Skip to content
IMPACTFEES.ORG

Pasco County, Florida Impact Fees

Impact fees in Pasco County depend on where you build. This page details the rates for unincorporated Pasco County: $34,287.51 per single-family unit as of . Unincorporated communities such as Wesley Chapel, Land O' Lakes and Bayonet Point pay these county rates rather than a city schedule. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Pasco County Impact Fees by Project Type

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Pasco County: Single-Family Impact Fees

A new single-family home in unincorporated Pasco County pays $34,287.51 per unit in impact fees (rates sourced November 16, 2026). All of it is levied by Pasco County.

The largest line items are Mobility Fee (Pasco County - Rural Assessment District C, Standard) ($13,768.00), School Impact Fee (Pasco County - Single-Family Detached) ($10,328.00) and Parks & Recreation Impact Fee (Pasco County) ($3,450.15).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pasco County Impact Fee Schedule
Water$2,278.00
  • Water Connection Fee (Pasco County Utilities) — 5/8"-3/4" meter
    Pasco County Utilities
    Pasco County Utilities water connection fee, $1,801 per single-family unit (1.0 ERU, 5/8 to 3/4 inch meter), effective 10/1/2026 (FY27). Water with reclaimed: $1,351. Four-year schedule: $1,719 (FY26), $1,801 (FY27), $1,887 (FY28, from 10/1/2027), $1,977 (FY29, from 10/1/2028). Larger meters multiply the 1.0 ERU fee by the meter ERU factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25). Pasco County Utilities does not serve all unincorporated areas; some parcels use private utilities or wells.
    $1,801.00
  • Water Meter Installation Fee (Pasco County Utilities) — 5/8"-3/4" meter
    Pasco County Utilities
    Pasco County Utilities water meter installation fee, paid once per new water meter in addition to the water connection fee: $477 for the standard 5/8 to 3/4 inch meter (effective 10/1/2026), stepping to $500 on 10/1/2027 and $524 on 10/1/2028. Larger meters: $618 (1 to 1-1/4 inch), $864 (1-1/2 inch), $1,063 (2 inch).
    $477.00
Sewer$3,404.00
  • Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 5/8"-3/4" meter
    Pasco County Utilities
    Pasco County Utilities wastewater connection fee, $3,404 per single-family unit (1.0 ERU), effective 10/1/2026 (FY27). Four-year schedule: $3,250 (FY26), $3,404 (FY27), $3,566 (FY28, from 10/1/2027), $3,735 (FY29, from 10/1/2028). Larger meters multiply the 1.0 ERU fee by the meter ERU factor. Not all unincorporated areas are served by Pasco County Utilities (septic or private elsewhere).
    $3,404.00
City$0.00
  • City/Municipal Impact Fee (N/A - Unincorporated)
    Pasco County
    No municipal (city) impact fee applies in unincorporated Pasco County; development impact fees here are county-level (school, mobility, parks, fire/rescue, library, hurricane preparedness).
    $0.00
County$28,605.51
  • Mobility Fee (Pasco County - Rural Assessment District C, Standard)
    Rural District C, SFD 1,501-2,499 sq ft
