Dade City Impact Fees by Project Type
Dade City: Single-Family Impact Fees
A new single-family home in Dade City pays at least $26,756.03 per unit in impact fees (rates sourced November 16, 2026). Of that, Pasco County-levied fees account for $14,596.73 and municipal or utility fees for $12,159.30.
The largest line items are School Impact Fee (Pasco County - Single-Family Detached) ($10,328.00), Wastewater System Development Charge (Dade City) — 5/8"-3/4" meter ($5,811.00) and Parks & Recreation Impact Fee (Pasco County, collected by Dade City) ($3,450.15).
Multi-Modal Transportation Impact Fee (City of Dade City) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Charge (Dade City) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Dade City Impact Fee Schedule
- Water System Development Charge (Dade City) — 5/8"-3/4" meter$2,115.00City of Dade City Public UtilitiesCity of Dade City water system development charge, $2,115 per single-family connection (1.0 ERU, 5/8"–3/4" meter). Larger meters pay a higher charge by meter size.
- Water Connection Charge (Dade City)Requires confirmationCity of Dade CityCity of Dade City charges a water connection charge for the service line, tap and meter installation on new water service inside city limits (Code Sec. 98-49(a), Table C), in addition to the water system development charge. The applicable amount for a standard 5/8 to 3/4 inch meter is either $350 (combined connection charge) or $631 (meter installation $288 plus tap fee $343).
- Wastewater System Development Charge (Dade City) — 5/8"-3/4" meter$5,811.00City of Dade City Public UtilitiesCity of Dade City wastewater system development charge, $5,811 per single-family connection (1.0 ERU, 5/8"–3/4" meter). Larger meters pay a higher charge by meter size.
- Sewer Connection Charge (Dade City) — 5/8"-3/4" meter$456.00City of Dade CityCity of Dade City sewer connection charge inside city limits, covering a four-inch service line and the connection to the sewer main (Code Sec. 98-95, Table C): $456 for a 5/8 to 3/4 inch meter, $608 for a 1 inch meter, actual cost above 1 inch. Outside city limits: $570 and $760. Paid before connection, in addition to the wastewater system development charge.
- Multi-Modal Transportation Impact Fee (City of Dade City)$3,228.00Requires confirmationCity of Dade CityDade City multi-modal transportation impact fee: $3,228 per single-family home (standard rate from the schedule adopted with Ordinance 2016-01). Developments meeting the city's mixed-use criteria pay a reduced rate ($2,421). Collected by the city in place of the county mobility fee.
- Public Safety Impact Fee (City of Dade City)$449.30City of Dade CityThe City of Dade City charges a public safety impact fee of $449.30 per new single-family home. Under Ordinance 2026-21 it rises to $468.75 on 12/28/2026 and $488.21 on 12/28/2027.
- Park & Recreation Fee (City of Dade City)$100.00City of Dade CityThe City of Dade City charges a city park and recreation fee of $100 per new dwelling unit, in addition to the county parks fee.
- School Impact Fee (Pasco County - Single-Family Detached)$10,328.00District School Board of Pasco CountyPasco County School Impact Fee, $10,328 per single-family detached dwelling (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district and is collected within the city. Four-year phase-in: $9,328 (2025), $10,328 (2026), $11,328 (2027), $12,328 (2028). Multifamily units pay $5,636.50.
- Parks & Recreation Impact Fee (Pasco County, collected by Dade City)$3,450.15Pasco CountyPasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit, collected by the City of Dade City on the county's behalf. One flat rate for single-family, multifamily and mobile homes; in effect for complete permit applications after 12/31/2023.
- Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City)$674.00Pasco County Fire RescuePasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for complete permit applications after 7/1/2025. Same per-unit rate for single-family and multifamily. The county land development code (Sec. 1302.6) names Dade City for imposition of this fee with no interlocal-agreement condition.
