A new single-family home in Bushnell pays at least $7,457.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $3,332.00 and municipal or utility fees for $4,125.00.
The largest line items are Road Impact Fee (Sumter County) ($3,332.00), Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00) and Water Capacity Reservation Charge (City of Bushnell) ($1,125.00).
Municipal Impact Fees (City of Bushnell) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capacity Reservation Charge (City of Bushnell)$1,125.00City of BushnellCity of Bushnell municipal water. Capacity reservation charge $1,125.00 per ERU (1 ERU = 1 single-family connection). Code Ch.27 Art.III Div.6 Sec.27-411 (Ord. 2017-14; first two ERU waived for ad-valorem-taxed new development). Municode current Dec 12 2025. Separate connection/meter-installation charges (Subdiv.2) also apply — VERIFY 352-793-2591.
- Sewer Capacity Reservation Charge (City of Bushnell)$3,000.00City of BushnellCity of Bushnell municipal sewer. Capacity reservation charge $3,000.00 per ERU. Code Ch.27 Art.III Div.6 Sec.27-411 (Ord. 2017-14). Municode current Dec 12 2025. Plus connection/meter charges (Subdiv.2) — VERIFY 352-793-2591.
- Municipal Impact Fees (City of Bushnell)Requires confirmationCity of Bushnell⚠️VERIFY. No separate municipal parks/police/fire impact fees found in Bushnell Code (Municode). Development impact captured via county Road fee + city W/S capacity charges. VERIFY none exist: City Hall 352-793-2591.
- Road Impact Fee (Sumter County)$3,332.00Sumter CountySumter County Road Impact Fee applies in incorporated cities (Sec.20-33 + municipal participation Sec.20-35). CURRENT=Phase II eff 1/1/2026, Single Family Detached $3,332. Phase III 1/1/2027 $3,665; Phase IV 1/1/2028 $3,999.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bushnell: Multifamily Impact Fees
A new multifamily unit in Bushnell pays at least $5,898.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $1,773.00 and municipal or utility fees for $4,125.00.
The largest line items are Sewer Capacity Reservation Charge (City of Bushnell, MF) ($3,000.00), Road Impact Fee (Sumter County, MF) ($1,773.00) and Water Capacity Reservation Charge (City of Bushnell, MF) ($1,125.00).
Municipal Impact Fees (City of Bushnell, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Reservation Charge (City of Bushnell, MF)$1,125.00City of BushnellCity of Bushnell water capacity reservation charge $1,125.00 per ERU (Sec.27-411/27-413, Ord.2017-14). Per Sec.27-413, each multifamily/apartment/condo unit = 1 ERU, so MF = $1,125/unit (confirmed 7/16/2026). Municode current Dec 2025.
- Sewer Capacity Reservation Charge (City of Bushnell, MF)$3,000.00City of BushnellCity of Bushnell sewer capacity reservation charge $3,000.00 per ERU (Sec.27-411/27-413, Ord.2017-14). Per Sec.27-413, each multifamily/apartment/condo unit = 1 ERU, so MF = $3,000/unit (confirmed 7/16/2026). Municode current Dec 2025.
- Municipal Impact Fees (City of Bushnell, MF)Requires confirmationCity of Bushnell⚠️VERIFY. No separate municipal parks/police/fire impact fees found in Bushnell Code. City Hall 352-793-2591.
- Road Impact Fee (Sumter County, MF)$1,773.00Sumter CountySumter County Road Impact Fee (MF 4+ floors) applies in Bushnell. Phase II eff 1/1/2026 $1,773/du. Default MF tier.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bushnell: Commercial Impact Fees
Commercial development in Bushnell pays $4.72 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $240,025.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00 one-time), Water Capacity Reservation Charge (City of Bushnell) ($1,125.00 one-time) and Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).
Municipal Impact Fee (City of Bushnell, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capacity Reservation Charge (City of Bushnell)$1,125.00 one-timeCity of BushnellNonres/commercial/industrial water capacity reservation charge = $1,125.00 per ERU (Ord. 2017-14; Code Ch.27 Art.III Div.6 §§27-411/415/416). 1 ERU = 250 gpd; nonres ERU = est. daily flow ÷ 250 (min 1.0 ERU per meter/use) per §27-416 flow schedule (e.g. general office 0.24 gpd/sf) or fixture-unit form ÷ 10 — NO meter-size table. 1-ERU minimum entered as default. First 2 ERU waived for ad-valorem-taxed development; plus connection/meter install at 100% of cost (§§27-446/447). Municode current Dec 2025.
- Sewer Capacity Reservation Charge (City of Bushnell)$3,000.00 one-timeCity of BushnellNonres/commercial/industrial sewer capacity reservation charge = $3,000.00 per ERU (Ord. 2017-14; Code Ch.27 Art.III Div.6 §§27-411/415/416). 1 ERU = 250 gpd; nonres ERU = est. daily flow ÷ 250 (min 1.0 ERU) per §27-416 flow schedule or fixture-unit form ÷ 10 — NO meter-size table. 1-ERU minimum entered as default. First 2 ERU waived for ad-valorem-taxed development; plus connection at 100% of cost (§27-446). Municode current Dec 2025.
- Municipal Impact Fee (City of Bushnell, Commercial)Requires confirmationCity of Bushnell$0 placeholder. No municipal (parks/police/fire) impact fees found in Bushnell Code (Municode, incl. Ch.27). Nonres development impact captured via county Road fee + city W/S capacity charges. Verify none set by resolution: City Hall 352-793-2591.