    Pasco County
    Pasco County Mobility Fee, Rural Assessment District C, single-family detached 1,501-2,499 sq ft: $13,768 (fee schedule effective 7/1/2026, Ord. 26-19). This is the highest of the county's three geographic assessment districts (Urban, Suburban, Rural) at this home size; a parcel pays the rate for the district it lies in, so most unincorporated growth pays the lower Suburban rate. A single detached home or accessory unit on a Rural lot of 5+ acres pays the Suburban rate. A separate $277 per-permit administration fee applies. Steps up on the 7/1/2027 schedule. Inside Connected City, entitled homes add a surcharge of 0.05% of this fee (Exhibit 603-C); the Villages of Pasadena Hills transportation surcharge is 0% from 7/1/2026.
    $13,768.00
  • School Impact Fee (Pasco County - Single-Family Detached)
    District School Board of Pasco County
    Pasco County School Impact Fee, $10,328 per single-family detached dwelling (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district. Four-year phase-in: $9,328 (2025), $10,328 (2026), $11,328 (2027), $12,328 (2028). Mobile home 2026 = $5,795.50.
    $10,328.00
  • Parks & Recreation Impact Fee (Pasco County)
    Pasco County
    Pasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit (Park Land $705.41 + Facilities $2,744.74), for complete permit applications after 12/31/2023. One flat rate for single-family, multifamily and mobile homes. Three benefit districts govern where funds are spent; the rate is uniform countywide. Imposed in unincorporated Pasco and in municipalities that collect the county parks fee.
    $3,450.15
  • Fire Combat & Rescue Service Impact Fee (Pasco County)
    Pasco County Fire Rescue
    Pasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for complete permit applications after 7/1/2025. Same per-unit rate for single-family and multifamily. Imposed in unincorporated Pasco and the municipalities of Dade City, St. Leo and San Antonio; in Zephyrhills only upon an interlocal agreement; in Port Richey and New Port Richey only the $258 rescue portion, and only upon an interlocal agreement.
    $674.00
  • Hurricane Preparedness Mitigation Fee (Pasco County)
    Within Hurricane Vulnerability Zone (HVZ)
    Pasco County Office of Emergency Management
    Pasco County Hurricane Preparedness Mitigation Fee, $240.78 per equivalent residential unit (Shelter $238.05 + Evacuation $2.73). Same rate for single-family and multifamily. Imposed only on units within the county Hurricane Vulnerability Zone (HVZ) plus all mobile homes; a project outside the HVZ pays $0. HVZ boundaries are set by county resolution.
    $240.78
  • Library Impact Fee (Pasco County)
    Pasco County
    Pasco County Library Impact Fee, $144.58 per single-family detached dwelling (Land $15.06 + Facilities $129.52). Multifamily and mobile homes pay $96.58. The county is one unified library-fee district. Collected inside a municipality only upon a county-approved interlocal agreement.
    $144.58
Total (unincorporated Pasco County): $34,287.51

