Port Richey, Florida Impact Fees

Port Richey applies its own fee schedule: municipal fees plus the Pasco County-levied fees that apply inside city limits. Combined, a new single-family home pays $15,337.00 per unit (rates sourced ). The full breakdown is below.

Port Richey Impact Fees by Project Type

Port Richey: Single-Family Impact Fees

A new single-family home in Port Richey pays $15,337.00 per unit in impact fees (rates sourced November 16, 2026). Of that, Pasco County-levied fees account for $10,328.00 and municipal or utility fees for $5,009.00.

The largest line items are School Impact Fee (Pasco County - Single-Family Detached) ($10,328.00), Wastewater (Sewer) Connection / Capacity Fee (City of Port Richey) ($1,600.00) and Water Connection / Capacity Fee (City of Port Richey) ($1,300.00).

View the Full Port Richey Impact Fee Schedule
Water$1,300.00
Sewer$1,600.00
City$2,109.00
County$10,328.00
  • School Impact Fee (Pasco County - Single-Family Detached)
    District School Board of Pasco County
    Pasco County School Impact Fee, $10,328 per single-family detached dwelling (rate for complete permit applications on/after 1/1/2026). Applies countywide (incorporated and unincorporated) as one district and is collected within the city. Four-year phase-in: $9,328 (2025), $10,328 (2026), $11,328 (2027), $12,328 (2028). Multifamily units pay $5,636.50.
    $10,328.00
  • Library Impact Fee (Pasco County, in Port Richey)
    Pasco County
    Pasco County's library impact fee is charged inside a city only when the county and the city have signed a collection agreement. No such agreement is in place here, so this fee does not apply.
    $0.00
  • Parks & Recreation Impact Fee (Pasco County, in Port Richey)
    Pasco County
    Pasco County's parks and recreation impact fee applies only in cities that have opted to collect it. This city has not, so the county parks fee is not charged here.
    $0.00
  • Rescue Service Impact Fee (Pasco County, in Port Richey)
    Pasco County Fire Rescue
    The Pasco County fire/rescue impact fee is not collected in Port Richey; the city levies its own fire impact fee instead, so $0 applies here.
    $0.00
Total (Port Richey): $15,337.00
Sources last checked Official fee schedules:City of Port Richey District School Board of Pasco County Pasco County Pasco County Fire Rescue

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port Richey: Multifamily Impact Fees

A new multifamily unit in Port Richey pays $9,885.50 per unit in impact fees (rates sourced November 16, 2026). Of that, Pasco County-levied fees account for $5,636.50 and municipal or utility fees for $4,249.00.

The largest line items are School Impact Fee (Pasco County) (MF) ($5,636.50), Wastewater (Sewer) Connection / Capacity Fee (City of Port Richey) (MF) ($1,600.00) and Water Connection / Capacity Fee (City of Port Richey) (MF) ($1,300.00).

View the Full Port Richey Impact Fee Schedule
Water$1,300.00
Sewer$1,600.00
City$1,349.00
County$5,636.50
  • School Impact Fee (Pasco County) (MF)
    District School Board of Pasco County
    Pasco County School Impact Fee, $5,636.50 per multifamily unit (complete permit applications on/after 1/1/2026; covers apartments, condos, townhomes, duplexes and ADUs). Applies countywide (incorporated and unincorporated) and is collected within the city. Four-year phase-in: $5,260.25 (2025), $5,636.50 (2026), $6,012.75 (from 1/1/2027), $6,389 (from 1/1/2028).
    $5,636.50
  • Parks & Recreation Impact Fee (Pasco County, in Port Richey) (MF)
    Pasco County
    Pasco County's parks and recreation impact fee applies only in cities that have opted to collect it. This city has not, so the county parks fee is not charged here.
    $0.00
  • Library Impact Fee (Pasco County, in Port Richey) (MF)
    Pasco County
    Pasco County's library impact fee is charged inside a city only when the county and the city have signed a collection agreement. No such agreement is in place here, so this fee does not apply.
    $0.00
  • Rescue Service Impact Fee (Pasco County, in Port Richey) (MF)
    Pasco County Fire Rescue
    The Pasco County fire/rescue impact fee is not collected in Port Richey; the city levies its own fire impact fee instead, so $0 applies here.
    $0.00
Total (Port Richey): $9,885.50
Sources last checked Official fee schedules:City of Port Richey District School Board of Pasco County Pasco County Pasco County Fire Rescue

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port Richey: Commercial Impact Fees

