Dade City applies its own fee schedule: municipal fees plus the Pasco County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $23,072.03 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Dade City Impact Fees by Project Type

Dade City: Single-Family Impact Fees

A new single-family home in Dade City pays at least $23,072.03 per unit in impact fees (rates sourced October 27, 2026). Of that, Pasco County-levied fees account for $14,596.73 and municipal or utility fees for $8,475.30.

The largest line items are School Impact Fee (Pasco County - Single-Family Detached) ($10,328.00), Wastewater System Development Charge (Dade City - 1 ERU, 5/8"-3/4" meter) ($5,811.00) and Parks & Recreation Impact Fee (Pasco County, collected by Dade City) ($3,450.15).

Multi-Modal Transportation Impact Fee (City of Dade City) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dade City Impact Fee Schedule
Water$2,115.00
Sewer$5,811.00
City$549.30
County$14,596.73
  • School Impact Fee (Pasco County - Single-Family Detached)
    District School Board of Pasco County
    Pasco County School Impact Fee, $10,328 per single-family detached dwelling (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district and is collected within the city. Four-year phase-in: $9,328 (2025), $10,328 (2026), $11,328 (2027), $12,328 (2028). Multifamily units pay $5,636.50.
    $10,328.00
  • Parks & Recreation Impact Fee (Pasco County, collected by Dade City)
    Pasco County
    Pasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit, collected by the City of Dade City on the county's behalf. One flat rate for single-family, multifamily and mobile homes; in effect for complete permit applications after 12/31/2023.
    $3,450.15
  • Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City)
    Pasco County Fire Rescue
    Pasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for complete permit applications after 7/1/2025. Same per-unit rate for single-family and multifamily. The county land development code (Sec. 1302.6) names Dade City for imposition of this fee with no interlocal-agreement condition.
    $674.00
  • Library Impact Fee (Pasco County, collected by Dade City)
    Pasco County
    Pasco County Library Impact Fee, $144.58 per single-family detached dwelling (Land $15.06 + Facilities $129.52); multifamily and mobile homes pay $96.58. Collected by the City of Dade City on the county's behalf. The county is one unified library-fee district.
    $144.58
Total (Dade City): $23,072.03
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dade City: Multifamily Impact Fees

A new multifamily unit in Dade City pays at least $18,206.73 per unit in impact fees (rates sourced October 27, 2026). Of that, Pasco County-levied fees account for $9,857.23 and municipal or utility fees for $8,349.50.

The largest line items are Wastewater System Development Charge (Dade City) (MF) ($5,811.00), School Impact Fee (Pasco County) (MF) ($5,636.50) and Parks & Recreation Impact Fee (Pasco County, collected by Dade City) (MF) ($3,450.15).

