IMPACTFEES.ORG

Bushnell, Florida Impact Fees

Bushnell applies its own fee schedule: municipal fees plus the Sumter County-levied fees that apply inside city limits. Combined, a new single-family home pays $7,457.00 per unit (rates sourced ). The full breakdown is below.

Bushnell impact fees by project type

Bushnell: Single-Family Impact Fees

A new single-family home in Bushnell pays $7,457.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $3,332.00 and municipal or utility fees for $4,125.00.

The largest line items are Road Impact Fee (Sumter County) ($3,332.00), Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00) and Water Capacity Reservation Charge (City of Bushnell) ($1,125.00).

View the full Bushnell impact fee schedule
Water$1,125.00
  • Water Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    City of Bushnell water capacity reservation charge: $1,125 per ERU (a single-family connection is one ERU). The first two ERUs are waived for new development on the ad-valorem tax roll. Separate connection and meter-installation charges apply.
    $1,125.00
Sewer$3,000.00
City$0.00
County$3,332.00
  • Road Impact Fee (Sumter County)
    Sumter County
    Sumter County Road Impact Fee, single-family detached: $3,332 per home (Phase II, effective 1/1/2026). Levied countywide, including in incorporated cities. Scheduled increases: $3,665 on 1/1/2027 and $3,999 on 1/1/2028.
    $3,332.00
Total (Bushnell): $7,457.00
Sources last checked Official fee schedules:City of Bushnell Sumter County

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bushnell: Multifamily Impact Fees

A new multifamily unit in Bushnell pays $5,898.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $1,773.00 and municipal or utility fees for $4,125.00.

The largest line items are Sewer Capacity Reservation Charge (City of Bushnell, MF) ($3,000.00), Road Impact Fee (Sumter County, MF) ($1,773.00) and Water Capacity Reservation Charge (City of Bushnell, MF) ($1,125.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Bushnell impact fee schedule
Water$1,125.00
  • Water Capacity Reservation Charge (City of Bushnell, MF)
    City of Bushnell
    City of Bushnell water capacity reservation charge: $1,125 per unit (each multifamily unit counts as one ERU). Separate connection and meter charges apply; a two-ERU waiver applies to ad-valorem-taxed development.
    $1,125.00
Sewer$3,000.00
City$0.00
County$1,773.00
  • Road Impact Fee (Sumter County, MF)
    Mid/High-Rise 4+ floors
    Sumter County
    Sumter County Road Impact Fee, multifamily (4+ floors): $1,773 per unit (Phase II, effective 1/1/2026). Levied countywide. Scheduled increases: $1,950 on 1/1/2027 and $2,128 on 1/1/2028. This is the default multifamily tier; units in 1-3 floor buildings pay $2,389.
    $1,773.00
Total (Bushnell): $5,898.00
Sources last checked Official fee schedules:City of Bushnell Sumter County

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bushnell: Commercial Impact Fees

Commercial development in Bushnell pays $4.72 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $240,025.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00 one-time), Water Capacity Reservation Charge (City of Bushnell) ($1,125.00 one-time) and Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).

Municipal Impact Fee (City of Bushnell, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Bushnell impact fee schedule
Water$1,125.00 one-time
  • Water Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    Water capacity reservation charge of $1,125 per ERU (1 ERU = 250 gpd). The first 2 ERU are waived for development subject to ad valorem taxation. The amount shown is the one-ERU minimum; nonresidential ERU is based on estimated daily flow. A separate connection/meter charge applies at cost.
    $1,125.00 one-time
Sewer$3,000.00 one-time
  • Sewer Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    Sewer capacity reservation charge of $3,000 per ERU (1 ERU = 250 gpd). The first 2 ERU are waived for development subject to ad valorem taxation. The amount shown is the one-ERU minimum; nonresidential ERU is based on estimated daily flow. A separate connection charge applies at cost.
    $3,000.00 one-time
City$0.00
County$4.72/sq ft
  • Road Impact Fee (Sumter County, Commercial)
    Sumter County
    Current rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $5,190 per 1,000 sq ft on January 1, 2027; $5,661 on January 1, 2028. Applies countywide, including within incorporated municipalities.
    $4.72/sq ft
Total (Bushnell): $4.72/sq ft + $4,125.00 one-time (≈ $240,025.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bushnell Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bushnell: Industrial Impact Fees

Industrial development in Bushnell pays $1.51 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $79,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00 one-time), Water Capacity Reservation Charge (City of Bushnell) ($1,125.00 one-time) and Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).

Municipal Impact Fee (City of Bushnell, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Bushnell impact fee schedule
Water$1,125.00 one-time
  • Water Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    Water capacity reservation charge of $1,125 per ERU (1 ERU = 250 gpd). The first 2 ERU are waived for development subject to ad valorem taxation. The amount shown is the one-ERU minimum; nonresidential ERU is based on estimated daily flow. A separate connection/meter charge applies at cost.
    $1,125.00 one-time
Sewer$3,000.00 one-time
  • Sewer Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    Sewer capacity reservation charge of $3,000 per ERU (1 ERU = 250 gpd). The first 2 ERU are waived for development subject to ad valorem taxation. The amount shown is the one-ERU minimum; nonresidential ERU is based on estimated daily flow. A separate connection charge applies at cost.
    $3,000.00 one-time
City$0.00
County$1.51/sq ft
  • Road Impact Fee (Sumter County, Industrial)
    Sumter County
    Current rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $1,657 per 1,000 sq ft on January 1, 2027; $1,806 on January 1, 2028. Applies countywide, including within incorporated municipalities.
    $1.51/sq ft
Total (Bushnell): $1.51/sq ft + $4,125.00 one-time (≈ $79,425.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Bushnell Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bushnell: Office Impact Fees

Office development in Bushnell pays $2.96 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to at least $78,100.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00 one-time), Water Capacity Reservation Charge (City of Bushnell) ($1,125.00 one-time) and Road Impact Fee (Sumter County, Office) ($2.96/sq ft).

Municipal Impact Fee (City of Bushnell, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Bushnell impact fee schedule
Water$1,125.00 one-time
  • Water Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    Water capacity reservation charge of $1,125 per ERU (1 ERU = 250 gpd). The first 2 ERU are waived for development subject to ad valorem taxation. The amount shown is the one-ERU minimum; nonresidential ERU is based on estimated daily flow. A separate connection/meter charge applies at cost.
    $1,125.00 one-time
Sewer$3,000.00 one-time
  • Sewer Capacity Reservation Charge (City of Bushnell)
    City of Bushnell
    Sewer capacity reservation charge of $3,000 per ERU (1 ERU = 250 gpd). The first 2 ERU are waived for development subject to ad valorem taxation. The amount shown is the one-ERU minimum; nonresidential ERU is based on estimated daily flow. A separate connection charge applies at cost.
    $3,000.00 one-time
City$0.00
County$2.96/sq ft
  • Road Impact Fee (Sumter County, Office)
    Sumter County
    Current rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $3,255 per 1,000 sq ft on January 1, 2027; $3,550 on January 1, 2028. Applies countywide, including within incorporated municipalities.
    $2.96/sq ft
Total (Bushnell): $2.96/sq ft + $4,125.00 one-time (≈ $78,100.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Bushnell Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bushnell impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Bushnell impact fee FAQs

What are the total impact fees for a single-family home in Bushnell, Florida?

A new single-family home in Bushnell pays $7,457.00 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Bushnell?

Commercial development in Bushnell pays $4.72 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees, at least $240,025.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Bushnell charge its own impact fees?

Yes. Bushnell levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bushnell, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Sumter County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000