Commercial development in Port Richey pays $2.93 per square foot in impact fees, plus $7,250.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to at least $153,850.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Port Richey) — 1" meter ($4,000.00 one-time), Water Impact Fee (City of Port Richey) — 1" meter ($3,250.00 one-time) and Transportation Impact Fee (City of Port Richey, Commercial) ($2.62/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Stormwater Impact Fee (City of Port Richey, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Port Richey Impact Fee Schedule
Water$3,250.00 one-time
  • Water Impact Fee (City of Port Richey) — 1" meter
    City of Port Richey
    City of Port Richey water impact fee by meter size, inside city limits (Code Sec. 113-90): $1,300 for a 5/8 x 3/4 inch meter times the AWWA meter factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Connections outside city limits pay 125%. Due at connection or building permit issuance.
    $3,250.00 one-time
Sewer$4,000.00 one-time
  • Sewer Impact Fee (City of Port Richey) — 1" meter
    City of Port Richey
    City of Port Richey wastewater impact fee by meter size, inside city limits (Code Sec. 113-118): $1,600 for a 5/8 x 3/4 inch meter times the AWWA meter factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Connections outside city limits pay 120%. Due at connection or building permit issuance.
    $4,000.00 one-time
City$2.93/sq ft
  • Transportation Impact Fee (City of Port Richey, Commercial)
    City of Port Richey
    Port Richey transportation impact fee for retail and commercial construction: $2,623 per 1,000 sq ft (2026 rate, Resolution 25-19, Strip Retail Plaza under 40,000 sq ft, the schedule's general retail row). The schedule prints no mid-size retail row: a shopping center over 150,000 sq ft pays $1,783 and a free-standing discount store $2,594 per 1,000 sq ft. Rises to $2,885 in 2027 and $3,147 in 2028. Due when the building permit is issued.
    $2.62/sq ft
  • Fire Impact Fee (City of Port Richey, Commercial)
    City of Port Richey
    City of Port Richey fire impact fee for retail and commercial development: $210 in 2026, rising to $231 in 2027 and $252 in 2028 (Code Sec. 113-53, Ord. 25-730). Charged per 1,000 sq ft of building area. Paid when the building permit is issued.
    $0.21/sq ft
  • Police Impact Fee (City of Port Richey, Commercial)
    City of Port Richey
    City of Port Richey police impact fee for retail and commercial development: $99 in 2026, rising to $108 in 2027 and $118 in 2028 (Code Sec. 113-53, Ord. 25-730). Charged per 1,000 sq ft of building area. Paid when the building permit is issued.
    $0.10/sq ft
  • Stormwater Impact Fee (City of Port Richey, Commercial)
    City of Port Richey
    Port Richey also charges new nonresidential development a stormwater impact fee of $810 per equivalent stormwater unit (ESU), where one ESU is 3,250 square feet of impervious area and every property pays at least one ESU ($810). The total depends on the site's paved and roofed area, so it is not included in the estimate. It applies where the city stormwater system serves the property.
    Requires confirmation
County$0.00
Total (Port Richey): $2.93/sq ft + $7,250.00 one-time (≈ $153,850.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Port Richey Pasco County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port Richey: Industrial Impact Fees

Industrial development in Port Richey pays $0.30 per square foot in impact fees, plus $7,250.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to at least $22,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Port Richey) — 1" meter ($4,000.00 one-time), Water Impact Fee (City of Port Richey) — 1" meter ($3,250.00 one-time) and Transportation Impact Fee (City of Port Richey, Industrial) ($0.23/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Stormwater Impact Fee (City of Port Richey, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Port Richey Impact Fee Schedule
Water$3,250.00 one-time
  • Water Impact Fee (City of Port Richey) — 1" meter
    City of Port Richey
    City of Port Richey water impact fee by meter size, inside city limits (Code Sec. 113-90): $1,300 for a 5/8 x 3/4 inch meter times the AWWA meter factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Connections outside city limits pay 125%. Due at connection or building permit issuance.
    $3,250.00 one-time
Sewer$4,000.00 one-time
  • Sewer Impact Fee (City of Port Richey) — 1" meter
    City of Port Richey
    City of Port Richey wastewater impact fee by meter size, inside city limits (Code Sec. 113-118): $1,600 for a 5/8 x 3/4 inch meter times the AWWA meter factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Connections outside city limits pay 120%. Due at connection or building permit issuance.
    $4,000.00 one-time
City$0.30/sq ft
  • Transportation Impact Fee (City of Port Richey, Industrial)
    City of Port Richey
    Port Richey transportation impact fee for general light industrial buildings: $234 per 1,000 sq ft (2026 rate, Resolution 25-19), rising to $258 in 2027 and $281 in 2028. Warehousing pays $82. Due when the building permit is issued.
    $0.23/sq ft
  • Fire Impact Fee (City of Port Richey, Industrial)
    City of Port Richey
    City of Port Richey fire impact fee for industrial and warehouse development: $42 in 2026, rising to $46 in 2027 and $50 in 2028 (Code Sec. 113-53, Ord. 25-730). Charged per 1,000 sq ft of building area. Paid when the building permit is issued.
    $0.04/sq ft
  • Police Impact Fee (City of Port Richey, Industrial)
    City of Port Richey
    City of Port Richey police impact fee for industrial and warehouse development: $19 in 2026, rising to $21 in 2027 and $23 in 2028 (Code Sec. 113-53, Ord. 25-730). Charged per 1,000 sq ft of building area. Paid when the building permit is issued.
    $0.02/sq ft
  • Stormwater Impact Fee (City of Port Richey, Industrial)
    City of Port Richey
    Port Richey also charges new nonresidential development a stormwater impact fee of $810 per equivalent stormwater unit (ESU), where one ESU is 3,250 square feet of impervious area and every property pays at least one ESU ($810). The total depends on the site's paved and roofed area, so it is not included in the estimate. It applies where the city stormwater system serves the property.
    Requires confirmation
County$0.00
Total (Port Richey): $0.30/sq ft + $7,250.00 one-time (≈ $22,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Port Richey Pasco County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port Richey: Office Impact Fees

