New Port Richey, Florida Impact Fees

New Port Richey applies its own fee schedule: municipal fees plus the Pasco County-levied fees that apply inside city limits. Combined, a new single-family home pays $13,748.00 per unit (rates sourced ). The full breakdown is below.

New Port Richey Impact Fees by Project Type

New Port Richey: Single-Family Impact Fees

A new single-family home in New Port Richey pays $13,748.00 per unit in impact fees (rates sourced October 27, 2026). Of that, Pasco County-levied fees account for $10,328.00 and municipal or utility fees for $3,420.00.

The largest line items are School Impact Fee (Pasco County - Single-Family Detached) ($10,328.00), Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey) ($2,262.00) and Water Connection / Capacity Fee (City of New Port Richey) ($1,158.00).

View the Full New Port Richey Impact Fee Schedule
Water$1,158.00
Sewer$2,262.00
City$0.00
  • City Municipal Impact Fee (New Port Richey)
    City of New Port Richey
    New Port Richey does not charge municipal impact fees for parks, police, fire, or transportation; the city code expressly bars transportation impact fees inside the city. Only utility connection charges and applicable county fees apply.
    $0.00
County$10,328.00
  • School Impact Fee (Pasco County - Single-Family Detached)
    District School Board of Pasco County
    Pasco County School Impact Fee, $10,328 per single-family detached dwelling (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district and is collected within the city. Four-year phase-in: $9,328 (2025), $10,328 (2026), $11,328 (2027), $12,328 (2028). Multifamily units pay $5,636.50.
    $10,328.00
  • Parks & Recreation Impact Fee (Pasco County, in New Port Richey)
    Pasco County
    Pasco County's parks and recreation impact fee applies only in cities that have opted to collect it. This city has not, so the county parks fee is not charged here.
    $0.00
  • Rescue Service Impact Fee (Pasco County, in New Port Richey)
    Pasco County Fire Rescue
    The Pasco County fire/rescue impact fee is not collected in New Port Richey; the city's adopted fee schedule includes only its own water and sewer development fees and the county school fee, so $0 applies here. The city operates its own fire department.
    $0.00
  • Library Impact Fee (Pasco County, in New Port Richey)
    Pasco County
    Pasco County's library impact fee is charged inside a city only when the county and the city have signed a collection agreement. No such agreement is in place here, so this fee does not apply.
    $0.00
Total (New Port Richey): $13,748.00

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

New Port Richey: Multifamily Impact Fees

A new multifamily unit in New Port Richey pays $9,056.50 per unit in impact fees (rates sourced October 27, 2026). Of that, Pasco County-levied fees account for $5,636.50 and municipal or utility fees for $3,420.00.

The largest line items are School Impact Fee (Pasco County) (MF) ($5,636.50), Wastewater (Sewer) Connection / Capacity Fee (New Port Richey) (MF) ($2,262.00) and Water Connection / Capacity Fee (City of New Port Richey) (MF) ($1,158.00).

View the Full New Port Richey Impact Fee Schedule
Water$1,158.00
Sewer$2,262.00
City$0.00
  • City Municipal Impact Fee (New Port Richey) (MF)
    City of New Port Richey
    New Port Richey does not charge municipal impact fees for parks, police, fire, or transportation; the city code expressly bars transportation impact fees inside the city. Only utility connection charges and applicable county fees apply.
    $0.00
County$5,636.50
  • School Impact Fee (Pasco County) (MF)
    District School Board of Pasco County
    Pasco County School Impact Fee, $5,636.50 per multifamily unit (complete permit applications on/after 1/1/2026; covers apartments, condos, townhomes, duplexes and ADUs). Applies countywide (incorporated and unincorporated) and is collected within the city. Four-year phase-in: $5,260.25 (2025), $5,636.50 (2026), $6,012.75 (from 1/1/2027), $6,389 (from 1/1/2028).
    $5,636.50
  • Library Impact Fee (Pasco County, in New Port Richey) (MF)
    Pasco County
    Pasco County's library impact fee is charged inside a city only when the county and the city have signed a collection agreement. No such agreement is in place here, so this fee does not apply.
    $0.00
  • Rescue Service Impact Fee (Pasco County, in New Port Richey) (MF)
    Pasco County Fire Rescue
    The Pasco County fire/rescue impact fee is not collected in New Port Richey; the city's adopted fee schedule includes only its own water and sewer development fees and the county school fee, so $0 applies here. The city operates its own fire department.
    $0.00
  • Parks & Recreation Impact Fee (Pasco County, in New Port Richey) (MF)
    Pasco County
    Pasco County's parks and recreation impact fee applies only in cities that have opted to collect it. This city has not, so the county parks fee is not charged here.
    $0.00
Total (New Port Richey): $9,056.50