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Pasco County: Multifamily Impact Fees

A new multifamily unit in unincorporated Pasco County pays $28,844.01 per unit in impact fees (rates sourced November 16, 2026). All of it is levied by Pasco County.

The largest line items are Mobility Fee (Pasco County - Rural Assessment District C, Standard) (MF) ($13,064.00), School Impact Fee (Pasco County) (MF) ($5,636.50) and Parks & Recreation Impact Fee (Pasco County) (MF) ($3,450.15).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pasco County Impact Fee Schedule
Water$2,278.00
  • Water Connection Fee (Pasco County Utilities, MF) — 5/8"-3/4" meter
    Pasco County Utilities
    Pasco County Utilities water connection fee, charged per water meter: $1,801 for each 5/8 to 3/4 inch meter (1.0 ERU, FY2027, effective 10/1/2026). A building on one master meter of 1 inch or larger pays once at that meter's ERU factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Water with reclaimed: $1,351. Steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
    $1,801.00
  • Water Meter Installation Fee (Pasco County Utilities, MF) — 5/8"-3/4" meter
    Pasco County Utilities
    Pasco County Utilities water meter installation fee, paid once per new water meter in addition to the water connection fee: $477 for the standard 5/8 to 3/4 inch meter (effective 10/1/2026), stepping to $500 on 10/1/2027 and $524 on 10/1/2028. Larger meters: $618 (1 to 1-1/4 inch), $864 (1-1/2 inch), $1,063 (2 inch). A building on one master meter pays once at that meter's size.
    $477.00
Sewer$3,404.00
  • Wastewater (Sewer) Connection Fee (Pasco County Utilities, MF) — 5/8"-3/4" meter
    Pasco County Utilities
    Pasco County Utilities wastewater connection fee, charged per water meter: $3,404 for each 5/8 to 3/4 inch meter (1.0 ERU, FY2027, effective 10/1/2026). A building on one master meter of 1 inch or larger pays once at that meter's ERU factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
    $3,404.00
City$0.00
County$23,162.01
  • Mobility Fee (Pasco County - Rural Assessment District C, Standard) (MF)
    Rural District C, Multi-Family Apartments
    Pasco County
    Pasco County Mobility Fee, Rural Assessment District C, multi-family apartments: $13,064 per unit (fee schedule effective 7/1/2026, Ord. 26-19). This is the highest of the county's three geographic assessment districts for apartments; a parcel pays the rate for the district it lies in, so most multifamily development pays the lower Suburban or Urban rate. A separate $277 per-permit administration fee applies. Steps up on the 7/1/2027 schedule. Inside Connected City, entitled homes add a surcharge of 0.05% of this fee (Exhibit 603-C); the Villages of Pasadena Hills transportation surcharge is 0% from 7/1/2026.
    $13,064.00
  • School Impact Fee (Pasco County) (MF)
    Pasco County School District
    Pasco County School Impact Fee, $5,636.50 per multifamily dwelling unit (rate for complete permit applications on/after 1/1/2026; covers apartments, condos, townhomes, duplexes and ADUs). Applies countywide. Four-year phase-in: $5,260.25 (2025), $5,636.50 (2026), $6,012.75 (2027), $6,389 (2028).
    $5,636.50
  • Parks & Recreation Impact Fee (Pasco County) (MF)
    Pasco County
    Pasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit (Park Land $705.41 + Facilities $2,744.74): one flat rate for single-family, multifamily and mobile homes, so the multifamily rate equals the single-family rate by design. For complete permit applications after 12/31/2023. Imposed in unincorporated Pasco and in municipalities that collect the county parks fee.
    $3,450.15
  • Fire Combat & Rescue Service Impact Fee (Pasco County) (MF)
    Pasco County Fire Rescue
    Pasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for permits after 7/1/2025. Same per-unit rate for multifamily and single-family. Imposed in unincorporated Pasco and the municipalities of Dade City, St. Leo and San Antonio; in Zephyrhills only upon an interlocal; in Port Richey and New Port Richey only the $258 rescue portion, and only upon an interlocal.
    $674.00
  • Hurricane Preparedness Mitigation Fee (Pasco County) (MF)
    Within Hurricane Vulnerability Zone (HVZ)
    Pasco County Office of Emergency Management
    Pasco County Hurricane Preparedness Mitigation Fee, $240.78 per equivalent residential unit (Shelter $238.05 + Evacuation $2.73), same rate as single-family. Imposed only on units within the county Hurricane Vulnerability Zone (HVZ) plus all mobile homes; a project outside the HVZ pays $0. HVZ boundaries are set by county resolution.
    $240.78
  • Library Impact Fee (Pasco County) (MF)
    Pasco County
    Pasco County Library Impact Fee, $96.58 per multifamily or mobile-home dwelling unit (Land $10.06 + Facilities $86.52), lower than the $144.58 single-family rate. The county is one unified library-fee district. Collected inside a municipality only upon a county-approved interlocal agreement.
    $96.58
Total (unincorporated Pasco County): $28,844.01

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Pasco County: Commercial Impact Fees

