UtilitiesPasco County Utilities nonresidential water connection fee: $1,801 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Water with reclaimed service pays a lower base ($1,351 per ERU in FY27). Not all unincorporated areas are served by Pasco County Utilities.
- Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter$618.00 one-timePasco County UtilitiesPasco County Utilities water meter installation fee by meter size (FY27 rates page): $477 for a 5/8 to 3/4 inch meter, $618 for 1 to 1-1/4 inch, $864 for 1-1/2 inch and $1,063 for 2 inch. Paid in addition to the water connection fee. The utility does not list an installation fee for meters of 3 inches and larger.
- Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter$8,510.00 one-timePasco County UtilitiesPasco County Utilities nonresidential wastewater connection fee: $3,404 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
- City/Municipal Impact Fee (N/A - Unincorporated Pasco, Office)$0.00N/A - UnincorporatedUnincorporated Pasco County has no city government, so no municipal impact fee applies. Pasco County fees (mobility, fire combat and rescue) and Pasco County Utilities connection fees are listed separately.
- Fire Combat & Rescue Service Impact Fee (Pasco County, Office)$0.59/sq ftPasco CountyPasco County Fire Combat and Rescue Service impact fee: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation. Applies in unincorporated Pasco County.
- Mobility Fee (Pasco County - Suburban Assessment District B, Office)$0.00Pasco CountyPasco County's mobility fee for general office space is $0 in every assessment district (Urban, Suburban and Rural) on the fee schedule effective 7/1/2026 (Ord. 26-19), and stays $0 on the 7/1/2027 schedule. A $277 per-permit mobility administration fee applies to all land uses, including those with a $0 mobility fee.
- Parks & Recreation Impact Fee (Pasco County, Office)$0.00Pasco CountyPasco County's park & recreation impact fee is levied on residential development only; nonresidential development pays $0.
- Library Impact Fee (Pasco County, Office)$0.00Pasco CountyPasco County's library impact fee is levied on residential development only; nonresidential development pays $0.
Pasco County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Pasco County Impact Fee FAQs
What are single-family impact fees in Pasco County, Florida?
A new single-family home in unincorporated Pasco County pays $33,810.51 per unit in impact fees (rates sourced October 27, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Pasco County?
Multifamily development in unincorporated Pasco County pays $28,367.01 per unit in impact fees (rates sourced October 27, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Pasco County?
Commercial development in unincorporated Pasco County pays $25.52 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,289,880.50 for a 50,000 sq ft building.
Do Wesley Chapel and Land O' Lakes pay Pasco County impact fees?
Yes. Wesley Chapel, Land O' Lakes, Bayonet Point and Holiday are unincorporated, so new construction there pays the unincorporated Pasco County schedule on this page, not a city schedule. Search a specific address in the calculator below to confirm it sits outside every city limit.
Do cities in Pasco County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 5 of 6 cities in Pasco County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.