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

New Port Richey: Commercial Impact Fees

Commercial development in New Port Richey pays no per-square-foot impact fees, but owes $3,640.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $3,640.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey) ($2,262.00 one-time) and Water Connection / Capacity Fee (City of New Port Richey) ($1,158.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Installation Charge (City of New Port Richey) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full New Port Richey Impact Fee Schedule
Water$1,378.00 one-time
  • Water Connection / Capacity Fee (City of New Port Richey)
    City of New Port Richey
    New Port Richey water development impact fee: $1,158 per equivalent residential unit (ERU). Nonresidential buildings are converted to ERUs by plumbing fixture count, one ERU for each 12 fixture units or part of 12, so the minimum is $1,158; a building with 30 fixture units pays 3 ERUs. Meter installation is charged separately.
    $1,158.00 one-time
  • Water Meter Installation Charge (City of New Port Richey) — 1" meter
    City of New Port Richey
    City of New Port Richey water meter installation charge inside city limits, by meter size, paid in addition to the water and sewer development fees. The codified schedule (Code Sec. 24-27(a)) lists $150 for a 5/8 or 3/4 inch meter, $220 for 1 inch, $345 for 1.5 inch, $460 for 2 inch, $2,205 for 3 inch, $2,835 for 4 inch, $5,285 for 6 inch and $7,245 for 8 inch; the city adjusted its meter installation fees effective 10/1/2026 (Ordinance 2026-2373) and has not published the new amounts.
    $220.00 one-timeRequires confirmation
Sewer$2,262.00 one-time
  • Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey)
    City of New Port Richey
    New Port Richey sewer development impact fee: $2,262 per equivalent residential unit (ERU). Nonresidential buildings are converted to ERUs by plumbing fixture count, one ERU for each 12 fixture units or part of 12, so the minimum is $2,262; a building with 30 fixture units pays 3 ERUs.
    $2,262.00 one-time
City$0.00
  • Municipal Impact Fee (New Port Richey, Commercial)
    City of New Port Richey
    New Port Richey does not charge municipal impact fees for transportation, parks, police, fire or general government on nonresidential development. City code requires a separate city ordinance for any impact fee in the city and bars transportation impact fees outright. The city's water and sewer development fees are listed separately.
    $0.00
County$0.00
Total (New Port Richey): $3,640.00 one-time (≈ $3,640.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of New Port Richey Pasco County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