Office development in Port Richey pays $0.58 per square foot in impact fees, plus $7,250.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 25,000 sq ft building, that comes to at least $21,825.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Port Richey) — 1" meter ($4,000.00 one-time), Water Impact Fee (City of Port Richey) — 1" meter ($3,250.00 one-time) and Transportation Impact Fee (City of Port Richey, Office) ($0.52/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Stormwater Impact Fee (City of Port Richey, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Port Richey Impact Fee Schedule
Water$3,250.00 one-time
  • Water Impact Fee (City of Port Richey) — 1" meter
    City of Port Richey
    City of Port Richey water impact fee by meter size, inside city limits (Code Sec. 113-90): $1,300 for a 5/8 x 3/4 inch meter times the AWWA meter factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Connections outside city limits pay 125%. Due at connection or building permit issuance.
    $3,250.00 one-time
Sewer$4,000.00 one-time
  • Sewer Impact Fee (City of Port Richey) — 1" meter
    City of Port Richey
    City of Port Richey wastewater impact fee by meter size, inside city limits (Code Sec. 113-118): $1,600 for a 5/8 x 3/4 inch meter times the AWWA meter factor (1 inch 2.5, 1.5 inch 5, 2 inch 8, 3 inch 15, 4 inch 25, 6 inch 50, 8 inch 80). Connections outside city limits pay 120%. Due at connection or building permit issuance.
    $4,000.00 one-time
City$0.58/sq ft
  • Transportation Impact Fee (City of Port Richey, Office)
    City of Port Richey
    Port Richey transportation impact fee for general office buildings: $522 per 1,000 sq ft (2026 rate, Resolution 25-19), rising to $574 in 2027 and $626 in 2028. Due when the building permit is issued.
    $0.52/sq ft
  • Fire Impact Fee (City of Port Richey, Office)
    City of Port Richey
    City of Port Richey fire impact fee for office and institutional development: $42 in 2026, rising to $46 in 2027 and $50 in 2028 (Code Sec. 113-53, Ord. 25-730). Charged per 1,000 sq ft of building area. Paid when the building permit is issued.
    $0.04/sq ft
  • Police Impact Fee (City of Port Richey, Office)
    City of Port Richey
    City of Port Richey police impact fee for office and institutional development: $19 in 2026, rising to $21 in 2027 and $23 in 2028 (Code Sec. 113-53, Ord. 25-730). Charged per 1,000 sq ft of building area. Paid when the building permit is issued.
    $0.02/sq ft
  • Stormwater Impact Fee (City of Port Richey, Office)
    City of Port Richey
    Port Richey also charges new nonresidential development a stormwater impact fee of $810 per equivalent stormwater unit (ESU), where one ESU is 3,250 square feet of impervious area and every property pays at least one ESU ($810). The total depends on the site's paved and roofed area, so it is not included in the estimate. It applies where the city stormwater system serves the property.
    Requires confirmation
County$0.00
  • Mobility Fee (Pasco County, in Port Richey, Office)
    Pasco County
    Pasco County's mobility fee applies inside a city only where the city joins the county program by interlocal agreement. Port Richey charges its own transportation impact fee, and no county mobility fee is shown for the city.
    $0.00
  • Rescue Service Impact Fee (Pasco County, in Port Richey, Office)
    Pasco County
    The Pasco County rescue service impact fee reaches Port Richey only if the city signs an interlocal agreement requiring it; Port Richey levies its own fire impact fee instead, so the county fee is not charged here.
    $0.00
Total (Port Richey): $0.58/sq ft + $7,250.00 one-time (≈ $21,825.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Port Richey Pasco County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pasco County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port Richey Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Port Richey Impact Fee FAQs

What are the total impact fees for a single-family home in Port Richey, Florida?

A new single-family home in Port Richey pays $15,337.00 per unit in combined impact fees (rates sourced November 16, 2026).

How much are commercial impact fees in Port Richey?

Commercial development in Port Richey pays $2.93 per square foot in impact fees, plus $7,250.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $153,850.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Port Richey charge its own impact fees?

Yes. Port Richey levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Port Richey, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pasco County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.