Multi-Modal Transportation Impact Fee (City of Dade City, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Dade City Impact Fee Schedule
Water$2,115.00
  • Water System Development Charge (Dade City) (MF)
    1.0 ERU (5/8"-3/4" master meter)
    City of Dade City
    Dade City water system development charge, $2,115 per unit (1.0 ERU, 5/8 or 3/4 inch meter). Each dwelling unit is normally a separate service with its own meter; for a building of five or more units the city may allow a master meter, which is charged by meter size (1 inch 2.5 ERU, 2 inch 8 ERU, 4 inch 25 ERU, and so on). Payable before the building permit is issued.
    $2,115.00
Sewer$5,811.00
  • Wastewater System Development Charge (Dade City) (MF)
    1.0 ERU (5/8"-3/4" master meter)
    City of Dade City
    Dade City wastewater system development charge, $5,811 per unit (1.0 ERU, about 270 gallons per day). Each dwelling unit is normally a separate service; for a building of five or more units the city may allow a master meter, which is charged by meter size (1 inch 2.5 ERU, 2 inch 8 ERU, 4 inch 25 ERU, and so on). Payable before the building permit is issued.
    $5,811.00
City$423.50
County$9,857.23
  • School Impact Fee (Pasco County) (MF)
    District School Board of Pasco County
    Pasco County School Impact Fee, $5,636.50 per multifamily unit (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district and is collected within the city. The fee phases up each year through 2028; the single-family detached rate is $10,328 in 2026.
    $5,636.50
  • Parks & Recreation Impact Fee (Pasco County, collected by Dade City) (MF)
    Pasco County
    Pasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit, collected by the City of Dade City on the county's behalf. One flat rate for single-family, multifamily and mobile homes; in effect for complete permit applications after 12/31/2023.
    $3,450.15
  • Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City) (MF)
    Pasco County Fire Rescue
    Pasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for complete permit applications after 7/1/2025. Same per-unit rate for single-family and multifamily. The county land development code (Sec. 1302.6) names Dade City for imposition of this fee with no interlocal-agreement condition.
    $674.00
  • Library Impact Fee (Pasco County, collected by Dade City) (MF)
    Pasco County
    Pasco County Library Impact Fee, $144.58 per single-family detached dwelling (Land $15.06 + Facilities $129.52); multifamily and mobile homes pay $96.58. Collected by the City of Dade City on the county's behalf. The county is one unified library-fee district.
    $96.58
Total (Dade City): $18,206.73
Sources last checked Official fee schedules:City of Dade City District School Board of Pasco County Pasco County Pasco County Fire Rescue
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dade City: Commercial Impact Fees

Commercial development in Dade City pays $1.05 per square foot in impact fees, plus $19,814.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $72,253.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater System Development Charge (Dade City) — 1" meter ($14,527.00 one-time), Water System Development Charge (Dade City) — 1" meter ($5,287.00 one-time) and Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Commercial) ($0.59/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Multi-Modal Transportation Impact Fee (Dade City, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dade City Impact Fee Schedule
Water$5,287.00 one-time
  • Water System Development Charge (Dade City) — 1" meter
    City of Dade City
    Dade City nonresidential water system development charge by meter size (ERU-based, $2,115 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
    $5,287.00 one-time
Sewer$14,527.00 one-time
City$0.46/sq ft
  • Public Safety Impact Fee (Dade City, Commercial)
    City of Dade City
    City of Dade City public safety impact fee for retail and commercial construction: $462.78 per 1,000 sq ft (Code Sec. 2-452(b), Ord. 2021-14), on construction valued at $5,000 or more, payable at the certificate of occupancy or final power release. The code provides for an inflation adjustment every four years. Dade City's multi-modal transportation fee is listed separately; its park fee applies to residential units only.
    $0.46/sq ft
  • Multi-Modal Transportation Impact Fee (Dade City, Commercial)
    City of Dade City
    Dade City levies a multi-modal transportation impact fee on new development citywide (Code Secs. 2-471 to 2-490, Ord. 2016-01). The per-1,000-sq-ft rates are set in a separately adopted fee schedule that the city does not publish online.
    Requires confirmation
County$0.59/sq ft
  • Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Commercial)
    Pasco County
    Pasco County Fire Combat and Rescue Service impact fee, collected inside Dade City: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation.
    $0.59/sq ft
  • Mobility Fee (Pasco County, in Dade City, Commercial)
    Pasco County
    Pasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Dade City charges its own multi-modal transportation fee, and its code bars other county-imposed development fees except school fees and fees under an interlocal agreement, so no county mobility fee is charged here.
    $0.00
Total (Dade City): $1.05/sq ft + $19,814.00 one-time (≈ $72,253.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Dade City Pasco County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dade City: Industrial Impact Fees