New Port Richey: Industrial Impact Fees

Industrial development in New Port Richey pays no per-square-foot impact fees, but owes $3,640.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $3,640.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey) ($2,262.00 one-time) and Water Connection / Capacity Fee (City of New Port Richey) ($1,158.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Installation Charge (City of New Port Richey) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full New Port Richey Impact Fee Schedule
Water$1,378.00 one-time
  • Water Connection / Capacity Fee (City of New Port Richey)
    City of New Port Richey
    New Port Richey water development impact fee: $1,158 per equivalent residential unit (ERU). Nonresidential buildings are converted to ERUs by plumbing fixture count, one ERU for each 12 fixture units or part of 12, so the minimum is $1,158; a building with 30 fixture units pays 3 ERUs. Meter installation is charged separately.
    $1,158.00 one-time
  • Water Meter Installation Charge (City of New Port Richey) — 1" meter
    City of New Port Richey
    City of New Port Richey water meter installation charge inside city limits, by meter size, paid in addition to the water and sewer development fees. The codified schedule (Code Sec. 24-27(a)) lists $150 for a 5/8 or 3/4 inch meter, $220 for 1 inch, $345 for 1.5 inch, $460 for 2 inch, $2,205 for 3 inch, $2,835 for 4 inch, $5,285 for 6 inch and $7,245 for 8 inch; the city adjusted its meter installation fees effective 10/1/2026 (Ordinance 2026-2373) and has not published the new amounts.
    $220.00 one-timeRequires confirmation
Sewer$2,262.00 one-time
  • Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey)
    City of New Port Richey
    New Port Richey sewer development impact fee: $2,262 per equivalent residential unit (ERU). Nonresidential buildings are converted to ERUs by plumbing fixture count, one ERU for each 12 fixture units or part of 12, so the minimum is $2,262; a building with 30 fixture units pays 3 ERUs.
    $2,262.00 one-time
City$0.00
  • Municipal Impact Fee (New Port Richey, Industrial)
    City of New Port Richey
    New Port Richey does not charge municipal impact fees for transportation, parks, police, fire or general government on nonresidential development. City code requires a separate city ordinance for any impact fee in the city and bars transportation impact fees outright. The city's water and sewer development fees are listed separately.
    $0.00
County$0.00
Total (New Port Richey): $3,640.00 one-time (≈ $3,640.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of New Port Richey Pasco County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

New Port Richey: Office Impact Fees

Office development in New Port Richey pays no per-square-foot impact fees, but owes $3,640.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $3,640.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey) ($2,262.00 one-time) and Water Connection / Capacity Fee (City of New Port Richey) ($1,158.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter Installation Charge (City of New Port Richey) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full New Port Richey Impact Fee Schedule
Water$1,378.00 one-time
  • Water Connection / Capacity Fee (City of New Port Richey)
    City of New Port Richey
    New Port Richey water development impact fee: $1,158 per equivalent residential unit (ERU). Nonresidential buildings are converted to ERUs by plumbing fixture count, one ERU for each 12 fixture units or part of 12, so the minimum is $1,158; a building with 30 fixture units pays 3 ERUs. Meter installation is charged separately.
    $1,158.00 one-time
  • Water Meter Installation Charge (City of New Port Richey) — 1" meter
    City of New Port Richey
    City of New Port Richey water meter installation charge inside city limits, by meter size, paid in addition to the water and sewer development fees. The codified schedule (Code Sec. 24-27(a)) lists $150 for a 5/8 or 3/4 inch meter, $220 for 1 inch, $345 for 1.5 inch, $460 for 2 inch, $2,205 for 3 inch, $2,835 for 4 inch, $5,285 for 6 inch and $7,245 for 8 inch; the city adjusted its meter installation fees effective 10/1/2026 (Ordinance 2026-2373) and has not published the new amounts.
    $220.00 one-timeRequires confirmation
Sewer$2,262.00 one-time
  • Wastewater (Sewer) Connection / Capacity Fee (City of New Port Richey)
    City of New Port Richey
    New Port Richey sewer development impact fee: $2,262 per equivalent residential unit (ERU). Nonresidential buildings are converted to ERUs by plumbing fixture count, one ERU for each 12 fixture units or part of 12, so the minimum is $2,262; a building with 30 fixture units pays 3 ERUs.
    $2,262.00 one-time
City$0.00
  • Municipal Impact Fee (New Port Richey, Office)
    City of New Port Richey
    New Port Richey does not charge municipal impact fees for transportation, parks, police, fire or general government on nonresidential development. City code requires a separate city ordinance for any impact fee in the city and bars transportation impact fees outright. The city's water and sewer development fees are listed separately.
    $0.00
County$0.00
Total (New Port Richey): $3,640.00 one-time (≈ $3,640.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of New Port Richey Pasco County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

New Port Richey Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

New Port Richey Impact Fee FAQs

What are the total impact fees for a single-family home in New Port Richey, Florida?

A new single-family home in New Port Richey pays $13,748.00 per unit in combined impact fees (rates sourced October 27, 2026).

How much are commercial impact fees in New Port Richey?

Commercial development in New Port Richey pays no per-square-foot impact fees, but owes $3,640.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does New Port Richey charge its own impact fees?

Yes. New Port Richey levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in New Port Richey, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pasco County impact fees page.