Commercial development in unincorporated Pasco County pays $25.52 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to about $1,289,880.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter ($8,510.00 one-time), Water Connection Fee (Pasco County Utilities) — 1" meter ($4,502.50 one-time) and Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter ($618.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pasco County Impact Fee Schedule
Water$5,120.50 one-time
  • Water Connection Fee (Pasco County Utilities) — 1" meter
    Pasco County Utilities
    Pasco County Utilities nonresidential water connection fee: $1,801 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Water with reclaimed service pays a lower base ($1,351 per ERU in FY27). Not all unincorporated areas are served by Pasco County Utilities.
    $4,502.50 one-time
  • Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter
    Pasco County Utilities
    Pasco County Utilities water meter installation fee for a 1 to 1-1/4 inch meter: $618 (effective 10/1/2026), stepping to $647 on 10/1/2027 and $678 on 10/1/2028. Paid once per new meter in addition to the water connection fee. No installation fee is listed for meters of 3 inches and larger.
    $618.00 one-time
Sewer$8,510.00 one-time
  • Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter
    Pasco County Utilities
    Pasco County Utilities nonresidential wastewater connection fee: $3,404 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
    $8,510.00 one-time
City$0.00
County$25.52/sq ft
  • Mobility Fee (Pasco County, Commercial) — Rural District C, Retail 40,000-150,000 sq ft GLA
    Pasco County
    Pasco County mobility fee for retail space in the Rural Assessment District (C), retail building of 40,000 to 150,000 sq ft: $24,939 per 1,000 sq ft of gross leasable area on the fee schedule effective 7/1/2026 (Ord. 26-19), rising to $36,659 on 7/1/2027. This is the highest of 3 rate districts (Urban, Suburban, Rural); a parcel pays the rate for the district it lies in, and most unincorporated growth is in the lower Suburban district. Retail buildings under 40,000 sq ft or over 150,000 sq ft pay their own bracket rate. A $277 per-permit administration fee also applies.
    $24.94/sq ft
  • Fire Combat & Rescue Service Impact Fee (Pasco County, Commercial)
    Pasco County
    Pasco County Fire Combat and Rescue Service impact fee: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation. Applies in unincorporated Pasco County.
    $0.59/sq ft
  • Library Impact Fee (Pasco County, Commercial)
    Pasco County
    Pasco County's library impact fee is levied on residential development only; nonresidential development pays $0.
    $0.00
  • Parks & Recreation Impact Fee (Pasco County, Commercial)
    Pasco County
    Pasco County's park & recreation impact fee is levied on residential development only; nonresidential development pays $0.
    $0.00
Total (unincorporated Pasco County): $25.52/sq ft + $13,630.50 one-time (≈ $1,289,880.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Pasco County Utilities N/A - Unincorporated Pasco County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Pasco County: Industrial Impact Fees

Industrial development in unincorporated Pasco County pays $0.59 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to about $42,930.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter ($8,510.00 one-time), Water Connection Fee (Pasco County Utilities) — 1" meter ($4,502.50 one-time) and Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter ($618.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pasco County Impact Fee Schedule
Water$5,120.50 one-time
  • Water Connection Fee (Pasco County Utilities) — 1" meter
    Pasco County Utilities
    Pasco County Utilities nonresidential water connection fee: $1,801 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Water with reclaimed service pays a lower base ($1,351 per ERU in FY27). Not all unincorporated areas are served by Pasco County Utilities.
    $4,502.50 one-time
  • Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter
    Pasco County Utilities
    Pasco County Utilities water meter installation fee for a 1 to 1-1/4 inch meter: $618 (effective 10/1/2026), stepping to $647 on 10/1/2027 and $678 on 10/1/2028. Paid once per new meter in addition to the water connection fee. No installation fee is listed for meters of 3 inches and larger.
    $618.00 one-time
Sewer$8,510.00 one-time
  • Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter
    Pasco County Utilities
    Pasco County Utilities nonresidential wastewater connection fee: $3,404 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
    $8,510.00 one-time
City$0.00
County$0.59/sq ft
  • Fire Combat & Rescue Service Impact Fee (Pasco County, Industrial)
    Pasco County
    Pasco County Fire Combat and Rescue Service impact fee: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation. Applies in unincorporated Pasco County.
    $0.59/sq ft
  • Mobility Fee (Pasco County - Suburban Assessment District B, Industrial)
    Pasco County
    Pasco County's mobility fee for general light industrial space is $0 in every assessment district (Urban, Suburban and Rural) on the fee schedule effective 7/1/2026 (Ord. 26-19), and stays $0 on the 7/1/2027 schedule; warehouse and high-cube warehouse uses carry separate rates. A $277 per-permit mobility administration fee applies to all land uses, including those with a $0 mobility fee.
    $0.00
  • Library Impact Fee (Pasco County, Industrial)
    Pasco County
    Pasco County's library impact fee is levied on residential development only; nonresidential development pays $0.
    $0.00
  • Parks & Recreation Impact Fee (Pasco County, Industrial)
    Pasco County
    Pasco County's park & recreation impact fee is levied on residential development only; nonresidential development pays $0.
    $0.00
Total (unincorporated Pasco County): $0.59/sq ft + $13,630.50 one-time (≈ $42,930.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Pasco County Utilities N/A - Unincorporated Pasco County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Pasco County: Office Impact Fees