- Library Impact Fee (Pasco County, collected by Dade City)$144.58Pasco CountyPasco County Library Impact Fee, $144.58 per single-family detached dwelling (Land $15.06 + Facilities $129.52); multifamily and mobile homes pay $96.58. Collected by the City of Dade City on the county's behalf. The county is one unified library-fee district.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Dade City: Multifamily Impact Fees
A new multifamily unit in Dade City pays at least $20,917.73 per unit in impact fees (rates sourced November 16, 2026). Of that, Pasco County-levied fees account for $9,857.23 and municipal or utility fees for $11,060.50.
The largest line items are Wastewater System Development Charge (Dade City, MF) — 5/8"-3/4" meter ($5,811.00), School Impact Fee (Pasco County) (MF) ($5,636.50) and Parks & Recreation Impact Fee (Pasco County, collected by Dade City) (MF) ($3,450.15).
Multi-Modal Transportation Impact Fee (City of Dade City, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Charge (Dade City, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Dade City Impact Fee Schedule
- Water System Development Charge (Dade City, MF) — 5/8"-3/4" meter$2,115.00City of Dade CityDade City water system development charge, $2,115 per unit (1.0 ERU, 5/8 or 3/4 inch meter). Each dwelling unit is normally a separate service with its own meter; for a building of five or more units the city may allow a master meter, which is charged by meter size (1 inch 2.5 ERU, 2 inch 8 ERU, 4 inch 25 ERU, and so on). Payable before the building permit is issued.
- Water Connection Charge (Dade City, MF)Requires confirmationCity of Dade CityCity of Dade City charges a water connection charge for the service line, tap and meter installation on new water service inside city limits (Code Sec. 98-49(a), Table C), in addition to the water system development charge. The applicable amount for a standard 5/8 to 3/4 inch meter is either $350 (combined connection charge) or $631 (meter installation $288 plus tap fee $343).
- Wastewater System Development Charge (Dade City, MF) — 5/8"-3/4" meter$5,811.00City of Dade CityDade City wastewater system development charge, $5,811 per unit (1.0 ERU, about 270 gallons per day). Each dwelling unit is normally a separate service; for a building of five or more units the city may allow a master meter, which is charged by meter size (1 inch 2.5 ERU, 2 inch 8 ERU, 4 inch 25 ERU, and so on). Payable before the building permit is issued.
- Sewer Connection Charge (Dade City, MF) — 5/8"-3/4" meter$456.00City of Dade CityCity of Dade City sewer connection charge inside city limits, covering a four-inch service line and the connection to the sewer main (Code Sec. 98-95, Table C): $456 for a 5/8 to 3/4 inch meter, $608 for a 1 inch meter, actual cost above 1 inch. Outside city limits: $570 and $760. Paid before connection, in addition to the wastewater system development charge.
- Multi-Modal Transportation Impact Fee (City of Dade City, MF)$2,255.00Requires confirmationCity of Dade CityDade City multi-modal transportation impact fee: $2,255 per multifamily apartment unit (standard rate from the schedule adopted with Ordinance 2016-01). Developments meeting the city's mixed-use criteria pay a reduced rate ($1,691). Collected by the city in place of the county mobility fee.
- Public Safety Impact Fee (City of Dade City, MF)$323.50City of Dade CityThe City of Dade City charges a public safety impact fee of $323.50 per new multifamily unit. Under Ordinance 2026-21 it rises to $337.51 on 12/28/2026 and $352.12 on 12/28/2027.
- Park & Recreation Fee (City of Dade City, MF)$100.00City of Dade CityThe City of Dade City charges a city park and recreation fee of $100 per new dwelling unit, in addition to the county parks fee.
- School Impact Fee (Pasco County) (MF)$5,636.50District School Board of Pasco CountyPasco County School Impact Fee, $5,636.50 per multifamily unit (complete permit applications on/after 1/1/2026; covers apartments, condos, townhomes, duplexes and ADUs). Applies countywide (incorporated and unincorporated) and is collected within the city. Four-year phase-in: $5,260.25 (2025), $5,636.50 (2026), $6,012.75 (from 1/1/2027), $6,389 (from 1/1/2028).