- Road Impact Fee (Sumter County, Commercial)$4.72/sq ftSumter CountySumter County Road Impact Fee — Code Ch.20 Art.III Div.4 §20-66 (Ord. 2024-30; Benesch study 5/14/2024; set at 40% of max). Applies COUNTYWIDE incl. cities (§20-33(3), §20-35 municipal participation). Schedule row: ITE 821 Retail 40,000–150,000 sfgla = $4,718 per 1,000 sfgla (GLA basis). CURRENT = Phase II eff 1/1/2026; steps up each Jan 1: Phase III 1/1/2027 $5,190; Phase IV 1/1/2028 $5,661.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bushnell: Industrial Impact Fees
Industrial development in Bushnell pays $1.51 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $79,425.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00 one-time), Water Capacity Reservation Charge (City of Bushnell) ($1,125.00 one-time) and Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).
Municipal Impact Fee (City of Bushnell, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capacity Reservation Charge (City of Bushnell)$1,125.00 one-timeCity of BushnellNonres/commercial/industrial water capacity reservation charge = $1,125.00 per ERU (Ord. 2017-14; Code Ch.27 Art.III Div.6 §§27-411/415/416). 1 ERU = 250 gpd; nonres ERU = est. daily flow ÷ 250 (min 1.0 ERU per meter/use) per §27-416 flow schedule (e.g. general office 0.24 gpd/sf) or fixture-unit form ÷ 10 — NO meter-size table. 1-ERU minimum entered as default. First 2 ERU waived for ad-valorem-taxed development; plus connection/meter install at 100% of cost (§§27-446/447). Municode current Dec 2025.
- Sewer Capacity Reservation Charge (City of Bushnell)$3,000.00 one-timeCity of BushnellNonres/commercial/industrial sewer capacity reservation charge = $3,000.00 per ERU (Ord. 2017-14; Code Ch.27 Art.III Div.6 §§27-411/415/416). 1 ERU = 250 gpd; nonres ERU = est. daily flow ÷ 250 (min 1.0 ERU) per §27-416 flow schedule or fixture-unit form ÷ 10 — NO meter-size table. 1-ERU minimum entered as default. First 2 ERU waived for ad-valorem-taxed development; plus connection at 100% of cost (§27-446). Municode current Dec 2025.
- Municipal Impact Fee (City of Bushnell, Industrial)Requires confirmationCity of Bushnell$0 placeholder. No municipal (parks/police/fire) impact fees found in Bushnell Code (Municode). Nonres impact via county Road fee + city W/S capacity charges. Verify: City Hall 352-793-2591.
- Road Impact Fee (Sumter County, Industrial)$1.51/sq ftSumter CountySumter County Road Impact Fee — Code Ch.20 Art.III Div.4 §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities (§20-33(3), §20-35). Schedule row: ITE 110 General Light Industrial = $1,506 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $1,657; Phase IV 1/1/2028 $1,806.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bushnell: Office Impact Fees
Office development in Bushnell pays $2.96 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to at least $78,100.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Reservation Charge (City of Bushnell) ($3,000.00 one-time), Water Capacity Reservation Charge (City of Bushnell) ($1,125.00 one-time) and Road Impact Fee (Sumter County, Office) ($2.96/sq ft).
Municipal Impact Fee (City of Bushnell, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capacity Reservation Charge (City of Bushnell)$1,125.00 one-timeCity of BushnellNonres/commercial/industrial water capacity reservation charge = $1,125.00 per ERU (Ord. 2017-14; Code Ch.27 Art.III Div.6 §§27-411/415/416). 1 ERU = 250 gpd; nonres ERU = est. daily flow ÷ 250 (min 1.0 ERU per meter/use) per §27-416 flow schedule (e.g. general office 0.24 gpd/sf) or fixture-unit form ÷ 10 — NO meter-size table. 1-ERU minimum entered as default. First 2 ERU waived for ad-valorem-taxed development; plus connection/meter install at 100% of cost (§§27-446/447). Municode current Dec 2025.
- Sewer Capacity Reservation Charge (City of Bushnell)$3,000.00 one-timeCity of BushnellNonres/commercial/industrial sewer capacity reservation charge = $3,000.00 per ERU (Ord. 2017-14; Code Ch.27 Art.III Div.6 §§27-411/415/416). 1 ERU = 250 gpd; nonres ERU = est. daily flow ÷ 250 (min 1.0 ERU) per §27-416 flow schedule or fixture-unit form ÷ 10 — NO meter-size table. 1-ERU minimum entered as default. First 2 ERU waived for ad-valorem-taxed development; plus connection at 100% of cost (§27-446). Municode current Dec 2025.
- Municipal Impact Fee (City of Bushnell, Office)Requires confirmationCity of Bushnell$0 placeholder. No municipal (parks/police/fire) impact fees found in Bushnell Code (Municode). Nonres impact via county Road fee + city W/S capacity charges. Verify: City Hall 352-793-2591.
- Road Impact Fee (Sumter County, Office)$2.96/sq ftSumter CountySumter County Road Impact Fee — Code Ch.20 Art.III Div.4 §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities (§20-33(3), §20-35). Schedule row: ITE 710 General Office = $2,959 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $3,255; Phase IV 1/1/2028 $3,550.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Bushnell
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Bushnell, Florida?
A new single-family home in Bushnell pays at least $7,457.00 per unit in combined impact fees (rates sourced July 18, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Bushnell?
Commercial development in Bushnell pays $4.72 per square foot in impact fees, plus $4,125.00 in one-time water and sewer connection fees, at least $240,025.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Bushnell charge its own impact fees?
Yes. Bushnell levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bushnell, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Sumter County impact fees page.