Office development in unincorporated Pasco County pays $0.59 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 25,000 sq ft building, that comes to about $28,280.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter ($8,510.00 one-time), Water Connection Fee (Pasco County Utilities) — 1" meter ($4,502.50 one-time) and Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter ($618.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pasco County Impact Fee Schedule
Water$5,120.50 one-time
  • Water Connection Fee (Pasco County Utilities) — 1" meter
    Pasco County Utilities
    Pasco County Utilities nonresidential water connection fee: $1,801 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $1,887 on 10/1/2027 and $1,977 on 10/1/2028. Water with reclaimed service pays a lower base ($1,351 per ERU in FY27). Not all unincorporated areas are served by Pasco County Utilities.
    $4,502.50 one-time
  • Water Meter Installation Fee (Pasco County Utilities) — 1" to 1-1/4" meter
    Pasco County Utilities
    Pasco County Utilities water meter installation fee for a 1 to 1-1/4 inch meter: $618 (effective 10/1/2026), stepping to $647 on 10/1/2027 and $678 on 10/1/2028. Paid once per new meter in addition to the water connection fee. No installation fee is listed for meters of 3 inches and larger.
    $618.00 one-time
Sewer$8,510.00 one-time
  • Wastewater (Sewer) Connection Fee (Pasco County Utilities) — 1" meter
    Pasco County Utilities
    Pasco County Utilities nonresidential wastewater connection fee: $3,404 per 1.0 ERU (FY27, effective 10/1/2026) multiplied by the meter's ERU factor (5/8 to 3/4 inch 1, 1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). The 1.0 ERU fee steps to $3,566 on 10/1/2027 and $3,735 on 10/1/2028. Not all unincorporated areas are served by Pasco County Utilities.
    $8,510.00 one-time
City$0.00
County$0.59/sq ft
  • Fire Combat & Rescue Service Impact Fee (Pasco County, Office)
    Pasco County
    Pasco County Fire Combat and Rescue Service impact fee: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation. Applies in unincorporated Pasco County.
    $0.59/sq ft
  • Mobility Fee (Pasco County - Suburban Assessment District B, Office)
    Pasco County
    Pasco County's mobility fee for general office space is $0 in every assessment district (Urban, Suburban and Rural) on the fee schedule effective 7/1/2026 (Ord. 26-19), and stays $0 on the 7/1/2027 schedule. A $277 per-permit mobility administration fee applies to all land uses, including those with a $0 mobility fee.
    $0.00
  • Parks & Recreation Impact Fee (Pasco County, Office)
    Pasco County
    Pasco County's park & recreation impact fee is levied on residential development only; nonresidential development pays $0.
    $0.00
  • Library Impact Fee (Pasco County, Office)
    Pasco County
    Pasco County's library impact fee is levied on residential development only; nonresidential development pays $0.
    $0.00
Total (unincorporated Pasco County): $0.59/sq ft + $13,630.50 one-time (≈ $28,280.50 at 25,000 sq ft)
Sources last checked Official fee schedules:Pasco County Utilities N/A - Unincorporated Pasco County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Pasco County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Pasco County Impact Fee FAQs

What are single-family impact fees in Pasco County, Florida?

A new single-family home in unincorporated Pasco County pays $34,287.51 per unit in impact fees (rates sourced November 16, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Pasco County?

Multifamily development in unincorporated Pasco County pays $28,844.01 per unit in impact fees (rates sourced November 16, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Pasco County?

Commercial development in unincorporated Pasco County pays $25.52 per square foot in impact fees, plus $13,630.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,289,880.50 for a 50,000 sq ft building.

Do Wesley Chapel and Land O' Lakes pay Pasco County impact fees?

Yes. Wesley Chapel, Land O' Lakes, Bayonet Point and Holiday are unincorporated, so new construction there pays the unincorporated Pasco County schedule on this page, not a city schedule. Search a specific address in the calculator below to confirm it sits outside every city limit.

Do cities in Pasco County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 6 of 6 cities in Pasco County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000