- Parks & Recreation Impact Fee (Pasco County, collected by Dade City) (MF)$3,450.15Pasco CountyPasco County Parks & Recreation Impact Fee, $3,450.15 per dwelling unit, collected by the City of Dade City on the county's behalf. One flat rate for single-family, multifamily and mobile homes; in effect for complete permit applications after 12/31/2023.
- Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City) (MF)$674.00Pasco County Fire RescuePasco County Fire Combat & Rescue Service Impact Fee, $674 per dwelling unit (Fire Combat $416 + Rescue Service $258), for complete permit applications after 7/1/2025. Same per-unit rate for single-family and multifamily. The county land development code (Sec. 1302.6) names Dade City for imposition of this fee with no interlocal-agreement condition.
- Library Impact Fee (Pasco County, collected by Dade City) (MF)$96.58Pasco CountyPasco County Library Impact Fee, $144.58 per single-family detached dwelling (Land $15.06 + Facilities $129.52); multifamily and mobile homes pay $96.58. Collected by the City of Dade City on the county's behalf. The county is one unified library-fee district.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Dade City: Commercial Impact Fees
Commercial development in Dade City pays $5.96 per square foot in impact fees, plus $20,422.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $318,361.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Development Charge (Dade City) — 1" meter ($14,527.00 one-time), Water System Development Charge (Dade City) — 1" meter ($5,287.00 one-time) and Sewer Connection Charge (Dade City) — 1" meter ($608.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Multi-Modal Transportation Impact Fee (Dade City, Commercial) — 10,000 to 50,000 sq ft is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Charge (Dade City) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Dade City Impact Fee Schedule
- Water System Development Charge (Dade City) — 1" meter$5,287.00 one-timeCity of Dade CityDade City nonresidential water system development charge by meter size (ERU-based, $2,115 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
- Water Connection Charge (Dade City)Requires confirmationCity of Dade CityCity of Dade City charges a water connection charge for the service line, tap and meter installation on new water service inside city limits (Code Sec. 98-49(a), Table C), in addition to the water system development charge. For a 1 inch meter the applicable amount is either $515 (combined connection charge) or $712 (meter installation $342 plus tap fee $370); meters over 1 inch are priced at actual cost.
- Wastewater System Development Charge (Dade City) — 1" meter$14,527.00 one-timeCity of Dade CityDade City nonresidential wastewater system development charge by meter size (ERU-based, $5,811 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
- Sewer Connection Charge (Dade City) — 1" meter$608.00 one-timeCity of Dade CityCity of Dade City sewer connection charge inside city limits, covering a four-inch service line and the connection to the sewer main (Code Sec. 98-95, Table C): $456 for a 5/8 to 3/4 inch meter, $608 for a 1 inch meter, actual cost above 1 inch. Outside city limits: $570 and $760. Paid before connection, in addition to the wastewater system development charge.
- Multi-Modal Transportation Impact Fee (Dade City, Commercial) — 10,000 to 50,000 sq ft$4.91/sq ftRequires confirmationCity of Dade CityDade City multi-modal transportation impact fee for retail and commercial buildings (schedule adopted with Ordinance 2016-01), per 1,000 sq ft, standard rate; qualifying mixed-use developments pay a reduced rate. Collected by the city in place of the county mobility fee. Community retail of 10,000 to 50,000 sq ft pays $4,910 (mixed-use $3,682); under 10,000 sq ft $2,323; over 50,000 sq ft $8,489.