Industrial development in Dade City pays $0.66 per square foot in impact fees, plus $19,814.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $52,933.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater System Development Charge (Dade City) — 1" meter ($14,527.00 one-time), Water System Development Charge (Dade City) — 1" meter ($5,287.00 one-time) and Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Industrial) ($0.59/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Multi-Modal Transportation Impact Fee (Dade City, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dade City Impact Fee Schedule
Water$5,287.00 one-time
  • Water System Development Charge (Dade City) — 1" meter
    City of Dade City
    Dade City nonresidential water system development charge by meter size (ERU-based, $2,115 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
    $5,287.00 one-time
Sewer$14,527.00 one-time
City$0.08/sq ft
  • Public Safety Impact Fee (Dade City, Industrial)
    City of Dade City
    City of Dade City public safety impact fee for industrial construction: $76.38 per 1,000 sq ft (Code Sec. 2-452(b), Ord. 2021-14); warehouses pay $44.93. Applies to construction valued at $5,000 or more, payable at the certificate of occupancy or final power release. The code provides for an inflation adjustment every four years.
    $0.08/sq ft
  • Multi-Modal Transportation Impact Fee (Dade City, Industrial)
    City of Dade City
    Dade City levies a multi-modal transportation impact fee on new development citywide (Code Secs. 2-471 to 2-490, Ord. 2016-01). The per-1,000-sq-ft rates are set in a separately adopted fee schedule that the city does not publish online.
    Requires confirmation
County$0.59/sq ft
  • Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Industrial)
    Pasco County
    Pasco County Fire Combat and Rescue Service impact fee, collected inside Dade City: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation.
    $0.59/sq ft
  • Mobility Fee (Pasco County, in Dade City, Industrial)
    Pasco County
    Pasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Dade City charges its own multi-modal transportation fee, and its code bars other county-imposed development fees except school fees and fees under an interlocal agreement, so no county mobility fee is charged here.
    $0.00
Total (Dade City): $0.66/sq ft + $19,814.00 one-time (≈ $52,933.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Dade City Pasco County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dade City: Office Impact Fees

Office development in Dade City pays $0.81 per square foot in impact fees, plus $19,814.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to at least $39,968.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater System Development Charge (Dade City) — 1" meter ($14,527.00 one-time), Water System Development Charge (Dade City) — 1" meter ($5,287.00 one-time) and Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Office) ($0.59/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Multi-Modal Transportation Impact Fee (Dade City, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dade City Impact Fee Schedule
Water$5,287.00 one-time
  • Water System Development Charge (Dade City) — 1" meter
    City of Dade City
    Dade City nonresidential water system development charge by meter size (ERU-based, $2,115 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
    $5,287.00 one-time
Sewer$14,527.00 one-time
City$0.22/sq ft
  • Public Safety Impact Fee (Dade City, Office)
    City of Dade City
    City of Dade City public safety impact fee for office construction: $220.16 per 1,000 sq ft (Code Sec. 2-452(b), Ord. 2021-14), on construction valued at $5,000 or more, payable at the certificate of occupancy or final power release. The code provides for an inflation adjustment every four years. Dade City's multi-modal transportation fee is listed separately; its park fee applies to residential units only.
    $0.22/sq ft
  • Multi-Modal Transportation Impact Fee (Dade City, Office)
    City of Dade City
    Dade City levies a multi-modal transportation impact fee on new development citywide (Code Secs. 2-471 to 2-490, Ord. 2016-01). The per-1,000-sq-ft rates are set in a separately adopted fee schedule that the city does not publish online.
    Requires confirmation
County$0.59/sq ft
  • Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Office)
    Pasco County
    Pasco County Fire Combat and Rescue Service impact fee, collected inside Dade City: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation.
    $0.59/sq ft
  • Mobility Fee (Pasco County, in Dade City, Office)
    Pasco County
    Pasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Dade City charges its own multi-modal transportation fee, and its code bars other county-imposed development fees except school fees and fees under an interlocal agreement, so no county mobility fee is charged here.
    $0.00
Total (Dade City): $0.81/sq ft + $19,814.00 one-time (≈ $39,968.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Dade City Pasco County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dade City Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Dade City Impact Fee FAQs

What are the total impact fees for a single-family home in Dade City, Florida?

A new single-family home in Dade City pays at least $23,072.03 per unit in combined impact fees (rates sourced October 27, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Dade City?

Commercial development in Dade City pays $1.05 per square foot in impact fees, plus $19,814.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $72,253.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Dade City charge its own impact fees?

Yes. Dade City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Dade City, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pasco County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000