- Public Safety Impact Fee (Dade City, Commercial)$0.46/sq ftCity of Dade CityCity of Dade City public safety impact fee for retail and commercial construction: $462.78 per 1,000 sq ft (Code Sec. 2-452(b)), on construction valued at $5,000 or more, payable at the certificate of occupancy or final power release. Under Ordinance 2026-21 it rises to $482.82 on 12/28/2026 and $502.86 on 12/28/2027. Dade City's multi-modal transportation fee is listed separately.
- Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Commercial)$0.59/sq ftPasco CountyPasco County Fire Combat and Rescue Service impact fee, collected inside Dade City: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation.
- Mobility Fee (Pasco County, in Dade City, Commercial)$0.00Pasco CountyPasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Dade City charges its own multi-modal transportation fee, and its code bars other county-imposed development fees except school fees and fees under an interlocal agreement, so no county mobility fee is charged here.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Dade City: Industrial Impact Fees
Industrial development in Dade City pays $1.75 per square foot in impact fees, plus $20,422.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $107,841.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Development Charge (Dade City) — 1" meter ($14,527.00 one-time), Water System Development Charge (Dade City) — 1" meter ($5,287.00 one-time) and Sewer Connection Charge (Dade City) — 1" meter ($608.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Multi-Modal Transportation Impact Fee (Dade City, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Charge (Dade City) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Dade City Impact Fee Schedule
- Water System Development Charge (Dade City) — 1" meter$5,287.00 one-timeCity of Dade CityDade City nonresidential water system development charge by meter size (ERU-based, $2,115 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
- Water Connection Charge (Dade City)Requires confirmationCity of Dade CityCity of Dade City charges a water connection charge for the service line, tap and meter installation on new water service inside city limits (Code Sec. 98-49(a), Table C), in addition to the water system development charge. For a 1 inch meter the applicable amount is either $515 (combined connection charge) or $712 (meter installation $342 plus tap fee $370); meters over 1 inch are priced at actual cost.
- Wastewater System Development Charge (Dade City) — 1" meter$14,527.00 one-timeCity of Dade CityDade City nonresidential wastewater system development charge by meter size (ERU-based, $5,811 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
- Sewer Connection Charge (Dade City) — 1" meter$608.00 one-timeCity of Dade CityCity of Dade City sewer connection charge inside city limits, covering a four-inch service line and the connection to the sewer main (Code Sec. 98-95, Table C): $456 for a 5/8 to 3/4 inch meter, $608 for a 1 inch meter, actual cost above 1 inch. Outside city limits: $570 and $760. Paid before connection, in addition to the wastewater system development charge.
- Multi-Modal Transportation Impact Fee (Dade City, Industrial)$1.09/sq ftRequires confirmationCity of Dade CityDade City multi-modal transportation impact fee for warehousing, manufacturing and industrial buildings (schedule adopted with Ordinance 2016-01), per 1,000 sq ft, standard rate; qualifying mixed-use developments pay a reduced rate. Collected by the city in place of the county mobility fee. Rate: $1,086 (mixed-use $815).
- Public Safety Impact Fee (Dade City, Industrial)$0.08/sq ftCity of Dade CityCity of Dade City public safety impact fee for industrial construction: $76.38 per 1,000 sq ft (Code Sec. 2-452(b)), on construction valued at $5,000 or more, payable at the certificate of occupancy or final power release. Under Ordinance 2026-21 it rises to $79.69 on 12/28/2026 and $82.99 on 12/28/2027. Dade City's multi-modal transportation fee is listed separately.
- Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Industrial)$0.59/sq ftPasco CountyPasco County Fire Combat and Rescue Service impact fee, collected inside Dade City: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation.
- Mobility Fee (Pasco County, in Dade City, Industrial)$0.00Pasco CountyPasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Dade City charges its own multi-modal transportation fee, and its code bars other county-imposed development fees except school fees and fees under an interlocal agreement, so no county mobility fee is charged here.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Dade City: Office Impact Fees
Office development in Dade City pays $4.11 per square foot in impact fees, plus $20,422.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 25,000 sq ft building, that comes to at least $123,176.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Development Charge (Dade City) — 1" meter ($14,527.00 one-time), Water System Development Charge (Dade City) — 1" meter ($5,287.00 one-time) and Sewer Connection Charge (Dade City) — 1" meter ($608.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Multi-Modal Transportation Impact Fee (Dade City, Office) — 20,000 sq ft or more is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Charge (Dade City) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Dade City Impact Fee Schedule
- Water System Development Charge (Dade City) — 1" meter$5,287.00 one-timeCity of Dade CityDade City nonresidential water system development charge by meter size (ERU-based, $2,115 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
- Water Connection Charge (Dade City)Requires confirmationCity of Dade CityCity of Dade City charges a water connection charge for the service line, tap and meter installation on new water service inside city limits (Code Sec. 98-49(a), Table C), in addition to the water system development charge. For a 1 inch meter the applicable amount is either $515 (combined connection charge) or $712 (meter installation $342 plus tap fee $370); meters over 1 inch are priced at actual cost.
- Wastewater System Development Charge (Dade City) — 1" meter$14,527.00 one-timeCity of Dade CityDade City nonresidential wastewater system development charge by meter size (ERU-based, $5,811 per ERU), Code Ch. 98. One meter-ERU ladder applies to all customer classes; payable before building permit.
- Sewer Connection Charge (Dade City) — 1" meter$608.00 one-timeCity of Dade CityCity of Dade City sewer connection charge inside city limits, covering a four-inch service line and the connection to the sewer main (Code Sec. 98-95, Table C): $456 for a 5/8 to 3/4 inch meter, $608 for a 1 inch meter, actual cost above 1 inch. Outside city limits: $570 and $760. Paid before connection, in addition to the wastewater system development charge.
- Multi-Modal Transportation Impact Fee (Dade City, Office) — 20,000 sq ft or more$3.30/sq ftRequires confirmationCity of Dade CityDade City multi-modal transportation impact fee for office buildings (schedule adopted with Ordinance 2016-01), per 1,000 sq ft, standard rate; qualifying mixed-use developments pay a reduced rate. Collected by the city in place of the county mobility fee. Offices of 20,000 sq ft or more pay $3,304 (mixed-use $2,478); under 20,000 sq ft $2,085.
- Public Safety Impact Fee (Dade City, Office)$0.22/sq ftCity of Dade CityCity of Dade City public safety impact fee for office construction: $220.16 per 1,000 sq ft (Code Sec. 2-452(b)), on construction valued at $5,000 or more, payable at the certificate of occupancy or final power release. Under Ordinance 2026-21 it rises to $229.69 on 12/28/2026 and $239.64 on 12/28/2027. Dade City's multi-modal transportation fee is listed separately.
- Fire Combat & Rescue Service Impact Fee (Pasco County, collected by Dade City, Office)$0.59/sq ftPasco CountyPasco County Fire Combat and Rescue Service impact fee, collected inside Dade City: $586 per 1,000 sq ft of gross floor area (Fire Combat $362 + Rescue Service $224) for complete building permit applications after 7/1/2025. One rate for all nonresidential uses; gross floor area is capped at 50,000 sq ft per building for the calculation.
- Mobility Fee (Pasco County, in Dade City, Office)$0.00Pasco CountyPasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Dade City charges its own multi-modal transportation fee, and its code bars other county-imposed development fees except school fees and fees under an interlocal agreement, so no county mobility fee is charged here.
Where in Pasco County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Dade City Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.
Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Dade City Impact Fee FAQs
What are the total impact fees for a single-family home in Dade City, Florida?
A new single-family home in Dade City pays at least $26,756.03 per unit in combined impact fees (rates sourced November 16, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Dade City?
Commercial development in Dade City pays $5.96 per square foot in impact fees, plus $20,422.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $318,361.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Dade City charge its own impact fees?
Yes. Dade City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Dade City, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.